Case Summary (BLD) | | | 3/21/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/31/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/20/2007 | | DONE |
|
|
|
|
Letter of compliance | | | 12/8/2004 | | DONE |
|
|
|
Letter of Compliance issued 12-8-04.
|
Case Summary (BLD) | | | 11/24/2004 | | DONE |
|
|
|
|
Temporary occupancy | | | 11/16/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5170 issued 11-16-04 to the Bethel Warehouse.
|
BLD-Final | 11/5/2004 | 11/5/2004 | 11/5/2004 | P | PART |
Lane Manuel
|
|
|
please call at least a half hour prior to inspection so he can meet ya there///gene; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Temp. C of O OK. Permanent C of O OK pending Public Works Approval. 11/5/2004 1:08:51 PM
|
FIRE-Final Inspection | 11/3/2004 | 11/4/2004 | 11/4/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety, fire alarm and fire sprinkler finaled 11/4/2004 4:40:47 PM
|
Code Occupancy Approval | | | 11/4/2004 | | DONE |
|
|
|
Meets compliance with the DRH04-00008.
|
FIRE-Final Inspection | 10/29/2004 | 11/1/2004 | 11/1/2004 | A | FAIL |
Troy Cobbley
|
|
|
Need to final fire alarm and fire sprinklers. Verify life safety compiance in all tenant spaces. Remove bag from sprinkler upright in west tenant space. 11/1/2004 12:02:10 PM
|
BLD-Final | 10/29/2004 | 11/1/2004 | 11/1/2004 | P | DONE |
Lane Manuel
|
|
|
Gene- please call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner 11-01-04 Gene called to cancel insp. JR
|
Case Summary (BLD) | | | 10/28/2004 | | |
|
|
|
|
(F) Reprint permit | | | 10/26/2004 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/1/2004 | 10/4/2004 | 10/4/2004 | A | PART |
Jim Storey
|
|
|
jean Note: inspect ceiling grid to cover - please contact 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles perimtor wires to far out of plum. ok to drop tile. 10/4/2004 9:41:19 AM
|
BLD-Framing/Rough-in | 8/30/2004 | 8/30/2004 | 8/30/2004 | P | PASS |
Lane Manuel
|
|
|
please call 30 mins prior to inspection///gene; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 8/26/2004 | 8/27/2004 | 8/27/2004 | A | FAIL |
Jim Sly
|
|
|
jean; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/N.... Provide ul assembly for 1hr walls. OK to insulate only. 8/27/2004 10:46:45 AM
|
BLD-Framing/Rough-in | 8/25/2004 | 8/25/2004 | 8/25/2004 | P | FAIL |
Troy James
|
|
|
gene; Phone #: ###-#### Internet Inspection Request from: Annette Moore
No one on site. Trailer locked, no access to plans. 8/25/2004 4:46:39 PM
|
BLD-Other | 7/29/2004 | 7/29/2004 | 7/29/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/29/2004 at 7:07:34 AM. Contact: ###-####. mti on stite 7/29/2004 3:40:53 PM
|
BLD-Concrete | 6/17/2004 | 6/17/2004 | 6/17/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/17/2004 at 8:32:25 AM. Contact: ###-####. mti on site 6/17/2004 11:56:44 AM
|
(F) Reprint permit | | | 6/1/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/28/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/28/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/28/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/28/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/28/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 5/28/2004 | | |
|
|
|
|
Plan assigned to (MLO) | 3/26/2004 | | 5/28/2004 | | PASS |
Mike Otto
|
|
|
5/28/2004 08:53:11 MLO - activity updated through activity BLDA022 from case BLD04-00558.
|
Routing Off Site - STRUCTURAL | 3/29/2004 | | 5/27/2004 | | PASS |
|
|
|
Contacted PDQ to take plans to outside eng. Waiting for soils report. kmm
3/29/04 Received soils report. corrections sent to architect 4/20 MLO
|
Routing - PUBLIC WORKS | 5/21/2004 | | 5/27/2004 | | PASS |
|
|
|
|
Routing - FIRE | 5/18/2004 | | 5/20/2004 | | PASS |
|
|
|
resubmittal material acceptable
|
Routing - PLAN CHECK | 5/18/2004 | | 5/18/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/17/2004 | | DONE |
|
|
|
Received a response letter to Sam Rogers and copy of site plan taken to Sam.
|
Plan resubmittals received | | | 5/12/2004 | | DONE |
|
|
|
Received Letters of Transmittal , 2 Structural Calculations 4 Sets of plans 1 Set ( 4) 12 Sheets A-1,A-4,A-6,A-7,A- . 2nd Set (1) 3 Sheets E-1 3rd Set (1) 3 Sheets M-0 4th Set (3)12 Sheets S-1,S-2,S-3,S-5 ... Taken to Mike Otto and then will need to go to Sam Rogers...
|
Telephone call | | | 5/11/2004 | | DONE |
|
|
|
I called Cornell; requested he meet again in person with Dave Miller to explain the FD vehicle access deficiency for which he wants special approval. It appears the situation was not correctly illustrated by his previous fax.
|
Telephone call | | | 5/7/2004 | | DONE |
|
|
|
I phoned C. Larson, arch., regarding written proposal he made to D. Miller addressing FD access and high piled storage design requirements; not available, left voice message explaining the outstanding issues and requesting he call back to discuss further.
|
Plan resubmittals received | | | 4/27/2004 | | DONE |
|
|
|
water test info and request for alternate approval of FD vehicle access received. Alternate approval forwarded to Dave Miller.
|
Routing - PLAN CHECK | 4/23/2004 | | 4/23/2004 | | NR |
|
|
|
|
Routing - FIRE | 4/20/2004 | | 4/23/2004 | | FAIL |
|
|
|
No hydrant/sprinkler flow info, FD access, high piled storage issues. Review comments faxed to architect.
|
Plan Review Completed(1st rev) | | | 4/23/2004 | | FAIL |
|
|
|
Failed in Public Works, Structural, Plan Check and Fire.
|
Plan resubmittals requested | | | 4/20/2004 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 4/15/2004 | | 4/20/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 4/14/2004 | | 4/15/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 4/13/2004 | | 4/14/2004 | | PASS |
|
|
|
DRH04-00008 Sarah Schafer
Approved per DRH04-8.
|
Routing - Erosion and Sediment | 4/12/2004 | | 4/12/2004 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - PUBLIC WORKS | 3/26/2004 | | 4/9/2004 | | FAIL |
|
|
|
Requires street light plan per Bill Colson. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 3/29/2004 | | DONE |
|
|
|
Received soils report. Put with outside engineering copy.
|
Routing - PLANNING Land Div | 3/26/2004 | | 3/26/2004 | | PASS |
|
|
|
Lot 1, Block 1 of Substation Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 3/26/2004 | | PEND |
|
|
|
Requries 1. Soils report
2. envelope and lighting compliance cert. not signed.
Contacted Cornel Larson of these needs. kmm
|
Plan routing begun/NEW & ADDTN | | | 3/26/2004 | | DONE |
|
|
|
|
Application received | | | 3/25/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/25/2004 | | |
|
|
|
|
Fee Review-notes | 3/25/2004 | 3/25/2004 | | | |
|
|
|
|