Permit Information
Permit NumberBLD04-00639
StatusExpired
Name ASIN HOMES
Site Address 8919 W ARDENE ST
Project NameLand Equities Shell Building
Customer Number 
ePlanReviewNo
Description
(REF: BLD06-00379 )Land Equities Office (Shell) - to construct a 6,700 sq. ft. one story Type VB office shell building. Other work includes all site improvements, paving and landscaping per approved plans and attachments. This permit is for a shell only and no occupancy is authorized. Separate plans and permits are required for each tenant in order to gain occupancy. Energy compliance for lighting and HVAC for each tenant space must be included with the tenant improvement permit and plans. DRH03-41
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/17/2006 DONE
FIRE-Final Inspection3/6/20063/6/20063/6/2006PFAIL
DetailsTroy Cobbley
Val; Phone #: ###-#### Provide city approved plans
BLD-Conference3/3/20063/6/20063/6/2006ACANC
DetailsMike Jordan
###-#### - val
DOC - Permit Expired  3/6/2006  
Per Mike J. use Bld06-00379
Permit EXTENDED  3/3/2006  
permit extended per Bob Archibald 3/3/2006 - 3:00 pm cmc
Receive PAYMENT IN FULL PRINT  3/3/2006  
Case Summary (BLD)  12/2/2005  
BLD-Aging Inspection9/21/20059/21/20059/21/2005 PASS
DetailsJim Storey
doc expired
DOC - Permit Expired9/21/20059/21/20059/21/2005PPASS
DetailsJim Storey
no work performed over 6 mo.
BLD-Aging Inspection7/22/20057/22/20057/22/2005 PASS
DetailsJim Storey
BLD-Aging Inspection5/19/20055/19/20055/19/2005 PASS
DetailsJim Storey
wip
BLD-Framing/Rough-in9/20/20049/20/20049/20/2004PPASS
DetailsLane Manuel
Scheduled by a contractor via Hello! on 9/20/2004 at 10:19:05 AM. Contact: ###-####.
exterior shear/roof nailing ok. Interior framing of shell ok. 9/20/2004 3:20:42 PM
BLD-Foundation8/5/20048/6/20048/6/2004APASS
DetailsJim Sly
Erick; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Footing8/3/20048/3/20048/3/2004ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/3/2004 at 6:44:13 AM. Contact: ###-####.
BLD-Footing8/3/20048/3/20048/3/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/3/2004 at 6:44:13 AM. Contact: ###-####. 2500 PSI 8/3/2004 5:00:32 PM
(F) Reprint permit  7/23/2004  
Inspection Record Card- Bld  7/22/2004 DONE
Permit Ready to Issue  7/22/2004 DONE
Telephone call  7/22/2004 DONE
left a message for Gary -- permit is ready. adh.
Issue PAID IN FULL permit  7/22/2004 DONE
Routing - FIRE7/19/2004 7/21/2004 PASS
Resubmittal acceptable.
PLANS/APPL TAKEN TO FRONT DESK  7/21/2004 DONE
Plan assigned to (MLO)5/12/2004 7/21/2004 PASS
DetailsMike Otto
7/21/2004 14:02:56 MLO - activity updated through activity BLDA022 from case BLD04-00639.
Plan resubmittals received  7/19/2004 DONE
rec. United Water info
Routing - FIRE6/22/2004 6/25/2004 FAIL
No new hydt information provided or bldg modifications to make the existing hydt supply adequate, as requested in original review. Called architect; voice message says "on vacation until July 8th". Left voice message requesting he contact me upon his return. No changes made to original IFC review comments.
Routing - PUBLIC WORKS6/22/2004 6/22/2004 PASS
Routing - PLANNING Land Div6/17/2004 6/18/2004 PASS
Approved as Parcel "B" on ROS03-00065. ROS 6347 recorded on 11/25/03.
Routing - PLAN CHECK6/14/2004 6/17/2004 PASS
Routing - FIRE6/8/2004 6/11/2004 FAIL
DetailsBill Alexander
Plan Review Completed(1st rev)  6/11/2004 DONE
Failed:
Fire
Plan Check
Planning Land Div
Public Works
Plan resubmittals received  6/11/2004 DONE
Two copies of sheets B1x, B1, B2, B3, B4 and B5 received and forwarded to Mike Otto.
Routing - PLAN CHECK5/28/2004 6/8/2004 FAIL
corrections sent to architect
Routing Off Site - STRUCTURAL5/7/2004 6/8/2004 PASS
Contacted PDQ for pick up...
Plan resubmittals requested  6/8/2004 DONE
IBC corrections
Routing - PLUMBING5/27/2004 5/28/2004 PASS
water stubs to resrtooms must not be in exterior wall fur wall as required.
Routing - PLANNING5/26/2004 5/27/2004 PASS
Sarah Schafer DRH03-00041

Approved per DRH03-41.
Plan resubmittals received  5/27/2004 DONE
Received two C1, C2,BX1 sheet and put into plan sets continued routing.
Routing - Erosion and Sediment5/18/2004 5/26/2004 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS5/13/2004 5/17/2004 FAIL
needs two more sets of site drainage for plan sets.
Routing - PLANNING Land Div5/12/2004 5/12/2004 FAIL
Site plan does not match ROS 6347 recorded on 11/25/03. Called Gary Asin on 5/12/04 at ###-####.
Plans ACCEPTED BY PLAN TECH  5/7/2004 PEND
Requires 3 Sets of Reflected celing plans , 3 Sets of Lighting lay out & 3 Sets of Energy compliance sheets. And 2 extra site Grading & Drainage plans.
Recd Pcfee & Taken To Pln CK  5/4/2004  
Application received  4/2/2004  
Fee Review-notes5/4/20045/4/2004