Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00556
StatusFinaled
Name MICHAEL S MAY INSURANCE
Site Address 611 S ORCHARD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(MICHAEL MAY INSURANCE AGENCY) To convert an existing one story 880 sq. ft. single family dwelling into a commercial office building which includes all site work per approved plans and CVA03-00024 and DRH03-00150. Work to include some miscellaneous interior demolition work, new exterior site work, new reinforced concrete exterior accessible ramp (resubmittal change 3/30/05), new wood exterior stairway, new front entrance/exit door, wall infill in former opening at north exterior wall, metal security screen on front window, upgrading restroom to current accessibility standards, providing additional support to existing floor joists in underfloor space under General Office #101 and Office #105, some new interior walls, interior finish, plumbing work, and some electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is NOT fire sprinklered. (PC#0154-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD1/9/20081/9/20082/7/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 12/18/20071/9/2008 DONE
Print Occupancy Form  12/18/2007 DONE
Permanent Occupancy  12/18/2007 DONE
BLD-Final12/17/200712/17/200712/17/2007PPASS
DetailsTom Arcoraci
Ok to re-open per George slane for final only
CHANGE STATUS TO (ISS)  12/17/2007 DONE
Ok to re-open for final inspection per george slane///12/17/07 BAS
BLD-Aging Inspection7/7/20067/7/20067/7/2006 CANC
DetailsTom Arcoraci
DOC - Permit Expired7/7/20067/7/20067/7/2006PPASS
DetailsTom Arcoraci
BLD-Aging Inspection3/13/20063/13/20063/13/2006 NR
DetailsTom Arcoraci
BLD-Aging Inspection1/9/20061/9/20061/9/2006 NR
DetailsTom Arcoraci
Code Occupancy Approval11/8/200511/8/200511/8/2005PDONE
DetailsDena Gambrel
Passed on 11-07-05
BLD-Final10/25/200510/27/200510/27/2005AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/25/2005 at 4:41:15 PM. Contact: ###-####. needs water closet 18 inch from wall and all sigs on card
Case Summary (BLD)  10/20/2005  
Case Summary (BLD)  10/13/2005  
Case Summary (BLD)  10/13/2005  
Case Summary (BLD)  10/13/2005  
BLD-Aging Inspection10/11/200510/11/200510/11/2005 NR
DetailsTom Arcoraci
FIRE-Final Inspection8/11/20058/11/20058/11/2005PPASS
DetailsTroy Cobbley
Life safety finaled
BLD-Aging Inspection8/3/20058/3/20058/3/2005 FAIL
DetailsTroy Cobbley
Items have not been corrected yet. Owner was on phone so I left name and phone number with the office manager and stated that the temporary occupancy will be expire.
FIRE-Final Inspection5/31/20056/3/20056/3/2005AFAIL
DetailsTroy Cobbley
Door hardware on the main exit is not approved. If keyed lock is to remain an indicator must be provided with a sticker above the door. See fire review comments note #4
BLD-Concrete5/31/20056/1/20056/1/2005APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/31/2005 at 3:12:38 PM. Contact: ###-####.C/N- HANDRAILS NOT YET INSTALLED AT RAMP
Plan resubmittals received  3/30/2005 PASS
Plan resubmittal sheets SL-1.1 and A-1.3 received for changes to the exterior accessible ramp construction. Ramp construction will now be reinforced concrete with steel railings. Resubmittal sheets only apply to ramp construction and are supplemental to the original approved plans. One copy sent to the job site and another provided to the Records Department.
BLD-Aging Inspection9/28/20049/28/20049/28/2004 NR
DetailsTom Arcoraci
Issue PAID IN FULL permit  6/28/2004 DONE
Telephone call  6/2/2004 DONE
customer was here & will come back to pickup
Permit Ready to Issue  6/2/2004 DONE
Plan assigned to (JCB)3/30/2004 6/1/2004 PASS
DetailsJason Blais
6/1/2004 13:07:39 JCB - activity updated through activity BLDA022 from case BLD04-00556.
Routing - Erosion and Sediment5/28/2004 6/1/2004 PASS
PP ESC approved with conditions attached to plans.
Routing - PLAN CHECK6/1/2004 6/1/2004 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  6/1/2004 PASS
Inspection Record Card- Bld  6/1/2004  
Print Occupancy Form  6/1/2004 DONE
Routing - FIRE5/26/2004 5/28/2004 PASS
resubmittal acceptable
Routing - Erosion and Sediment5/25/2004 5/26/2004 FAIL
ESC does not include RP check list. Notified Plan Designer.
Routing - PLAN CHECK4/14/2004 5/25/2004 PEND
Resubmittal plans to route to Erosion Sediment Control and then to the Fire Dept. for review. When approved by these divisions a permit can be issued.
Plan resubmittals received  5/24/2004 DONE
Received letter of transmittal with revised certificate of value,two sets of sheets A-1.1, A-1.3, fax cover sheet to Jim Rogers with four pages of BMP's, United water flow chart for Sam Rogers all taken to Jason B.
Routing - FIRE4/12/2004 4/13/2004 FAIL
hydrant flow info required; review faxed to architect.
Plan Review Completed(1st rev)  4/13/2004 FAIL
failed ESC, plan check and Fire
Plan resubmittals requested  4/12/2004  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK4/5/2004 4/9/2004 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
Routing - PLANNING4/5/2004 4/5/2004 PASS
Approved per CVA03-00024, Plans submitted ok, pending DR review and approval of plans. Mark Pecchenino

Sarah Schafer DRH03-00150

Approved per DRH03-150 and as noted on sheet SL1.1. (Relocation of a tree as discussed with applicant.)
Routing - Erosion and Sediment4/2/2004 4/2/2004 FAIL
Plan does not meet requirements of BCC 8-17 or standards of Plan Designer Manual Appendix A&C.
Routing - PUBLIC WORKS3/30/2004 4/2/2004 PASS
Plans ACCEPTED BY PLAN TECH  3/26/2004 DONE
Application received  3/25/2004  
Recd Pcfee & Taken To Pln CK  3/25/2004  
Fee Review-notes3/25/20043/25/2004