Permit Information
Permit NumberBLD04-00640
StatusFinaled
Name BANEY CONSTRUCTION
Site Address 1426 S ENTERTAINMENT AVE
Project NameOxford Suites Hotel
Customer Number 
ePlanReviewNo
Description
Oxford Suites Hotel * To construct a new 91,785 sq.ft. four story, with a basement, 132 room suite hotel. The basement is 17,287 sq.ft. and contains, conference rooms, lounge, full service restaurant with kitchen. The first floor is 21,164 sq.ft. contains the indoor swimming pool, spa, lobby area and 30 guest room. The second floor is 20.084 sq.ft. contains 32 suites the third floor is 21,164 sq.ft. contains 39 suites and the forth floor is 17,287 sq.ft. contains 31 suites. NOTE: This building is fully fire sprinkliered for area increase. Separate permits are required to be obtained for the indoor pool and spa. All construction per the approved plans and attached comment list. Refer to BLD 04-01157 for Grading Permit. MJP DRH03-00148 CUP03-00068 PC#161-04
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD5/25/20065/25/20066/14/2006 DONE
First Notice has not been responded to.
First Notice 4/18/20065/25/2006 DONE
Permanent occupancy  4/18/2006 DONE
Perm. Occ. Cert. # 10983 issued 4-17-06 to the Oxford Suites Hotel.
FIRE-Final Inspection4/12/20064/13/20064/13/2006APASS
DetailsTroy Cobbley
Life safety finaled
Permanent Occupancy 4/13/20064/13/2006 DONE
Details
BLD-Final1/20/20061/20/20061/20/2006PPASS
DetailsMike Jordan
late pm please//bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Ok for perm occ once elec., and fire alarm/life/safety have been finaled.
BLD-Final1/20/20061/20/20061/20/2006PCANC
DetailsTom Arcoraci
FIRE-Final Inspection1/20/20061/20/20061/20/2006PPART
DetailsForrest France
Per S. Rogers a temporary occupancy was granted. Final pending two issues associated with the related alarm permit.
BLD-Final1/19/20061/20/20061/20/2006ACANC
DetailsTom Arcoraci
Temporary occupancy  1/20/2006 DONE
Temp. Occ. Cert. # 5357 issued 1-20-06 to the Oxford Suite Hotel.
FIRE-Final Inspection1/19/20061/19/20061/19/2006PFAIL
DetailsTroy Cobbley
Per Sam Rogers a temporary occupancy can be given if the elevators get signed off by the state elevator inspectors. This temporary occupancy is good for the fire alarm permit as well.
BLD-Final1/19/20061/19/20061/19/2006PNR
DetailsMike Jordan
bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
PubWorks Occupancy Approval1/18/20061/18/20061/18/2006 DONE
Drainage project accepted 1/18/06 S Landaluce.
BLD-Framing/Rough-in1/3/20061/3/20061/3/2006PPASS
DetailsMike Jordan
suspended ceiling grid//bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. ceiling grid ok.
BLD-Framing/Rough-in12/29/200512/30/200512/30/2005PFAIL
DetailsMike Jordan
bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Ceiling grid in basement.
BLD-Framing/Rough-in12/28/200512/28/200512/28/2005PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/28/2005 at 7:57:37 AM. Contact: ###-####. Checked all remaining penetrations at one hour lid in basement. Also inspected ceiling grid, not yet complete. Did partial walk thru.
BLD-Aging Inspection11/1/200511/1/200511/1/2005 PASS
DetailsTom Arcoraci
wip
BLD-Framing/Rough-in9/1/20059/1/20059/1/2005PPASS
DetailsTom Arcoraci
bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa fire stop at hard lid in basement ok
BLD-Framing/Rough-in7/19/20057/20/20057/20/2005APASS
DetailsTom Arcoraci
BLD-Framing/Rough-in7/19/20057/19/20057/19/2005PCANC
DetailsTom Arcoraci
bruck; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa re sched for 7-20 in am out of time
BLD-Framing/Rough-in6/14/20056/14/20056/14/2005PPART
DetailsTom Arcoraci
basement//bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok lid
Plan resubmittals requested  6/3/2005 DONE
BLD-Energy code compliance5/31/20055/31/20055/31/2005PPASS
DetailsJim Sly
bruce ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Insulation on 1st floor OK.
BLD-Framing/Rough-in5/24/20055/24/20055/24/2005PPASS
DetailsTom Arcoraci
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 1st floor
BLD-Framing/Rough-in5/20/20055/20/20055/20/2005PPASS
DetailsTom Arcoraci
fire caulking//bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Energy code compliance5/9/20055/10/20055/10/2005APART
DetailsTom Arcoraci
bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa 2nd floor
BLD-Framing/Rough-in5/5/20055/5/20055/5/2005PPART
DetailsTom Arcoraci
fire caulking inspection please///bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok 408
BLD-Framing/Rough-in5/2/20055/2/20055/2/2005PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/2/2005 at 8:16:04 AM. Contact: ###-####. 2nd floor ok
BLD-Framing/Rough-in4/27/20054/27/20054/27/2005PPART
DetailsTom Arcoraci
bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa 2nd floor cor ok to rock ok to insulate floor on 2nd floor rooms
BLD-Energy code compliance4/18/20054/18/20054/18/2005PPART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 3rd floor OK 4/18/2005 2:56:21 PM
BLD-Framing/Rough-in4/11/20054/11/20054/11/2005PPART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 3rd Flr OK to Cover except (2) Electrical rooms. 4/11/2005 4:25:50 PM
BLD-Energy code compliance3/29/20053/29/20053/29/2005PPART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Frame and Energy OK 4th Flr only. 3/29/2005 5:43:02 PM
BLD-Framing/Rough-in3/23/20053/24/20053/24/2005APART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walked 4th floor to inspect firestopping....Need UL assembly for 4" PVC.... Need more firecaulking at annulus at 1 1/2 and 2" PVC at top plate penitrations. OK'd to start insulation Ext and Party walls... will call for re-insp Mon. 3/24/2005 1:48:29 PM
BLD-Framing/Rough-in3/23/20053/23/20053/23/2005PNR
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference3/10/20053/11/20053/11/2005APART
DetailsJim Sly
Bruce; Phone #: ###-#### Jim & Tom both to insp. Internet Inspection Request from: Jan Rice Walk thru with Tom A. and Bruce. 3/11/2005 10:43:56 AM
BLD-Conference3/10/20053/11/20053/11/2005APASS
DetailsTom Arcoraci
Bruce; Phone #: ###-#### Jim & Tom both to insp. Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in3/10/20053/10/20053/10/2005PPART
DetailsJim Sly
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Talked to Bruce about all sub contractors to submit listed assemblies for penitrations thru rated walls/floors etc. 3/10/2005 4:56:11 PM
BLD-Framing/Rough-in3/9/20053/9/20053/9/2005PFAIL
DetailsJim Sly
for fire shaft-- bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need to complete fire taping in shafts...... 3/9/2005 5:27:55 PM
BLD-Framing/Rough-in2/22/20052/22/20052/22/2005PPART
DetailsLane Manuel
bruce; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
truss/ roof framing @ main bldg structure ok 2/22/2005 4:14:03 PM
BLD-Framing/Rough-in2/15/20052/15/20052/15/2005PCANC
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/15/2005 at 9:04:35 AM.
need to recheck truss calc's/ web bracing. Bracing missed, contr. to reschedule. 2/15/2005 4:35:18 PM
BLD-Framing/Rough-in2/7/20052/7/20052/7/2005PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/7/2005 at 7:39:49 AM. Contact: ###-####.
north and south lower roofs- nailing ok, including shear nailing in these areas only. 2/7/2005 1:55:15 PM
BLD-Framing/Rough-in2/3/20052/4/20052/4/2005PPART
DetailsLane Manuel
roof nailing bruce sleep ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
center/upper portion (only) of roof nailing ok 2/4/2005 3:14:58 PM
Case Summary (BLD)  11/19/2004  
BLD-Other10/28/200410/29/200410/29/2004PDONE
DetailsTroy James
Scheduled by a contractor via Hello! on 10/28/2004 at 10:38:58 AM. Contact: ###-####. verified 6 mil vapor barrier at slab on grade portion of hotel. 10/29/2004 2:04:38 PM
BLD-Other10/14/200410/15/200410/15/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/14/2004 at 1:23:30 PM. Contact: ###-####. Remainder of vapor barrier under slab....OK. 10/15/2004 9:57:16 AM
BLD-Other10/13/200410/14/200410/14/2004APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/13/2004 at 3:32:43 PM. Contact: ###-####. Inspection of 6 mil vapor barrier under Basement slab...gridline 10 to 16 OK . Sewell and Assoc Engineers OK'd Pool in close proximity to Basement wall provided that pool rebar is tied into slab ( located between pool and Bsmnt wall). Rebar ties from pool to slab verified and OK'd...... Pool rebar OK'd. 10/14/2004 9:31:32 AM 10/14/2004 9:35:59 AM
Plan resubmittals received  9/28/2004 DONE
Received 1 Set of A3,A4,A5,A6,A7,A12,A14,A15,A18,A25,A27 Taken to Mike Phillips.....
Plan resubmittals received  9/27/2004 DONE
Received Transmittal Letter, & 2 Sets of A3,A4,A5,A6,A7,A12,A14,A15,A18,A25,A27 Taken to Mike Phillips....
BLD-Foundation8/6/20048/6/20048/6/2004PNR
DetailsLane Manuel
JACK; Phone #: ###-#### Internet Inspection Request from: Annette Moore spec insp required mti 8/6/2004 4:16:59 PM
BLD-Footing8/4/20048/5/20048/5/2004PNR
DetailsTom Arcoraci
would like inspection in afternoon, please call if needs to be earlier than that. ; Phone #: ###-#### Internet Inspection Request from: Robynn Sleep
(F) Reprint permit  8/5/2004  
Routing - PLAN CHECK7/26/2004 8/4/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/4/2004 DONE
Print Pending Permit.LaserJet4  8/4/2004 DONE
Case Summary (BLD)  8/4/2004 DONE
Inspection Record Card- Bld  8/4/2004 DONE
Print Occupancy Form  8/4/2004 DONE
Permit Ready to Issue  8/4/2004 DONE
Issue PAID IN FULL permit  8/4/2004 DONE
Plan assigned to (M_P)4/5/2004 8/4/2004 PASS
DetailsMike Phillips
8/4/2004 11:03:25 M_P - activity updated through activity BLDA022 from case BLD04-00640.
Routing - FIRE8/2/2004 8/2/2004 PASS
approved based on conditions of storage as specified in Haz Mat report and included in final review comments. Review comments faxed to architect.
Plan resubmittals received  7/30/2004 DONE
REceived faxed Haz Mat report from Megan Davis.
Routing - PLAN CHECK7/23/2004 7/26/2004 PEND
Routed to Mikes Desk one 7/23/04\\routed to esc.
Routing - Erosion and Sediment7/26/2004 7/26/2004 PASS
ESC plan approved with attached conditions.
Routing - PLUMBING7/15/2004 7/22/2004 PASS
pool and spa to be indirectly drained, indirect all kitchen waste to floor sinks, additional cross connection protection may be required,
Routing - PLAN CHECK7/15/2004 7/15/2004 PEND
Waiting for others to approve prior to issuing permit.
Telephone call  7/15/2004 DONE
I called architect, L. Bremmeyer to follow up on resubmittal review faxed to him. He got it. I explained I had tried to classify the chemicals from the MSDS's but could not find classification data on two chemicals. I tried to obtain info on a "courtesy" basis from one of our approved consultants and they determined the Algae 60 is "toxic" but not sure if it is "highly toxic". They cannot have more "highly toxic" than the 10 lbs of chlorination tablets. The MSDS for the brominating tablets did not contain the inhalation LC50 data necessary to determine toxicity. The consultant called the manufacturer's Customer Service and left message for the MDSD person to call back but has not heard form them yet. I explained this is much further than we are supposed to go and I cannot help them further. They will have to contact a Haz Mat consultant to provide the necessary info on these two products. At his request I gave him the name of the person I used on a "courtesy" basis but explained they work for a living and they may have to pay for additional help; advised we have a list of other approved consultants if he desires to use someone else.
Telephone call  7/15/2004 DONE
Received telcon from Bruce Sleep, Oxford Suites Proj Supv re status of Haz Mat problem per my resubmittal review comments. Explained that I had just discussed this with the architect and referred him to call the architect. Also reviewed same info I gave to the architect.
Telephone call  7/15/2004 DONE
telcon from Megan Davis, the BioGard Alguard bromo talblets are "highly toxi" (inhalation LC50 of 0.16 mg/l). this will put them over the MAQ of 10 lbs of highly toxic material (since there are also 10 lbs of highly toxic chlorine tablets).
Telephone call  7/15/2004 DONE
received telcon VM from Cory Chamberlin, RE Oxford suites who says everyone else is confused, they won't have any pool chemicals on site. I called architect and left voice mail to call this man back and handle the issue. Too many players have been/and are trying to get involed; I am only going deal with him as the architect, who is responsible tp submit info to us.
Routing - PLANNING7/14/2004 7/15/2004 PASS
Approved per CUP03-68 and per DRH03-148, and as noted on sheet L-1.
Plan resubmittals received  7/14/2004 DONE
Received two letters of transmittal, response letter, hardware schedule, approved manufacturers list, response letter to plan review comments, two copies of structural calcs. two copies of sheets A002,A100, A101,A102, A103,A110, A111, A200,A201,A210,A212, A201,A210, A212,A213,A214,A215,A300,A310,A311,A312,A400,A401,A410,A411,A412,A413,A420,A421,A422,A430,A500,A510,A514,A515,A600,A610, M3.0,M3.1,M4.2 E1.0,E3.0E5.5, three copies of sheets S1,S2,S3,S4,S5,S8,S9,S11,S12,S13 taken to Mike
Routing - PLAN CHECK7/13/2004 7/14/2004  
Routing to Planning.
Plan resubmittals received  7/13/2004 DONE
Received two response letters along with two sets of sheets P-1 P-2 P-3, RD1, L1,
Routing - FIRE7/8/2004 7/13/2004 FAIL
Resubmittal lacked IFC haz mat classifications. Awaiting additional info from haz mat specialist on two chemicals. Other items approved subject to additional panic hardware as annotated on plans and to additional plan modifications still to be submitted to Bldg plan reviewer to eliminate basement/1st floor spiral staircase and wall dividing Conf rooms 1 and 2.
Routing - PLAN CHECK5/18/2004 7/8/2004 FAIL
Second review failied waiting for stamped and written response from architect, prior to issuing permit. Project may be issued prior to final plans approved on my building code review. Others must approve prior to issuing this permit.
Plan resubmittals received  7/1/2004 DONE
Received two copies of the respones letter, two revised certificates of value, plan review report response, roof ceiling systems, letter to Mike P, from mechanical consultants, lighting specifications, CDHD approval form, fire code review response, two sets of revised MO.1,MO.2,M1.0,M1.1,M1.2,M1.3,M1.4,M1.5,M1.6,M1.7,M1.8,M2.0,M2.1,E1.0,E1.1,E2.0,E3.0,E4.0,E5.0,E6.0,E7.0,E7.1,E8.0,E9.0,E10.0,E11.0,E11.1,E12.0,E12.1,E12.3,E12.3,EN1,EN1.1,EN2,EN3 All inserted by customer taken to Mike P.
Plan resubmittals received  6/10/2004 DONE
Received three copies of sheets E-1 & L-1 put with plans.
Telephone call  6/7/2004 DONE
Phoned Matt Munger to request a full size sheet of the revised fire truck turnaround. I requested he send it to the architect and have the architect resubmit with the remainder of the requested resubmittal items.
Plan resubmittals received  6/4/2004 DONE
Received fax from Matt Munger at Munger Engineering for the fire truck turnaround.
Telephone call  5/14/2004 DONE
FIRE ALARM DRAWINGS: Spoke with Lyle Bremmeyer regarding the fire alarm plans that were included with the building permit. I explained the plans did not have enough information to warrant a plan review at this time. I told Lyle that I would keep the drawings and when he found a local contractor/vendor, they could pick up these plans from me at city hall. I will have them in my cubicle, please refer whom ever is seeking these design drawings to me.
Routing - PLANNING5/12/2004 5/13/2004 FAIL
Landscape plan not provided as either a resubmittal to file # DRH03-149 or in the building permit set of plans. Applicant must submit a revised landscape plan indicating compliance with DRH03-148.
Plan resubmittals received  5/13/2004 DONE
Robynn Sleep came in to become responsible person.Con04-00232
Routing - FIRE5/6/2004 5/12/2004 FAIL
FD access, water supply info, means of egress, PFE's, add'l cooking hood info, to be addressed. Review comments faxed to architect.
Routing - PLUMBING5/5/2004 5/6/2004 FAIL
1. sewer line to bldg must be eight inch for gravity drainage from bldg. 2. suds relief-tubs and other suds producing fixtures must be eight feet from a vertical main and lowest fixture branch must be eight feet above vertical to horizonal change 3. grease interceptor discharge line needs a three inch vent back to the bldg. see attached detail for idaho approved gi. 4. sheet p-2 can't wet vent tubs on lav's between floors 5. need complete dwv drawing for basement 6. bldg backflow prventor is typically not in meter vault but in mechanical room 7. pool water supply may require additional backflow protection 8. base of all dwv stacks require a cleanout. 9. need fixture schedule for fixtures 10. health department requires indirect wastes on sinks in kitchen area. required floor sinks not shown. 11. need detail on boiler
Routing - Erosion and Sediment5/5/2004 5/5/2004 FAIL
Individuals listed as RP not certified by Boise City.
Routing - PLAN CHECK4/20/2004 5/3/2004 FAIL
Plan review completed, sent correction report to architect requesting additional informaiton be resubmitted for further review prior to issuing permit.
Routing - PUBLIC WORKS4/7/2004 4/20/2004 PASS
Routing Off Site - STRUCTURAL4/5/2004 4/14/2004 PASS
contacted PDQ to take plans to outside engineering. kmm
No further review required by our outside engineering firm.
Plans ACCEPTED BY PLAN TECH  4/7/2004 DONE
Waiting for updated cover sheet of application.
Plan resubmittals received  4/7/2004 DONE
Received transmittal letter, ESC application, two O&M manuals, two drainage calculations, two esc narratives, two sets of sheets C-1,C-2,C-3,C-4,C-5,C-6, put with plans.
Routing - PLANNING4/5/2004 4/7/2004 FAIL
DRH03-00148 Martin Santoyo, CUP03-00068 Susan Riggs
Pending DR approval
THE APPLICANT MUST PROVIDE A MINIMUM IF 119 PARKING SPACES. THE PLAN ONLY SHOWS 117. I REQUESTED APPLICANT TO SUBMIT A REVIESED PARKING PLAN ON 4-7-04 (Susan Riggs).
Plans ACCEPTED BY PLAN TECH  4/5/2004 FAIL
Requires:
1. Updated cover sheet of aplication.
2. Erosion and sediment control application. Received 4-7-04
3. Two copies of ESC plan narrative. Received 4-7-04
4. One additional copy of civil sheets.Received 4-7-04
5. Two copies of the O&M manual. Received 4-7-04
6. Two copies of the drainage claculations. Received 4-7-04
Emailed and phoned Cory Chamberlin of these needs. Will start routing. kmm
4/5/04 Received building permit application and ESC application. Put with plans. kmm
Routing - PLANNING Land Div4/5/2004 4/5/2004 PASS
Approved. Lot 2, Block 1 of Spectrum Pointe Subdivision, recorded on March 12, 2004.
Plan routing begun/NEW & ADDTN  4/5/2004 DONE
Application received  4/2/2004  
Recd Pcfee & Taken To Pln CK  4/2/2004 DONE
Third Notice BLD6/14/20066/14/2006   
Second Notice has not been responded to.
Fee Review-notes4/2/20044/2/2004   
Routing - PLAN CHECK8/2/2004