Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-00592
StatusFinaled
Name POTTERY BARN
Site Address 350 N MILWAUKEE ST Unit: 1094
Project NameBTS - #1094
Customer Number 
ePlanReviewNo
Description
(POTTERY BARN)(BOISE TOWNE SQUARE-SPACE 1094) To construct a 10,860 sq.ft. retail tenant per approved plans. Previous tenant spaces 1094, 1097 and 1099 combined to form this one space. Work will include new storefront system, construction of new tenant demising wall, new nonrated corridor, installation of suspended ceiling system, alteration to the smoke evacuation system all new interior parititions and finishes, two new accessible restrooms, NOTE This building is fully fire sprinklered and contains a smoke evacuation system any alterations to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. The smoke evacuation system shall be maintained and Smoke zones shall be maintained to same areas. (Pc#162-04) rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/7/200512/7/200512/15/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice 9/29/200512/7/2005 DONE
First Notice 9/16/20059/29/2005 DONE
Permanent occupancy UNPAID FEE  10/20/2004 DONE
Perm. Occ. Cert. # 10330 issued 10-20-04 to the Pottery Barn at Boise Towne Square.
FIRE-Final Inspection10/15/200410/19/200410/19/2004APASS
DetailsTroy Cobbley
Fire life safety finaled 10/19/2004 12:50:00 PM
BLD-Final10/18/200410/19/200410/19/2004PPASS
DetailsJim Storey
russell; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Permanent Occupancy 10/19/200410/19/2004 DONE
Details
BLD-Final10/15/200410/18/200410/18/2004APART
DetailsJim Storey
russell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles manual flush bolts not allowed on back door/need to sign off racking permit upon signage posting/stocking of store ok pending fire insp. approval. 10/18/2004 11:34:07 AM
Inspection Record Card- Bld  10/14/2004 DONE
Print Occupancy Form  10/14/2004 DONE
BLD-Framing/Rough-in9/17/20049/20/20049/20/2004PPART
DetailsLane Manuel
russell; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
bathrooms, and office framing ok. 9/20/2004 3:37:35 PM
Case Summary (BLD)  9/17/2004  
BLD-Framing/Rough-in9/14/20049/15/20049/15/2004PPART
DetailsLane Manuel
russell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
r-framing ok to cover in sales area. see marked area on appr.plan 9/15/2004 3:18:02 PM
BLD-Foundation9/7/20049/8/20049/8/2004PPASS
DetailsLane Manuel
russell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
epoxied dowels @ trenches ok 9/8/2004 4:07:39 PM
BLD-Framing/Rough-in9/2/20049/3/20049/3/2004APART
DetailsLane Manuel
russel; Phone #: ###-#### Internet Inspection Request from: Annette Moore
partial framing ok. From line 19 to 21 ok to cover 9/3/2004 1:58:34 PM
Issue PAID IN FULL permit  7/28/2004 DONE
Telephone call  7/14/2004 DONE
left mess for dan o'farrell at ###-#### that permit is ready
Routing - FIRE5/27/2004 5/28/2004 PASS
resubmittal acceptable.
PLANS/APPL TAKEN TO FRONT DESK  5/28/2004 DONE
Routing - PLAN CHECK5/28/2004 5/28/2004 DONE
Inspection Record Card- Bld  5/28/2004 DONE
Permit Ready to Issue  5/28/2004 DONE
Telephone call  5/28/2004 DONE
left a message on William Karst's voicemail -- permit is ready.
Plan assigned to (R_H)4/1/2004 5/28/2004 PASS
Details
5/28/2004 15:44:29 RMH - activity updated through activity BLDA022 from case BLD04-00592.
Routing - PLAN CHECK4/21/2004 5/27/2004 PEND
No corrections required in building department plan review, routed plans to fire for review 0n 5/28/04, permit pending fire departments review.
Case Summary (BLD)  5/27/2004 DONE
Plan resubmittals received  5/25/2004 DONE
Received a response letter, correspondence letter, transmittal letter, three copies of structural calcs. one copy of lighting compliance certificate on 81/2 X 11 to Ron H., Response letter to Sam Rogers, three sets of sheets A5.01, A6.21,S1.1,M0.01,M1.01,M1.02,M2.02,P0.01,E1.01,E1.02, taken to Ron Hill
Plan Review Completed(1st rev)  4/19/2004 FAIL
failed plan check and Fire.
Routing - FIRE4/16/2004 4/19/2004 FAIL
Smoke control issues; review comments faxed to architect.
Routing - PLAN CHECK4/2/2004 4/16/2004 FAIL
Faxed and mailed requirements to the architect on 4/16/04, Routed plans to the fire department same day.
Routing - PUBLIC WORKS4/1/2004 4/2/2004 PASS
Plans ACCEPTED BY PLAN TECH  3/30/2004 DONE
Application received  3/29/2004  
Recd Pcfee & Taken To Pln CK  3/29/2004  
Fee Review-notes3/29/20043/29/2004