(BFI - ADMINISTRATION OFFICE BUILDING) To replace two existing exterior doors with new doors and to demolish an existing office and storage room to create a new training room within an existing 4,133 sq. ft. office building per approved plans on file. Fire life/safety inspections to also be conducted to establish occupancy. Work to include some miscellaneous interior demolition work, two new exterior doors, interior finish, upgrading some door hardware to accessibility standards, and some minor electrical work. This building was originally constructed in Ada County and later annexed into Boise City. Applicant has provided plans from a 1997 remodel done in the County that shows work both in this administration building and in the truck maintenance facility building nearby on an adjacent lot. (11199 W. Executive Dr.) These plans will be scanned with this permit into the Records Department for future reference. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is NOT fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD12/27/200612/27/200612/27/2006 DONE
First Notice has not been responded to.
First Notice11/20/200611/20/200612/27/2006 DONE
DetailsMike Jordan
BLD-Aging Inspection11/17/200611/17/200611/20/2006 PASS
DetailsMike Jordan
DOC - Permit Finaled11/20/200611/20/200611/20/2006PPASS
DetailsMike Jordan
BLD-Aging Inspection9/12/20069/12/20069/13/2006 CANC
DetailsMike Jordan
BLD-Aging Inspection7/13/20067/13/20067/13/2006 NR
DetailsMike Jordan
BLD-Aging Inspection4/13/20064/13/20064/13/2006 DONE
DetailsMike Jordan
Called mike dolan and left message. phone call was not returned today.
BLD-Conference5/19/20056/17/20056/17/2005PPEND
DetailsMike Jordan
Work is in progress, Exit signs on order, wiring required in ceiling for signs.
BLD-Final6/10/20056/10/20056/10/2005PNR
DetailsJim Sly
mike dolan-- ###-#### -- pending fire fn
Need fire
FIRE-Final Inspection6/10/20056/10/20056/10/2005PFAIL
DetailsTroy Cobbley
Contractor needs to verify all comments addressed on drawings and in review notes.
Inspection Record Card- Bld  6/10/2005 DONE
Print Occupancy Form  6/10/2005  
BLD-Aging Inspection5/18/20055/18/20055/18/2005 PART
DetailsJim Sly
C/N Obtain Occ request card and all req signatures within 30 days of this notice.... Gave to Mike Dolan BFI ###-#### x227 5/19/2005 12:41:52 PM
Issue PAID IN FULL permit  4/1/2004 DONE
Plan assigned to (JCB)3/29/2004 3/31/2004 PASS
DetailsJason Blais
3/31/2004 11:40:57 JCB - activity updated through activity BLDA022 from case BLD04-00590.
Routing - PLAN CHECK3/29/2004 3/31/2004 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  3/31/2004 PASS
Print Occupancy Form  3/31/2004 DONE
Permit Ready to Issue  3/31/2004 DONE
Telephone call  3/31/2004 DONE
permit ready and fee due
Application received  3/25/2004