Third Notice BLD | 5/20/2005 | 5/20/2005 | 12/9/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Over a year old No final values
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/5/2005 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/5/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10410 issued 1-5-04 to the Idaho Spine and Sports Center.
|
Permanent Occupancy | | 11/8/2004 | 11/8/2004 | | DONE |
|
|
|
|
Code Occupancy Approval | 11/5/2004 | 11/8/2004 | 11/8/2004 | A | CANC |
Tom Arcoraci
|
|
|
Gary; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Final | 11/8/2004 | 11/8/2004 | 11/8/2004 | A | PASS |
Tom Arcoraci
|
|
|
ok for perm occ pending shell and core perm signatures 11/8/2004 9:44:26 AM 11/8/2004 9:47:41 AM
|
BLD-Final | 11/4/2004 | 11/5/2004 | 11/5/2004 | A | NR |
Jim Sly
|
|
|
Gary-call 1/2 hr before you go out; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner Told gary to call shell/core permit in B 4 .... or at the same time as T I 11/5/2004 12:11:35 PM
|
FIRE-Final Inspection | 9/29/2004 | 9/29/2004 | 9/29/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
BLD-Conference | 9/29/2004 | 9/29/2004 | 9/29/2004 | P | CANC |
Lane Manuel
|
|
|
gave c/n for ti.
ok to issue temp c of o.
|
BLD-Foundation | 6/11/2004 | 6/14/2004 | 6/14/2004 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/11/2004 at 6:36:40 AM. Contact: ###-####.
|
BLD-Footing | 6/11/2004 | 6/11/2004 | 6/11/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/11/2004 at 6:36:19 AM. Contact: ###-####. MTI passed fill for compaction. 2500psi Conc design.....No special insp Req. Footing OK. 6/11/2004 9:26:39 AM
|
BLD-Foundation | 6/3/2004 | 6/4/2004 | 6/4/2004 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/3/2004 at 6:39:05 AM. Contact: ###-####.
|
BLD-Footing | 6/3/2004 | 6/3/2004 | 6/3/2004 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/3/2004 at 6:38:46 AM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 5/27/2004 | | |
|
|
|
|
Plan assigned to (MLO) | 4/7/2004 | 4/7/2004 | 5/26/2004 | | PASS |
Mike Otto
|
|
|
5/26/2004 13:39:52 MLO - activity updated through activity BLDA022 from case BLD04-00657.
|
Routing - PLANNING Land Div | 5/26/2004 | | 5/26/2004 | | PASS |
|
|
|
Legal parcel in Ada County at time of annexation.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/26/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/26/2004 | | |
|
|
|
|
Print Occupancy Form | | | 5/26/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/26/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Permit Ready to Issue | | | 5/26/2004 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 5/21/2004 | | 5/24/2004 | | FAIL |
|
|
|
Need proof of legal land division.
|
Routing - PLAN CHECK | 5/20/2004 | | 5/21/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | | | 5/19/2004 | | PASS |
|
|
|
|
Routing - FIRE | 5/6/2004 | | 5/19/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/11/2004 | | 5/19/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/14/2004 | | DONE |
|
|
|
Received a response letter, copy of front page of tenant improvement application, detail sheet on shower stall, two sets of sheets A100,A102,A201,A302,A501,TP-1,TM-1,TM-2,M-1,M-2,E-1,E-2,TE-1,TE-2, taken to Mike Otto.
|
Routing - PLUMBING | 5/11/2004 | | 5/11/2004 | | PASS |
|
|
|
see attached letter from engineer
|
Plan resubmittals requested | | | 5/6/2004 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 4/20/2004 | | 5/6/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 4/20/2004 | | 4/20/2004 | | FAIL |
|
|
|
1. developer water line may require additional backflow protection 2. utility room shows a p-7 hub drain, this must be a floor drain 3. need expansion tank for expansion protection 4. p-3 shower must be handicapped provided detail 5. p-7 hub drain in developer room needs to be a floor sink for an indirect waste receptor 6. building as shown with ti does not meet cross sectional area venting for four inch sewer
|
Routing - PLANNING | 4/19/2004 | | 4/19/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/8/2004 | | 4/19/2004 | | FAIL |
|
|
|
requires revised drainage plan..
|
Plans ACCEPTED BY PLAN TECH | | | 4/7/2004 | | DONE |
|
|
|
routing with new building bld04-00656
|
Routing - PLANNING Land Div | 4/7/2004 | | 4/7/2004 | | FAIL |
|
|
|
|
Plan routing begun/TENANTS | | | 4/7/2004 | | DONE |
|
|
|
|
Application received | | | 4/5/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/5/2004 | | |
|
|
|
|
Fee Review-notes | 4/5/2004 | 4/5/2004 | | | |
|
|
|
|