BLD-Aging Inspection | 5/18/2005 | 5/18/2005 | 5/18/2005 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 5/18/2005 | 5/18/2005 | 5/18/2005 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 2/9/2005 | 2/10/2005 | 2/10/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 11:56:56 AM. Contact: ###-####.
|
BLD-Final | 2/8/2005 | 2/9/2005 | 2/9/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/8/2005 at 12:22:39 PM. Contact: ###-####.
|
FIRE-Final Inspection | 2/8/2005 | 2/8/2005 | 2/8/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 2/8/2005 12:24:59 PM
|
Code Occupancy Approval | 2/7/2005 | 2/7/2005 | 2/7/2005 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 2/7/2005 12:33:09 PM
|
FIRE-Final Inspection | 1/27/2005 | 1/27/2005 | 1/27/2005 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 9:05:48 AM. Contact: ###-####. Will need duct detectors on all RTU's per plans 1/27/2005 3:18:33 PM
|
Case Summary (BLD) | | | 1/5/2005 | | |
|
|
|
|
Code Occupancy Approval | 11/19/2004 | 11/19/2004 | 11/19/2004 | P | FAIL |
Wm. Michael Meloy
|
|
|
Inspection found that the patio on the southside of the building has not been complete. This item is listed as a tenant improvement area and not part of the overall shell approval. Tenant is Baja Fresh. Correction notice posted advising for the need of Bonding or complete for any occupancy. 11/19/2004 3:30:39 PM
|
BLD-Energy code compliance | 9/3/2004 | 9/7/2004 | 9/7/2004 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 3:04:52 PM. Contact: ###-####.
|
BLD-Energy code compliance | 9/2/2004 | 9/3/2004 | 9/3/2004 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/2/2004 at 10:02:22 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/31/2004 | 9/1/2004 | 9/1/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/31/2004 at 3:10:23 PM. Contact: ###-####. ok to insulate 9/1/2004 2:43:11 PM
|
BLD-Conference | 8/19/2004 | 8/20/2004 | 8/20/2004 | P | DONE |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/19/2004 at 2:10:34 PM. Contact: ###-####. Wanted to know if I wanted to look at the steel roof structure. Done by special inpsection. 8/20/2004 1:39:58 PM
|
BLD-Foundation | 7/9/2004 | 7/12/2004 | 7/12/2004 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/9/2004 at 1:17:11 PM. Contact: ###-####.
|
BLD-Foundation | 7/12/2004 | 7/12/2004 | 7/12/2004 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 7/8/2004 | 7/9/2004 | 7/9/2004 | P | PART |
Jim Storey
|
|
|
harry ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles placed with si /MTI pending reports for compliance. 7/9/2004 1:11:47 PM
|
Inspection Record Card- Bld | | | 7/8/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/16/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/15/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/14/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/10/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/8/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/8/2004 | | DONE |
|
|
|
|
Telephone call | | | 6/8/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (MLO) | 3/17/2004 | | 6/8/2004 | | PASS |
Mike Otto
|
|
|
6/8/2004 09:52:00 MLO - activity updated through activity BLDA022 from case BLD04-00450.
|
Routing - PLANNING | 6/4/2004 | | 6/7/2004 | | PASS |
|
|
|
Approve per revised site plan and per DRH03-200.
|
Plan resubmittals received | | | 6/4/2004 | | DONE |
|
|
|
Received letter of transmittal with two A-1.0 sheets taken to Mike Otto.
|
Routing - PLANNING Land Div | 5/28/2004 | | 5/28/2004 | | PASS |
|
|
|
Approved by ROS 4259.
|
Routing - PLANNING | 5/26/2004 | | 5/28/2004 | | FAIL |
|
|
|
Plans need to be revised per DRH03-200 conditions of approval. Landscaping changes may be red-lined corrections; however, the accessible handicap ramp from the public sidewalk to the walkway (condition 1b) needs to be drawn on the plans.
|
Routing Off Site - STRUCTURAL | 5/20/2004 | | 5/27/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/24/2004 | | DONE |
|
|
|
Received Transmittal Letter.1 Set , 3 Sheets of A-1.0 Taken to Mike Otto...
|
Routing - PLANNING | 5/20/2004 | | 5/21/2004 | | FAIL |
|
|
|
|
Routing - PLANNING Land Div | 5/21/2004 | | 5/21/2004 | | FAIL |
|
|
|
Site plan shows two parcels. Need to show proof of legal land division. Talked to Scott Hatter on May 21, 2004. Can issue permit if original parcel is not split or if parcel is eligible to be split, need new tax parcel number.
|
Routing - PLAN CHECK | 5/17/2004 | | 5/20/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/14/2004 | | DONE |
|
|
|
Received Transmittal Letter. 2 book-lets of calcs,a response letter to the itemized comments. 3 Sheets of A-4.0, 3 Sheets of A-8.1, 4 Sheets of EN-1, 6 Sheets of A-8.0 Taken to Mike Otto...
|
Routing - FIRE | 4/22/2004 | | 4/27/2004 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/17/2004 | | 4/22/2004 | | FAIL |
|
|
|
Contacted PDQ for outside engineering. kmm Corrections sent to architect. MLO
|
Plan resubmittals requested | | | 4/22/2004 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 4/15/2004 | | 4/22/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 4/12/2004 | | 4/15/2004 | | PASS |
|
|
|
1. kitchen drawings to be provided with ti? 2. need additional vent from outlet pipe of grease interceptor
|
Routing - Erosion and Sediment | 3/26/2004 | | 4/8/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING | 4/8/2004 | | 4/8/2004 | | FAIL |
|
|
|
Plans do not comply with DRH03-00200 conditions of approval.
|
Routing - PUBLIC WORKS | 3/19/2004 | | 3/26/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/22/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/22/2004 | | DONE |
|
|
|
Received four copies of revised sheet EN-1. Routed to Mike O. kmm
|
Plan routing begun/NEW & ADDTN | | | 3/17/2004 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 3/17/2004 | | 3/17/2004 | | PASS |
|
|
|
Approved. ROS 4259 with existing bank building.
|
Plans ACCEPTED BY PLAN TECH | | | 3/17/2004 | | DONE |
|
|
|
enevelope compliance cert. not signed. Contacted Randy Haverfield. kmm
|
Application received | | | 3/15/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/15/2004 | | DONE |
|
|
|
|
Fee Review-notes | 6/10/2004 | 6/10/2004 | | | |
|
|
|
|
Fee Review-notes | 3/15/2004 | 3/15/2004 | | | |
|
|
|
|