Third Notice BLD | 12/7/2005 | 12/7/2005 | 12/16/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice | | 5/20/2005 | 12/7/2005 | | DONE |
|
|
|
|
First Notice | | 9/1/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/1/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10277 issued 9-1-04 to Vision Quest Medical Center.
|
BLD-Final | 8/30/2004 | 8/31/2004 | 8/31/2004 | A | PASS |
Tom Arcoraci
|
|
|
after 11:00 please//pat; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok pending plumbing final 8/31/2004 10:57:37 AM
|
Permanent Occupancy | | 8/31/2004 | 8/31/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/23/2004 | 8/24/2004 | 8/24/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 8/24/2004 9:46:20 AM
|
BLD-Final | 8/18/2004 | 8/20/2004 | 8/20/2004 | P | CANC |
Tom Arcoraci
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Annette Moore
|
FIRE-Final Inspection | 8/9/2004 | 8/10/2004 | 8/10/2004 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the exit discharge lighting has been installed and the door hardware has been installed on the west half of the building. The east half of the building is ok to occupy as all life safety items other than discharge lighting is OK. 8/10/2004 11:01:29 AM
|
BLD-Final | 8/9/2004 | 8/10/2004 | 8/10/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/9/2004 at 11:47:26 AM. Contact: ###-####. ok for temp on east side 8/10/2004 3:19:17 PM
|
BLD-Final | 8/6/2004 | 8/9/2004 | 8/9/2004 | A | CANC |
Tom Arcoraci
|
|
|
PAT; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIRE-Final Inspection | 8/6/2004 | 8/6/2004 | 8/6/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide approved door hardware on doors marked on drawing sheet A1.1. Provide exit discharge illumination per building review notes #22. Install ceiling tile at sprinkler pendants. Test duct detectors. Relocate ducting at duct detector #1. Provide 30cd strobes in rooms as marked on plans and measure EOL voltage. Provide map at FACP
|
BLD-Other | 8/4/2004 | 8/6/2004 | 8/6/2004 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 8/4/2004 at 2:29:45 PM. Contact: ###-####. susp. ceiling @ TI ok. East side of bldg. 8/6/2004 9:07:16 AM
|
BLD-Final | 8/5/2004 | 8/6/2004 | 8/6/2004 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/5/2004 at 10:38:26 AM. Contact: ###-####.
|
BLD-Energy code compliance | 7/30/2004 | 8/3/2004 | 8/3/2004 | A | PASS |
Tom Arcoraci
|
|
|
Pat Trumble -- fire wall.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 6/17/2004 | 6/18/2004 | 6/18/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/17/2004 at 1:09:45 PM. Contact: ###-####. 6/18/2004 8:57:58 AM ok to cover hard ceiling in opp. rms 6/18/2004 8:58:56 AM
|
BLD-Framing/Rough-in | 6/7/2004 | 6/8/2004 | 6/8/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/7/2004 at 2:55:27 PM. Contact: ###-####. ok for cover 6/8/2004 2:17:14 PM
|
BLD-Framing/Rough-in | 6/2/2004 | 6/4/2004 | 6/4/2004 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/2/2004 at 9:44:52 AM. Contact: ###-####.
|
BLD-Conference | 5/18/2004 | 5/20/2004 | 5/20/2004 | A | PASS |
Tom Arcoraci
|
|
|
pat ; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to extend a wall to roof deck 5/20/2004 9:46:43 AM 5/20/2004 9:47:08 AM
|
Permit Ready to Issue | | | 4/12/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/12/2004 | | DONE |
|
|
|
|
Telephone call | | | 4/12/2004 | | DONE |
|
|
|
permit ready and fee due
|
Issue PAID IN FULL permit | | | 4/12/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/9/2004 | | 4/9/2004 | | PASS |
|
|
|
Drawings approved, with clarifications, after the review of the structural calculations.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2004 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 3/25/2004 | | 4/9/2004 | | PASS |
Carl Westfall
|
|
|
4/9/2004 14:55:29 CJW - activity updated through activity BLDA022 from case BLD04-00495.
|
Routing - PLANNING | 4/6/2004 | | 4/8/2004 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 4/6/2004 | | DONE |
|
|
|
|
Routing - FIRE | 4/5/2004 | | 4/6/2004 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 3/30/2004 | | 4/5/2004 | | |
|
|
|
Failed first IBC plan review. The IBC plan review was started April 2, 2004 and was finished April 5, 2004. A response from the architect was required. See the plan review report.
|
Routing - PLUMBING | 3/26/2004 | | 3/30/2004 | | PASS |
|
|
|
verify locations of existing medical air and vacuum intake and exhaust, relocate if required.
|
Routing - PUBLIC WORKS | 3/25/2004 | | 3/26/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/22/2004 | | DONE |
|
|
|
|
Application received | | | 3/19/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/19/2004 | | |
|
|
|
|
Fee Review-notes | 3/19/2004 | 3/19/2004 | | | |
|
|
|
|