Permit Information
Permit NumberBLD04-00448
StatusFinaled
Name ST ALPHONSUS (BRIDGE SUPPORT)
Site Address 1055 N CURTIS RD
Project NameST ALS-BRIDGE SUPPORT/DEMO
Customer Number 
ePlanReviewNo
Description
(SAINT ALPHONSUS REGIONAL MEDICAL CENTER, BID PACKAGE #1A, BRIDGE SUPPORT, DEMOLITION & EXIT SYSTEMS MAINTENANCE) New work includes construction of 2-hour exit passageway to maintain exit system past new construction at two locations; then, demolition of the existing north side entrance canopy / lobby, McCleary conference center, and 3rd level of the bridge-link; to remodel the 2nd level of the bridge-link for vital utilities, sprinkler / alarm systems and access between north & south towers (all other uses of the bridge-link are eliminated); to provide new structural, fire-resistive, steal / concrete columns, extended below the proposed future basement excavation depths and FR steal beams to support the remaining link on the new columns; to remove the existing beams & columns under link, all per approved plans, notes thereon by reviewing agencies and all reviewing agency attached plan reveiw comments and conditons as part of the approved plans. A bond for $2,001,653 is posted for the demolition work. PC04-125/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection10/6/200410/7/200410/7/2004APASS
DetailsTroy Cobbley
Fire life safety finaled 10/7/2004 9:04:47 AM
BLD-Final10/7/200410/7/200410/7/2004PPASS
DetailsTom Arcoraci
cecil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 10/7/2004 2:31:53 PM
Letter of compliance  10/7/2004 DONE
Letter of Compliance issued 10-7-04.
FIRE-Final Inspection9/24/20049/27/20049/27/2004AFAIL
DetailsTroy Cobbley
Need fire alarm sign off 9/27/2004 2:57:11 PM
FIRE-Final Inspection9/24/20049/27/20049/27/2004AFAIL
DetailsTroy Cobbley
Need fire alarm sign off 9/27/2004 2:57:11 PM
BLD-Aging Inspection9/1/20049/1/20049/1/2004 NR
DetailsTom Arcoraci
BLD-Framing/Rough-in7/2/20047/2/20047/2/2004APART
DetailsTom Arcoraci
walls in demo ok wip 7/2/2004 11:19:23 AM
Inspection Record Card- Bld  6/4/2004 DONE
Permit Ready to Issue  6/4/2004 DONE
Telephone call  6/4/2004 DONE
Permit ready and fee due
Issue PAID IN FULL permit  6/4/2004 DONE
Inspection Record Card- Bld  6/4/2004 DONE
Print Occupancy Form  6/4/2004 DONE
Plan assigned to (DRS)3/16/2004 6/3/2004 PASS
DetailsDan Stuart
6/3/2004 10:19:27 DRS - activity updated through activity BLDA022 from case BLD04-00448.
Routing - PLAN CHECK5/10/2004 6/3/2004 PASS
5/26/04 - Have received all required resubmittals for plans and from structural outside 3rd party engineering for approval of plans. Issuance of permit pending the issuance of a bond permit through Cathy Weisshaupt. Incorrect data has been submitted for bond and certificate of liability insurance.
6/3/04 - Cathy Weisshaupt received required bond and liability insurance data. I received a new certificate of value from Jeff Cramer increaseing value from $900,000.00 to $1,681,635.00 value.
Telephone call  6/3/2004 DONE
Called Jeff Cramer to verify the original CV amount of $900,000.00 vs. the bond amount of $2,001,635 which was set based on declaration to Bob Archibald of the cost for new work needing to be completed prior to the demolition needed to be done in order to prepare for new construction of the central tower. Jeff will check on amount and call me back. A new CV will be required if the value has changed before I can take plans to permit desk for issuing.
Telephone call  6/3/2004 DONE
Jeff Cramer has gathered new values from contractor that indicate approximately $1,681,635.00 for construction cost & demo. The difference between the bond amount and the declared value is based on the bond being at approximately 120% of cost that would cover costs if the project was default and the City of Boise was required to complete minimum safety requirements.
Received Certificate of Value  6/3/2004 DONE
Received fax for new Certificate of Value for the project from Jeff Cramer. Went from $900,000.00 to $1,681,635.00 with nbond amount being based on approximately 120% of project cost at $2,001,635.00.
PLANS/APPL TAKEN TO FRONT DESK  6/3/2004 PASS
To permit desk for issuing permit. New certificate of value attached to plans.
Meeting  5/26/2004 DONE
Reviewed status of bond I liability insurance certificate with Cathy Weisshaupt. She is still waiting and has faxed copies of corrections required to the insurance company and is waiting for them to provide right information. She had talked with representative yesterday concerning the matter.
Telephone call  5/25/2004 DONE
Talked with Dennis Adams of St. Al's to let him know all we lack for issuance of the permit for package 1A (Demo, new link support & relocated exit system) is the correct data for bond and certificate of liability insurance. He said he will call the bonding company again.
Telephone call  5/24/2004 DONE
Opened up plans to inser one copy of resubmittals received on 5/20/04. Saw that Sam Rogers had received response to fire code analyst concerns on fire department access at new construction site during the addition and what the site acess would be when addition is completed, Sheets G-002-1A & G-1003-1A. Only one set of resubmittals were in plans. Call Jeff to request additional set so both plans would have same sheets.He was not in yet so I left a voice message.
Plan resubmittals received  5/24/2004 DONE
Received letter of transmittal with one set of sheets AD112A-1A, AD112B-1A, AD123A-1A,E112B-1A,SB001-1A taken to Dan S.
Telephone call  5/22/2004 DONE
Called for Jeff Cramer, HDR. Had received one copy of resubmittals & addendums. Ask for additional set to provide one new set for each oroginal plans submitted. Left voice mail as Jeff was gone for day.
Plan resubmittals received  5/21/2004 DONE
Received Transmittal Letter, and 1 Addendum Number 2 booklet. 1 Set SB001-1A, AD112A-1A, AD112B-1A, AD123A-1A, E112B-1A ... Taken to Dan Stuart.
Routing Off Site - STRUCTURAL5/3/2004 5/10/2004 PASS
Recieved e-mail approval notice from Wayne Kohler for structural engineering resubmittals for this project.
Meeting  5/6/2004 DONE
Met with Bob Archibald. Bob had received copy of contractor bid amount for this project and had agreed with Dennis Adams of SARMC that this would be the amount on which the bond will be set. Dennis is providing a cerificate of liability insurance and posting of the bond through Cathy Weisshaupt. I will be notified when the BND permit is issued.
Routing - PLAN CHECK4/15/2004 4/30/2004 FAIL
Resubmittal documents provided in response to outside structural engineering review assembled with copy to front desk to route back to structural reviewing engineer. Gave to Darla.
Plan resubmittals received  4/30/2004 DONE
3 sets of sheet SB001-1A, 1 geotechnical report and 1 updated structural calcs received and forwarded to Dan Stuart.
Telephone call  4/30/2004 DONE
Called Jeff Cramer, HDR, to see what was happening concerning resubmittals for outside structural plan review, my non-structural plan review comments and determining who would be responsible for bonding and having them get with Bob Archibald to establish the amount of the bond. Jeff said I would receive structural review response late today to forward to third party structural review engineer; and woudl follow up with SARMC to determine who will get the bond.
Routing - FIRE4/13/2004 4/15/2004 PASS
AS and FA permits required prior to demo/modification of those systems; Review faxed to architect.
Plan resubmittals received  4/14/2004 DONE
Received transmittal letter to Sam Rogers with sheets G-003-1A, G-002-1A taken to Sam Rogers
Routing - PLAN CHECK3/23/2004 4/13/2004 FAIL
Copy of correction to Jeff Crammer by e-mail.
Telephone call  4/7/2004 DONE
Call from Jeff Cramer asking if the design structural engineer, Randy Hagens, HDR in Texas office could talk directly with city contracted third party structural plan review engineer. I obtained Randy's phone number and said I would call structural review engineer and discuss possibility.
Telephone call  4/7/2004 DONE
Called contracted third party engineering firm and ask if the review engineer would object to talking with Randy Hagens concerning item #3 of their plan review concerning calculations needed that where not originally furnished so the desired data could be provided. I gave Randy's phone number to them and they said they would call.
Telephone call  4/7/2004 DONE
Called Jeff Cramer back to let him know the reviewing engineer would call the design engineer to review what calculation data is required.
Plan resubmittals requested  4/5/2004 DONE
Copy of structural engineering third party review with cover letter faxed and mailed to architect, Jeff Cramer, HDR, INC.
Routing Off Site - STRUCTURAL3/22/2004 4/1/2004 FAIL
Contacted PDQ to take resubmitted plans of 3/22/04 to outside engineering. kmm
4/5/04 - Received e-mail report from third party structural review. Resubmittals are required. Faxed and mailed copy of report with cover letter to Jeff Cramer for response.
Routing Off Site - STRUCTURAL3/17/2004 4/1/2004 FAIL
Contacted PDQ to take to outside engingeering. 4/5/04 - Received e-mail report from third party structural review. Resubmittals are required. Faxed and mailed copy of report with cover letter to Jeff Cramer for response.
Routing - PLANNING3/19/2004 3/23/2004 PASS
Sign off for CUP (KLG) and DRH (SRS). Ok for demo.
Plan resubmittals received  3/22/2004 DONE
Received three copies of revised sheets SB001-1A, SB002-1A and SB003-1A. Routed to Dan S. kmm
Routing - Erosion and Sediment3/17/2004 3/18/2004 PASS
ESC approved with conditions attached to plans.
Plan routing begun/TENANTS  3/17/2004 DONE
Routing - PUBLIC WORKS3/17/2004 3/17/2004 DONE
Plans ACCEPTED BY PLAN TECH  3/17/2004 DONE
Received two copies of struct. calcs. Put one with outside engineering copy and one with Dan Stuart. kmm
Plans ACCEPTED BY PLAN TECH  3/16/2004 PEND
I called Jeff to let him know we needed the plan narrative for ESC and one more copy of the structural calcs. rad 3/17/04 Received ESC narrative. Put with plans. Still waiting for calcs. kmm
Application received  3/15/2004  
Recd Pcfee & Taken To Pln CK  3/15/2004  
Fee Review-notes3/15/20043/15/2004