Third Notice BLD | 3/1/2006 | 3/1/2006 | 2/26/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 2/3/2006 | 2/3/2006 | 3/1/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 1/12/2006 | 1/12/2006 | 2/3/2006 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 1/12/2006 | 1/12/2006 | 1/12/2006 | P | PASS |
Jim Storey
|
|
|
reuqest 4pm//wes watts; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 1/12/2006 | 1/12/2006 | 1/12/2006 | P | PASS |
Jim Storey
|
|
|
l/c
|
BLD-Final | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/21/2005 at 9:44:16 PM. Contact: ###-####. c/n ibc 1009.4/1009.11/1012.1
|
Code Occupancy Approval | 11/18/2005 | 11/18/2005 | 11/18/2005 | P | PASS |
Dena Gambrel
|
|
|
11-17-05 Signed off on occupancy.
|
FIRE-Final Inspection | 11/17/2005 | 11/18/2005 | 11/18/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety is acceptable for the shell permit.
|
BLD-Aging Inspection | 11/16/2005 | 11/16/2005 | 11/16/2005 | | PASS |
Jim Storey
|
|
|
wip
|
Code Occupancy Approval | | | 10/11/2005 | | FAIL |
|
|
|
Left Correction Notice for gate on trash enclosure, fence on south side of property to enclose grassed area, and bike rack.
|
PubWorks Occupancy Approval | 10/5/2005 | 10/5/2005 | 10/5/2005 | | DONE |
|
|
|
Drainage project complete 10/05/05, signed permanent occupancy. R.Rokovitz
|
BLD-Framing/Rough-in | 9/16/2005 | 9/16/2005 | 9/16/2005 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/16/2005 at 7:23:49 AM. Contact: ###-####. c/n posted not complet insp. out of time.
|
BLD-Framing/Rough-in | 9/15/2005 | 9/16/2005 | 9/16/2005 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/15/2005 at 11:26:32 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Sep 16 2005 7:21AM.
|
BLD-Footing | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | PART |
Jim Storey
|
|
|
re-bar//wes; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 7/13/2005 | 7/14/2005 | 7/14/2005 | A | PART |
Jim Storey
|
|
|
wes Note: rebar footing; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles si and weeb aproved ft on swe areas
|
BLD-Footing | 7/5/2005 | 7/6/2005 | 7/6/2005 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/5/2005 at 1:26:57 PM. Contact: ###-####. interior column pad footings. contractor does have special inspections.
|
BLD-Aging Inspection | 6/15/2005 | 6/15/2005 | 6/15/2005 | | NR |
Jim Storey
|
|
|
no call for insp. just recieved plan mod.
|
Override - Parcel Holds | | | 6/2/2005 | | |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 6/2/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/2/2005 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/2/2005 | | DONE |
|
|
|
changed status was a plan mod/customer has picked up
|
Override - Parcel Holds | | | 6/1/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 6/1/2005 | | DONE |
|
|
|
|
Telephone call | | | 5/16/2005 | | DONE |
|
|
|
tlk to secretary at Petra ###-#### that permit and fees are ready to be picked up
|
Plan assigned to (JCM) | 5/6/2005 | 5/6/2005 | 5/13/2005 | | PASS |
|
|
|
5/13/2005 10:00:26 JCM - activity updated through activity BLDA022 from case BLD04-00467.
|
Routing - PLANNING | 5/10/2005 | | 5/13/2005 | | PASS |
|
|
|
Approved. I called the applicant to get revised copies of the site plan and elevations for the DR file.
|
Routing - PLAN CHECK | 5/12/2005 | | 5/13/2005 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 5/13/2005 | | PASS |
|
|
|
Reviewed and approved plan modification to add (2) overhead doors and (3) man doors. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/6/2005 | | 5/10/2005 | | |
|
|
|
|
Plan Modification Accepted | | | 5/6/2005 | | |
|
|
|
Plan Modification excepted for the redesign of an addition of 2 grade level 12' x 14' overhead doors to the north elevation. Addition of 3 mandoors to the south elevation and the deletion of 1 mandoor on the east elevation. Revised sheets- SP-1,A-1,A-2,A-4,A-6,S-1,S-2,S-7,S-8,S-9,S-10 & S-11 Routed to John M.
|
BLD-Aging Inspection | 3/31/2005 | 3/31/2005 | 4/4/2005 | | FAIL |
Jim Storey
|
|
|
no call for insp.record has failled achd permit.
|
(F) Reprint permit | | | 1/3/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 12/30/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/30/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/30/2004 | | DONE |
|
|
|
Left message for Darrin that permit is ready & fees and that we need ACHD info///12/30/04 11:05am BAS
|
Issue PAID IN FULL permit | | | 12/30/2004 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 12/28/2004 | | 12/29/2004 | | PASS |
|
|
|
Lot 2, Block 1 of Tires Subdivision. Final Plat recorded on 12/28/04.
|
Routing - PLAN CHECK | 12/29/2004 | | 12/29/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2004 | | |
|
|
|
|
Plan assigned to (JCM) | 3/19/2004 | | 12/29/2004 | | PASS |
John Menard
|
|
|
12/29/2004 09:45:11 MYS - activity updated through activity BLDA022 from case BLD04-00467. Took to the permit desk on behalf of John Menard. (MSouthard)
|
Routing - PLAN CHECK | 5/24/2004 | | 12/28/2004 | | PEND |
|
|
|
Pending land division approval. Routed back to Dave Abo on 12/28/04.
|
Ready Permit EXTENDED | | | 12/7/2004 | | DONE |
|
|
|
per jenifer gilliland an extension have been granted until january 1st 2005. took letter to be scanned at records
|
Routing - PLANNING Land Div | 5/21/2004 | | 5/24/2004 | | FAIL |
|
|
|
Need to consolidate parcels by describing boundary with metes and bounds description on quit claim deed. Need new tax parcel number.
|
Routing - FIRE | 5/18/2004 | | 5/21/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 4/28/2004 | | 5/18/2004 | | |
|
|
|
|
Plan resubmittals received | | | 5/17/2004 | | DONE |
|
|
|
Received response letter, site data sheet, two sets of sheets SP-1, A-3 taken to John Menard.
|
Plan Reviewer's activity | | | 5/3/2004 | | PASS |
|
|
|
Reviewed and approved resubmitted plan sheets with attached comment list. JCM
|
Routing Off Site - STRUCTURAL | 4/19/2004 | | 5/3/2004 | | PASS |
|
|
|
Contacted PDQ for outside engineering. Received fax from consulting structural engineer approving resubmittals. JCM
|
Plan resubmittals received | | | 4/28/2004 | | DONE |
|
|
|
Received Letter of Transmittal. 2 sets, 6 sheets. SP-1,A-1,A-5 .. Routed to John Menard
|
Plan Review Completed(1st rev) | | | 4/27/2004 | | FAIL |
|
|
|
Failed Planning, Structural, Building, Land Div. & Fire
|
Routing - FIRE | 4/22/2004 | | 4/27/2004 | | FAIL |
|
|
|
FD vehicle access, fire hyd locations, HP storage issues. Review comments faxed to architect.
|
Routing - PLAN CHECK | 4/15/2004 | | 4/22/2004 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 4/22/2004 | | |
|
|
|
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Plan resubmittals received | | | 4/16/2004 | | DONE |
|
|
|
Received letter of transmittal, response letter, two copies of structural calcs. three sets of sheets S-2,S-3,S-6,S-7,S-8,S-9, taken to John
|
Routing - PLANNING | 4/14/2004 | | 4/15/2004 | | PASS |
|
|
|
Sarah
|
Routing - PLAN CHECK | 4/12/2004 | | 4/14/2004 | | |
|
|
|
|
Routing - PLUMBING | 4/8/2004 | | 4/12/2004 | | PASS |
|
|
|
per plans and 2000 upc
|
Plan resubmittals received | | | 4/8/2004 | | DONE |
|
|
|
Received 3 revised site landscape plans, Sarah took one for planning and put two with the plan sets.
|
Routing - PLANNING | 4/2/2004 | | 4/7/2004 | | FAIL |
|
|
|
Called Dawna with Larson Architects to request a revised landscape plan showing the hillside grasses in place of the rock mulch on the west side of the building. They will be getting me drawings early next week.
4/7/04 - No information has been sent over on this project so I will send it on for review by other departments. When I receive the revised plans I will let everyone know.
|
Routing - Erosion and Sediment | 4/1/2004 | | 4/2/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 3/19/2004 | | 4/1/2004 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 4/1/2004 | | |
|
|
|
Faxed the architect a copy of the review comment from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 3/19/2004 | | 3/31/2004 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. kmm Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING Land Div | 3/19/2004 | | 3/19/2004 | | FAIL |
|
|
|
Need to record deed that combines parcels into one parcel. Need new tax parcel #. Call Cornell Larsen on March 19, 2004.
|
Plans ACCEPTED BY PLAN TECH | | | 3/19/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/19/2004 | | DONE |
|
|
|
|
Application received | | | 3/16/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/16/2004 | | |
|
|
|
|
Fee Review-notes | 3/16/2004 | 3/16/2004 | | | |
|
|
|
|