BLD-Final | 10/7/2004 | 10/8/2004 | 10/8/2004 | A | FAIL |
Troy James
|
|
|
ralph - ###-#### Note: please 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
exterior door at garage not allowed to swing over steps, need the handrail at interior stairs to turn into wall 10/8/2004 11:41:12 AM
|
BLD-Final | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Dave Hannah
|
|
|
ralph or ###-#### or randy -re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
DOC - Permit Finaled | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 10/8/2004 2:41:11 PM
|
BLD-Grading Inspection | 10/6/2004 | 10/6/2004 | 10/6/2004 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 8/6/2004 | 8/10/2004 | 8/10/2004 | A | PASS |
Jim Sly
|
|
|
ralph; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles HDs installed on int shear walls. 8/10/2004 10:31:40 AM
|
BLD-Framing/Rough-in | 8/5/2004 | 8/6/2004 | 8/6/2004 | A | PASS |
Tony Young
|
|
|
ralph; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ext. ok also,,, ok to insulate 8/6/2004 2:21:25 PM
|
BLD-Footing | 6/14/2004 | 6/15/2004 | 6/15/2004 | A | PART |
Tony Young
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
small retaining wall ftg for landscape 6/15/2004 9:36:54 AM
|
BLD-Foundation | 6/8/2004 | 6/8/2004 | 6/8/2004 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/8/2004 at 7:38:37 AM. Contact: ###-####.
|
BLD-Footing | 6/3/2004 | 6/4/2004 | 6/4/2004 | A | CANC |
Troy James
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
need soils report verified by terry records
6/4/2004 11:16:42 AM
|
BLD-Footing | 6/4/2004 | 6/4/2004 | 6/4/2004 | P | PART |
Tony Young
|
|
|
ryan ###-####
|
BLD-Grading Inspection | 6/4/2004 | 6/4/2004 | 6/4/2004 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade approved by geotechnical engineer provided 3 inches of loose material is removed.
|
Issue PAID IN FULL permit | | | 6/1/2004 | | DONE |
|
|
|
|
Routing - FIRE | 5/28/2004 | | 5/28/2004 | | DONE |
|
|
|
Per revised information from Dave Miller this house will NOT require fire sprinklers. Contractor advised by phone of change and to get new inspection card.
|
Plan Reviewer's activity | | | 5/28/2004 | | DONE |
|
|
|
additional information received about the sprinkler requirements required for Afton Subdivision. Parcel 2A (lot 7) and Parcel 2B (lot 8) are the only lots that will be sprinklered. Will modify verbage for Bld04-00543 (Shiloh Devel.) to indicate no sprinkler requirements.
|
Inspection Record Card- Bld | | | 5/28/2004 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 5/24/2004 | 5/24/2004 | 5/24/2004 | | DONE |
Dan Overy
|
|
|
|
Case Summary (BLD) | | | 5/24/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 5/24/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/24/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/24/2004 | | DONE |
|
|
|
permit ready and fee due
|
Print Occupancy Form | | | 5/24/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/24/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2004 | | DONE |
|
|
|
|
Pending Assignment by DJO | 3/24/2004 | | 5/24/2004 | | DONE |
Dan Overy
|
|
|
5/24/2004 15:03:25 DJO - activity updated through activity BLDA169 from case BLD04-00543.
|
Routing - PUBLIC WORKS GRADING | 3/24/2004 | | 5/21/2004 | | PASS |
Rita DeYoung
|
|
|
GRADING AND DRAINAG IS APPROVED AS CATEGORY 3 WITH CONDITIONS OF APPROVAL IN LETTER FROM PUBLIC WORKS ATTACHED TO THE PLANS. 5/24/04
Grading and drainage is tentavely approved pending minor revisions that do not affect the structure.
|
Plan resubmittals received | | | 5/21/2004 | | DONE |
|
|
|
Received 2 booklets of EROSION & SEDIMENT CONTROL PLANS. Taken to Jim Rogers...
|
Routing - Erosion and Sediment | 5/21/2004 | | 5/21/2004 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - Erosion and Sediment | 5/18/2004 | | 5/19/2004 | | FAIL |
|
|
|
No ESC plan or waiver request attached.
|
Routing - FIRE | 5/19/2004 | | 5/19/2004 | | DONE |
|
|
|
Fire sprinkler are required by FD in all residential dwellings, due to length of access drive. (Afton St. Development)
|
Routing - PLANNING | 4/30/2004 | | 5/17/2004 | | PASS |
|
|
|
Approved as noted on site plan. Site plan notes indicate that. 1) Patio shall not exceed 1-foot in height above original elevation not new grade. 2) Entry wall and steps shall not encroach into side yard setback. 3) Chimney shall be centered between exterior walls. R-1C Setbacks for residential dwellings allowed per Wayne Gibbs. M. Pecchenino CAA03-2
Revised drawings submitted on 5/14/2004.
|
Routing - PUBLIC WORKS | 4/30/2004 | | 4/30/2004 | | PASS |
|
|
|
|
Application received | | | 3/24/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 5/20/2004 | | | | |
|
|
|
|