Third Notice BLD | 1/20/2006 | 1/20/2006 | 3/28/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/28/2005 | 12/28/2005 | 1/20/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 12/14/2005 | 12/14/2005 | 12/28/2005 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 12/14/2005 | 12/14/2005 | 12/14/2005 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 12/14/2005 | 12/14/2005 | 12/14/2005 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 10/10/2005 | 10/10/2005 | 10/10/2005 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/10/2005 | 8/10/2005 | 8/10/2005 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 8/5/2005 | 8/5/2005 | 8/5/2005 | P | PASS |
Forrest France
|
|
|
Shell permit life safety passed inspection.
|
BLD-Aging Inspection | 7/25/2005 | 7/25/2005 | 7/25/2005 | | PASS |
Jim Storey
|
|
|
|
BLD-Other | 5/25/2005 | 5/25/2005 | 5/25/2005 | P | PASS |
Jim Storey
|
|
|
JR Note: 1 hr ceiling basement; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles gyp ok in basement./
|
BLD-Energy code compliance | 5/17/2005 | 5/18/2005 | 5/18/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/17/2005 at 5:17:03 PM. Contact: ###-####.exterior walls ok.
|
BLD-Framing/Rough-in | 4/8/2005 | 4/11/2005 | 4/11/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 3:36:37 PM. Contact: ###-####.conf.
|
BLD-Footing | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | DEFR |
Jim Storey
|
|
|
JR; Phone #: ###-#### Internet Inspection Request from: Jan Rice wip si pending.
|
BLD-Foundation | 1/27/2005 | 1/27/2005 | 1/27/2005 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 7:35:36 AM. Contact: ###-####. placed w/si 1/27/2005 3:13:22 PM
|
BLD-Footing | 1/20/2005 | 1/21/2005 | 1/21/2005 | A | PART |
Jim Storey
|
|
|
JR; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles si need scope of work/ft ok pending report. 1/21/2005 2:03:06 PM
|
CHANGE STATUS TO (ISS) | | | 1/20/2005 | | DONE |
|
|
|
PERMIT DID NOT GET REISSUED AFTER PLAN MODIFICATION - 1/20/2005 CMC
|
Override - Parcel Holds | | | 1/18/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 1/18/2005 | | |
|
|
|
|
(F) Reprint permit | | | 1/18/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/18/2005 | | |
|
|
|
|
Receive PAYMENT IN FULL | | | 1/18/2005 | | DONE |
|
|
|
|
Routing - FIRE | 1/10/2005 | | 1/14/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/14/2005 | | 1/14/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 12/22/2004 | | 1/14/2005 | | PASS |
|
|
|
1/14/2005 15:39:12 JCM - activity updated through activity BLDA022 from case BLD04-00601.
|
Routing - PLANNING | 12/23/2004 | | 1/7/2005 | | PASS |
|
|
|
Approved.
|
Plan resubmittals requested | | | 12/23/2004 | | |
|
|
|
E-mailed the architect requesting revised energy sheets. JCM
|
Routing - PLAN CHECK | 12/22/2004 | | 12/23/2004 | | FAIL |
|
|
|
|
BLD-Conference | 12/22/2004 | 12/22/2004 | 12/22/2004 | A | PASS |
Jim Storey
|
|
|
wip
|
Plan Modification Accepted | | | 12/22/2004 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 12/22/2004 | | |
|
|
|
" Plan Modification excepted for BLD 04-00601 to change the front Two entrances to a single entrance,Enlarge basement from 1500 to just under 3,000 SF & changed the North with removal of doors.." Routed to John Menard.
|
CHANGE STATUS TO (ISS) | | | 11/16/2004 | | DONE |
|
|
|
already has been issued- but requesting an extension per jenifer gilliland until december 31st, 2004
|
Permit EXTENDED | | | 11/16/2004 | | DONE |
|
|
|
received letter from jenifer gilliland to extend permit until december 31st, 2004/mls-had letter scanned with records.
|
Ready Permit EXTENDED | | | 11/10/2004 | | DONE |
|
|
|
per letter from jenifer gilliland dated november 2nd 2004 ok until december 31st, 2004
|
BLD-Aging Inspection | 11/5/2004 | 11/5/2004 | 11/5/2004 | | NR |
Jim Storey
|
|
|
expires on 11/9/04 no activity. 11/5/2004 4:30:03 PM
|
BLD-Aging Inspection | 8/17/2004 | 8/17/2004 | 8/17/2004 | | FAIL |
Jim Storey
|
|
|
no call for insp 8/17/2004 10:17:01 AM
|
(F) Reprint permit | | | 5/14/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/13/2004 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 5/11/2004 | | 5/12/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/12/2004 | | 5/12/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/12/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/12/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/12/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plan assigned to (JCM) | 3/31/2004 | | 5/12/2004 | | PASS |
John Menard
|
|
|
5/12/2004 14:34:24 JCM - activity updated through activity BLDA022 from case BLD04-00601.
|
Routing - PLAN CHECK | 5/5/2004 | | 5/11/2004 | | |
|
|
|
|
Plan resubmittals received | | | 5/7/2004 | | DONE |
|
|
|
Received letter of transmittal, response letter, two sets of sheets A1.00,A3.00A5.00,EC.00,M2 taken to John Menard
|
Plan Reviewer's activity | | | 5/7/2004 | | PASS |
|
|
|
Reviewed and approved resubmitted plan sheets. JCM
|
Plan Review Completed(1st rev) | | | 5/4/2004 | | FAIL |
|
|
|
Failed Building & Public Works
|
Routing - FIRE | 4/29/2004 | | 5/4/2004 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 4/29/2004 | | |
|
|
|
Mailed the archtitect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 4/13/2004 | | 4/29/2004 | | FAIL |
|
|
|
|
Routing - PLUMBING | 4/9/2004 | | 4/13/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 4/8/2004 | | 4/8/2004 | | PASS |
|
|
|
Approved per DRH99-62.
|
Routing Off Site - STRUCTURAL | 4/1/2004 | | 4/8/2004 | | PASS |
|
|
|
Contacted PDQ for outside engineering.rad Received a fax from the consulting structural engineer approving the structural plans for this building. JCM
|
Routing - Erosion and Sediment | 4/7/2004 | | 4/8/2004 | | PASS |
|
|
|
ESC approved with conditons attached to plans.
|
Routing - PUBLIC WORKS | 4/2/2004 | | 4/7/2004 | | FAIL |
|
|
|
Requires drainage plan revisions per Brian M. kmm
|
Received Certificate of Value | | | 4/1/2004 | | DONE |
|
|
|
Received revised certificate of value for the shell $403,147.00.
|
Plan routing begun/NEW & ADDTN | | | 4/1/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/1/2004 | | HOLD |
|
|
|
Per John Menard needs revised certificate of value to reflect the TI and the application for the tenant space.
|
Routing - PLANNING Land Div | 4/1/2004 | | 4/1/2004 | | PASS |
|
|
|
Approved. Existing building on parcel.
|
Application received | | | 3/30/2004 | | |
|
|
|
|