Permit Information
Permit NumberBLD04-00558
StatusFinaled
Name BETHEL LLC
Site Address 9530 W BETHEL CT
Project NameBethel Warehouse
Customer Number 
ePlanReviewNo
Description
Bethel Warehouse * To construct a 13,500 s.f. one story Type III-B fully fire sprinklered shell only building. Plans are showing 4 separate tenant spaces with one restroom and two office with future janitor rooms in each space. No occupancy is authorized by this permit. Separate plans and permits are required for each tenant space. Smoke vents in each space are being roughed in only under this permit. When smoke vents are to be installed separate plans, engineering and permits will be required. DRH04-00008
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/21/2008 DONE
Case Summary (BLD)  7/31/2007 DONE
Case Summary (BLD)  2/20/2007 DONE
Letter of compliance  12/8/2004 DONE
Letter of Compliance issued 12-8-04.
Case Summary (BLD)  11/24/2004 DONE
Temporary occupancy  11/16/2004 DONE
Temp. Occ. Cert. # 5170 issued 11-16-04 to the Bethel Warehouse.
BLD-Final11/5/200411/5/200411/5/2004PPART
DetailsLane Manuel
please call at least a half hour prior to inspection so he can meet ya there///gene; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Temp. C of O OK. Permanent C of O OK pending Public Works Approval. 11/5/2004 1:08:51 PM
FIRE-Final Inspection11/3/200411/4/200411/4/2004PPASS
DetailsTroy Cobbley
Fire life safety, fire alarm and fire sprinkler finaled 11/4/2004 4:40:47 PM
Code Occupancy Approval  11/4/2004 DONE
Meets compliance with the DRH04-00008.
FIRE-Final Inspection10/29/200411/1/200411/1/2004AFAIL
DetailsTroy Cobbley
Need to final fire alarm and fire sprinklers. Verify life safety compiance in all tenant spaces. Remove bag from sprinkler upright in west tenant space. 11/1/2004 12:02:10 PM
BLD-Final10/29/200411/1/200411/1/2004PDONE
DetailsLane Manuel
Gene- please call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner 11-01-04 Gene called to cancel insp. JR
Case Summary (BLD)  10/28/2004  
(F) Reprint permit  10/26/2004 DONE
BLD-Framing/Rough-in10/1/200410/4/200410/4/2004APART
DetailsJim Storey
jean Note: inspect ceiling grid to cover - please contact 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles perimtor wires to far out of plum. ok to drop tile. 10/4/2004 9:41:19 AM
BLD-Framing/Rough-in8/30/20048/30/20048/30/2004PPASS
DetailsLane Manuel
please call 30 mins prior to inspection///gene; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/26/20048/27/20048/27/2004AFAIL
DetailsJim Sly
jean; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/N.... Provide ul assembly for 1hr walls. OK to insulate only. 8/27/2004 10:46:45 AM
BLD-Framing/Rough-in8/25/20048/25/20048/25/2004PFAIL
DetailsTroy James
gene; Phone #: ###-#### Internet Inspection Request from: Annette Moore
No one on site. Trailer locked, no access to plans. 8/25/2004 4:46:39 PM
BLD-Other7/29/20047/29/20047/29/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/29/2004 at 7:07:34 AM. Contact: ###-####. mti on stite 7/29/2004 3:40:53 PM
BLD-Concrete6/17/20046/17/20046/17/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/17/2004 at 8:32:25 AM. Contact: ###-####. mti on site 6/17/2004 11:56:44 AM
(F) Reprint permit  6/1/2004  
PLANS/APPL TAKEN TO FRONT DESK  5/28/2004 DONE
Inspection Record Card- Bld  5/28/2004 DONE
Permit Ready to Issue  5/28/2004 DONE
Print Occupancy Form  5/28/2004 DONE
Telephone call  5/28/2004 DONE
left mess that permit is ready
Issue PAID IN FULL permit  5/28/2004  
Plan assigned to (MLO)3/26/2004 5/28/2004 PASS
DetailsMike Otto
5/28/2004 08:53:11 MLO - activity updated through activity BLDA022 from case BLD04-00558.
Routing Off Site - STRUCTURAL3/29/2004 5/27/2004 PASS
Contacted PDQ to take plans to outside eng. Waiting for soils report. kmm
3/29/04 Received soils report. corrections sent to architect 4/20 MLO
Routing - PUBLIC WORKS5/21/2004 5/27/2004 PASS
Routing - FIRE5/18/2004 5/20/2004 PASS
resubmittal material acceptable
Routing - PLAN CHECK5/18/2004 5/18/2004 PASS
Plan resubmittals received  5/17/2004 DONE
Received a response letter to Sam Rogers and copy of site plan taken to Sam.
Plan resubmittals received  5/12/2004 DONE
Received Letters of Transmittal , 2 Structural Calculations 4 Sets of plans 1 Set ( 4) 12 Sheets A-1,A-4,A-6,A-7,A- . 2nd Set (1) 3 Sheets E-1 3rd Set (1) 3 Sheets M-0 4th Set (3)12 Sheets S-1,S-2,S-3,S-5 ... Taken to Mike Otto and then will need to go to Sam Rogers...
Telephone call  5/11/2004 DONE
I called Cornell; requested he meet again in person with Dave Miller to explain the FD vehicle access deficiency for which he wants special approval. It appears the situation was not correctly illustrated by his previous fax.
Telephone call  5/7/2004 DONE
I phoned C. Larson, arch., regarding written proposal he made to D. Miller addressing FD access and high piled storage design requirements; not available, left voice message explaining the outstanding issues and requesting he call back to discuss further.
Plan resubmittals received  4/27/2004 DONE
water test info and request for alternate approval of FD vehicle access received. Alternate approval forwarded to Dave Miller.
Routing - PLAN CHECK4/23/2004 4/23/2004 NR
Routing - FIRE4/20/2004 4/23/2004 FAIL
No hydrant/sprinkler flow info, FD access, high piled storage issues. Review comments faxed to architect.
Plan Review Completed(1st rev)  4/23/2004 FAIL
Failed in Public Works, Structural, Plan Check and Fire.
Plan resubmittals requested  4/20/2004 DONE
IBC corrections
Routing - PLAN CHECK4/15/2004 4/20/2004 FAIL
corrections sent to architect
Routing - PLUMBING4/14/2004 4/15/2004 PASS
Routing - PLANNING4/13/2004 4/14/2004 PASS
DRH04-00008 Sarah Schafer

Approved per DRH04-8.
Routing - Erosion and Sediment4/12/2004 4/12/2004 PASS
ESC approved with attached conditions.
Routing - PUBLIC WORKS3/26/2004 4/9/2004 FAIL
Requires street light plan per Bill Colson. kmm
Plans ACCEPTED BY PLAN TECH  3/29/2004 DONE
Received soils report. Put with outside engineering copy.
Routing - PLANNING Land Div3/26/2004 3/26/2004 PASS
Lot 1, Block 1 of Substation Subdivision.
Plans ACCEPTED BY PLAN TECH  3/26/2004 PEND
Requries 1. Soils report
2. envelope and lighting compliance cert. not signed.
Contacted Cornel Larson of these needs. kmm
Plan routing begun/NEW & ADDTN  3/26/2004 DONE
Application received  3/25/2004  
Recd Pcfee & Taken To Pln CK  3/25/2004  
Fee Review-notes3/25/20043/25/2004