(F) Reprint permit | | | 11/27/2007 | | |
|
|
|
|
Third Notice BLD | 12/7/2005 | 12/7/2005 | 12/15/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice | | 10/10/2005 | 12/7/2005 | | DONE |
|
|
|
|
First Notice | 9/22/2005 | 9/22/2005 | 10/10/2005 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | PASS |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Door with panic hardware installed in ext wall from restroom/hall area. Meets ADA req for 32" clear to ext.
|
DOC - Permit Finaled | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 8/23/2005 | 8/23/2005 | 8/23/2005 | P | PART |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Need Exit from common hallway at restrooms to exterior, and Min. 32 " width to public way.
|
BLD-Final | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | NR |
Jim Sly
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 2/9/2005 | 2/10/2005 | 2/10/2005 | A | PART |
Jim Sly
|
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Jan Rice Talked with Bill about Hall adjacent to Restrooms with no way to exit, since all doors leading into hall from tenants (3) have key pad entrys. Bill said that he notified each tenant to disengage the keypads while the Bldg is occupied, until we find a solution to this problem. 2/10/2005 11:14:47 AM
|
BLD-Final | 11/23/2004 | 11/24/2004 | 11/24/2004 | A | PART |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 11/23/2004 3:10:23 PM Temp Only.....OK to final after Code Enforce Perm approval. Bonded for landscaping. 11/24/2004 9:28:28 AM
|
Code Occupancy Approval Temp | 11/24/2004 | 11/24/2004 | 11/24/2004 | A | DONE |
Carol Montgomery
|
|
|
Bond posted - Modification of DR to be submitted. Temporary Occupancy Approved. 11/24/2004 9:19:22 AM
|
BLD-Final | 11/18/2004 | 11/18/2004 | 11/18/2004 | P | NR |
Jim Sly
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need Code Enforce. (ACHD and Public W done when adjacent Bldg completed. 11/18/2004 2:56:52 PM
|
FIRE-Final Inspection | 11/17/2004 | 11/17/2004 | 11/17/2004 | P | PASS |
Rick Jackson
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner Fire/life safety okay for final 11/17/2004 2:47:37 PM
|
BLD-Conference | 11/2/2004 | 11/2/2004 | 11/2/2004 | P | PASS |
Jim Sly
|
|
|
Bill-NOTE: Needs required sign's. for certif of completing for shell and core (inspectors); Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner Needed to know signatures req for Occ. 11/2/2004 3:47:08 PM
|
BLD-Framing/Rough-in | 8/19/2004 | 8/20/2004 | 8/20/2004 | A | PASS |
Jim Sly
|
|
|
janet; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 8/17/2004 | 8/18/2004 | 8/18/2004 | A | PART |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Prelim walk-thru....appears OK. Need all trade R/I s 8/18/2004 11:16:52 AM
|
BLD-Framing/Rough-in | 8/2/2004 | 8/3/2004 | 8/3/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/2/2004 at 2:02:14 PM. Contact: ###-####. Shear nailing and all framed ext. soffit areas OK 8/3/2004 10:05:59 AM 8/3/2004 10:06:19 AM
|
BLD-Framing/Rough-in | 8/2/2004 | 8/3/2004 | 8/3/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/2/2004 at 2:02:14 PM. Contact: ###-####. Shear nailing and all framed ext. soffit areas OK 8/3/2004 10:05:59 AM 8/3/2004 10:06:19 AM
|
BLD-Foundation | 5/20/2004 | 5/20/2004 | 5/20/2004 | P | PASS |
Jim Sly
|
|
|
audie; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 5/17/2004 | 5/18/2004 | 5/18/2004 | A | PASS |
Jim Sly
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Annette Moore Design strength for foundation 2500 psi..... No special insp. Req. Footing OK. 5/18/2004 10:36:08 AM
|
(F) Reprint permit | | | 5/18/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 5/17/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/17/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/17/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 5/17/2004 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 5/7/2004 | | 5/14/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/14/2004 | | 5/14/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2004 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 4/1/2004 | | 5/14/2004 | | PASS |
John Menard
|
|
|
5/14/2004 15:04:38 JCM - activity updated through activity BLDA022 from case BLD04-00625.
|
Routing - PLAN CHECK | 5/7/2004 | | 5/7/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/7/2004 | | |
|
|
|
Received a faxe response from the project structural engineer. JCM
|
Plan Reviewer's activity | | | 5/7/2004 | | PASS |
|
|
|
Reviewed and approved resubmitted plan sheet. JCM
|
Plan Review Completed(1st rev) | | | 5/6/2004 | | FAIL |
|
|
|
Failed Building, Plumbing, Public Works, ESC, Structural
|
Plan resubmittals received | | | 5/6/2004 | | DONE |
|
|
|
Received Transmittal Letter. 1 Set 3 Sheets A2.1 .. Taken to John Menard.
|
Plan resubmittals requested | | | 5/6/2004 | | |
|
|
|
Faxed the architect a copy of the comments for the second review by the consulting structural engineer requesting additional calculations. JCM
|
Routing - FIRE | 5/4/2004 | | 5/6/2004 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/29/2004 | | 5/6/2004 | | FAIL |
|
|
|
Contacted PDQ for outside engineering. Received fax from consulting structural engineer requesting additional calculations. JCM
|
Routing - PLAN CHECK | 5/3/2004 | | 5/4/2004 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 5/4/2004 | | |
|
|
|
Faxed the architect a request for resubmittals. JCM
|
Routing - PLUMBING | 4/29/2004 | | 4/30/2004 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PLAN CHECK | 4/15/2004 | | 4/29/2004 | | |
|
|
|
|
Plan resubmittals received | | | 4/22/2004 | | DONE |
|
|
|
Received 2 responce Letters & 3 Structural Plan Review Comment Responses, 3 sets of sheets EN1,P1,P2,P3,M1,M2 A3,A4,A6.1 These have been routed to John Menard..
|
Routing - PLUMBING | 4/14/2004 | | 4/14/2004 | | FAIL |
|
|
|
please provide a plan addressind the above listed items.
|
Routing - PLANNING | 4/13/2004 | | 4/14/2004 | | PASS |
|
|
|
Approve per DRH04-11.
|
Plan resubmittals requested | | | 4/14/2004 | | |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 4/1/2004 | | 4/13/2004 | | FAIL |
|
|
|
Contacted PDQ to take to outside engineering. kmm Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 4/12/2004 | | 4/13/2004 | | PASS |
|
|
|
ESC approved with conditons attached to plans.
|
Routing - Erosion and Sediment | 4/12/2004 | | 4/12/2004 | | FAIL |
|
|
|
Received only 1 ESC narrative.
|
Routing - PUBLIC WORKS | 4/1/2004 | | 4/9/2004 | | FAIL |
|
|
|
Requires street light plan. per Bill Colson. kmm
|
Routing - PLANNING Land Div | 4/1/2004 | | 4/1/2004 | | PASS |
|
|
|
Approved. Parcel over 5 acres in size.
|
Plans ACCEPTED BY PLAN TECH | | | 4/1/2004 | | DONE |
|
|
|
|
Application received | | | 3/31/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/31/2004 | | |
|
|
|
|
Fee Review-notes | 3/31/2004 | 3/31/2004 | | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/7/2004 | | | | |
|
|
|
Faxed the consulting structural engineer the response to the second review comments. JCM
|