BLD-Final | 7/22/2004 | 7/23/2004 | 7/23/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/22/2004 at 3:55:13 PM. Contact: ###-####. c/n posted on kitchen counter 7/23/2004 10:19:12 AM
|
BLD-Final | 7/23/2004 | 7/23/2004 | 7/23/2004 | P | PASS |
Troy James
|
|
|
|
DOC - Permit Finaled | 7/23/2004 | 7/23/2004 | 7/23/2004 | P | PASS |
Troy James
|
|
|
Finaled by inspector at 7/23/2004 2:42:49 PM
|
BLD-Energy code compliance | 6/17/2004 | 6/21/2004 | 6/21/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/17/2004 at 11:00:19 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/17/2004 | 6/17/2004 | 6/17/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/17/2004 at 10:59:12 AM. Contact: ###-####. Still need blocking at floor level second floor and tempered glass at exterior door. Ok to insulate 6/17/2004 2:11:23 PM
|
BLD-Framing/Rough-in | 6/15/2004 | 6/16/2004 | 6/16/2004 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/15/2004 at 1:29:42 PM. Contact: ###-####. Roll over, out of time. 6/16/2004 9:53:04 AM 6/16/2004 9:54:08 AM
|
BLD-Framing/Rough-in | 6/16/2004 | 6/16/2004 | 6/16/2004 | P | FAIL |
Troy James
|
|
|
c/n posted 6/16/2004 2:48:44 PM
|
BLD-Footing | 4/19/2004 | 4/19/2004 | 4/19/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/19/2004 at 6:52:18 AM. Contact: ###-####. setbacks ok 4/19/2004 1:45:49 PM
|
Permit Ready to Issue | | | 4/16/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/16/2004 | | DONE |
|
|
|
|
Telephone call | | | 4/16/2004 | | DONE |
|
|
|
Spoke with Mike and told him that permit is ready & fees///7:53am 4/16/04 BAM
|
Issue PAID IN FULL permit | | | 4/16/2004 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 4/12/2004 | 4/12/2004 | 4/15/2004 | | PASS |
Dan Overy
|
|
|
4/15/2004 15:06:56 DJO - activity updated through activity BLDA022 from case BLD04-00559.
|
Plan Reviewer's activity | | | 4/15/2004 | | DONE |
|
|
|
received engineered revision for rear wall and removal of holdowns. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/15/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 4/15/2004 | | DONE |
|
|
|
|
Pending Assignment by DJO | 3/26/2004 | | 4/12/2004 | | DONE |
Dan Overy
|
|
|
4/12/2004 15:04:19 DJO - activity updated through activity BLDA169 from case BLD04-00559.
|
Plans ACCEPTED BY PLAN CHECK | | | 4/12/2004 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/12/2004 | | |
|
|
|
foundation does not indicate all holdowns. have red-lined where alternate brace panels have been designed per city green book. will issue when engineering is received for panel areas that indicate engineered design.
|
Routing - PLANNING | 3/26/2004 | | 3/31/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/31/2004 | | 3/31/2004 | | PASS |
|
|
|
|
Application received | | | 3/26/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 3/31/2004 | | | | |
|
|
|
|