Permit Information
Permit NumberBLD04-00469
StatusFinaled
Name ECO WATER
Site Address 10718 W EXECUTIVE DR
Project NameINDUSTRIAL RESOURCE CENTER, #3
Customer Number 
ePlanReviewNo
Description
(ECO WATER) To remodel an existing 8,000 sq.ft. warehouse/office tenant per approved plans. Exterior work includes new concrete landings/ramps at new front entry doors & overhead door on the south side, minor interior remodel in office area, and installation of 78 lineal ft. of 10 ft. high chain link fence to divide up the warehouse space on the interior. No racking exceeding 8 ft. in height or high pile combustible storage allowed under this permit. New doors to be installed between bearing collumns in 18 gage steel frame wall with support and installation per door manufacture's listing. PC04-129/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/21/20111/24/20111/24/2011APASS
DetailsMike Jordan
holly Phone #: ###-####. All issues resolved. Ok for perm occ.
Permanent Occupancy  1/24/2011 DONE
DetailsTisha Gallop
Meeting  1/24/2011 DONE
DetailsTisha Gallop
when tenant came in to get cert of occupancy said to send final value request to tenant.
FIRE-Final Inspection1/21/20111/21/20111/21/2011PPASS
DetailsTroy Cobbley
All items from the previous correction notice have been corrected. Holly and I discussed the allowed storage arrangement.
BLD-Aging Inspection11/26/201011/26/201011/30/2010PDONE
DetailsTroy Cobbley
Information has been forwarded to Jason Blais and Scott Arellano as per policy for aging permits.
BLD-Aging Inspection11/26/201011/26/201011/26/2010 PEND
DetailsTom Arcoraci
FIRE-Conference5/4/20105/13/20105/13/2010ADONE
DetailsTroy Cobbley
I stopped at the job site and spoke to Holly about the job status.
FIRE-Conference5/5/20105/6/20105/6/2010ADONE
DetailsTroy Cobbley
I went over items completed and remaining items with Holly, Clint, Tim and the warehouse manager. All items have been corrected except on exit sign/emergency light at the south warehouse exit did not function, missing Knox Box, and possibly a racking/high piled storage permit. If a racking/storage permit is to be a voided the owner needs to keep all storage under 12', racks no higher than 8' and empty plastic water bottles less than 5'. Water filled bottles can be stored up to 12'. The racks will have to be modified to permanantly discourage placement of horizontal members above 8'. Tim Frost was consulted.
FIRE-Conference5/4/20105/5/20105/5/2010ADONE
DetailsTroy Cobbley
I spoke to Clint about getting this project finaled. He needs a conference for tomorrow morning to discuss the issues.
BLD-Conference2/5/20082/5/20082/6/2008AFAIL
DetailsMike Jordan
Talked to secratary at echo water, left business card, manager to call me. No return phone call as of 5:00pm today.
BLD-Aging Inspection4/26/20074/26/20074/26/2007 NR
DetailsMike Jordan
BLD-Aging Inspection10/25/200610/25/200610/30/2006 NR
DetailsMike Jordan
Needs life/safety.
BLD-Aging Inspection8/24/20068/24/20068/24/2006 NR
DetailsMike Jordan
BLD-Aging Inspection6/20/20066/20/20066/20/2006 NR
DetailsTroy Cobbley
BLD-Final4/12/20064/13/20064/13/2006AFAIL
DetailsTroy Cobbley
Clint; Phone #: ###-#### Repair the exit signs/emergency lights in the warehouse area, the exit signs in the office need repaired or removed, Remove the thumbturn from the main exit and provide indicator and sticker, remoe the dead bolts from the warehouse exterior doors, provide racking permit for racking over 8' and the storage over 12' see review notes #1 and #19, provide fire extinguishers per fire review comment #7, provide code compliant fire sprinkler monitoring system per review comment #15, provide knox box per review comment #6. Owner needs to review comments #16 through #26 for high piled storage requirements.
BLD-Aging Inspection4/11/20064/11/20064/12/2006 NR
DetailsTroy Cobbley
I spoke to clint and he would find the drawings and call in the inspection for tommorrow
FIRE-Final Inspection6/30/20047/1/20046/30/2004ACANC
DetailsTroy Cobbley
CLINT; Phone #: ###-#### Internet Inspection Request from: Annette Moore Inspection cancelled from web by: Aimee Hughes
Issue PAID IN FULL permit  4/20/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/19/2004 PASS
To permit desk for issue.
Print Occupancy Form  4/19/2004 DONE
Permit Ready to Issue  4/19/2004  
Telephone call  4/19/2004 DONE
permit ready and fee due
Plan assigned to (DRS)3/19/2004 4/19/2004 PASS
DetailsDan Stuart
4/19/2004 11:55:04 DRS - activity updated through activity BLDA022 from case BLD04-00469.
Routing - FIRE4/13/2004 4/15/2004 PASS
Routing - PLAN CHECK4/12/2004 4/14/2004 PEND
No response required. Plan review comments & conditions attached to plans as part of the approved plans. Routing to fire code analyst for review.
Routing - PUBLIC WORKS4/6/2004 4/9/2004 PASS
Telephone call  4/9/2004 DONE
Returned call to John Walsh. Plans are still in PW since 4/6/04. Additional information is needed and Bev has been unable to make personal contact with tenant. She has left voice message but not called back. John said he would try to contact the tenant and have them call Bev.
Meeting  4/9/2004 DONE
Talked with Bev in public works. she is trying to get additional information from tenant concerning water usage but has been unable to do more than leave a voice message. She had talked with John Walsh, building owner, today to get tenant number.
Routing - PLUMBING4/5/2004 4/6/2004 PASS
verify premise and thermol expantion protection
Routing - Erosion and Sediment3/30/2004 4/2/2004 PASS
ESC waiver approved with conditions attached to plans.
Routing - PLANNING3/23/2004 3/30/2004 PASS
Approved per Building Permit documents.
Plan resubmittals received  3/30/2004 DONE
Received 2 sets of P1, E1, M1 and 1 copy of small document showing bottling water plan design and 1 copy of small document IECC Envelope Compliance Certificate. Inserted these into plans currently circulating.
Routing - PUBLIC WORKS3/22/2004 3/23/2004 FAIL
Needs to supply plumbing plans per PW. kmm
Telephone call  3/23/2004 DONE
Call from Terry Abruzzese, tenant (ECO Water) concerning need for building permit before plumbing permit can be issued. Terry said they needed new floor sinks, hand sink & additional water heater for steralizing bottles and to get approval from CDH. I told Terry that the plans did not indicate any plumbing work and this would need to be shown on the plans for PW review and plumbing review. I will call Steve Foster for additional plans.
Telephone call  3/23/2004 DONE
Steve Foster called me to say he was faxing me a copy of the new letter from John Walsh asking for the waiver for ESC permit for Jim Rogers and to check on plans. I told him that I had been told in a conversation with Terry Abruzzese, proposed tenant that additional plumbing was being done in the way of a hand sink, floor sinks and a water heater and that this information was not on the plans and needed to be included.
The electrical bid for $4,000.00 seemed high for only two new lights and I ask him to check on scope of work to be done, that Terry had suggested new fans were also to be installed. All new lighting, HVAC & Service Hot Water would need to show compliance with the energy code for the new items and all this should be put on plans by the architect of record. Steve said he would contact architect.
Plan Reviewer's activity  3/23/2004 DONE
Added copy of waiver request letter to the circulating plans after I let Jim Rogers read letter for requirements. Jim looked up file and indicated the proposal for ESC was out to bid and that the information on the RP is required before the ESC can be approved. I called Steve Foster and left voice message that the contractor would need to provide information on the registered professional for ESC permit or the plan would not be approved by Jim Rogers and project would be delayed.
Telephone call  3/23/2004 DONE
Talked with Jason Tomlinson, architectural designer (plans stamped by Douglas Gibson) to discuss need for stamped resubmittals showing the layout of equipment, new plumbing & any lighting / electrical to be done. Plans need to route to the CDH (Bob Mayer) for approval befire plans are resubmitted. Work cannot be done as design-build by each separate contracter but needs to part of one plan to get approvals, finals and Certificate of Occupancy.
Plan resubmittals requested  3/23/2004 FAIL
Talked on phone with Jason Tomlinson, designer concerning plan re-submittals showing all the work proposed to be done for this tenant space to include plumbing, electrical, HVAC as applicable and equipment layout. The plans need to go to CDH for approval before they are resubmitted to PDS Dept.
Plans ACCEPTED BY PLAN TECH  3/18/2004 DONE
ok per Dan Sturart, waiting on ESC waiver letter.
Application received  3/17/2004  
Recd Pcfee & Taken To Pln CK  3/17/2004  
First Notice 2/3/2011   
send to tenant
Fee Review-notes3/17/20043/17/2004   
Routing - PLAN CHECK4/15/2004