Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00670
StatusFinaled
Name JORDAN-WILCOMB CO
Site Address 720 E PARK BLVD Unit: 220
Project NameMK CENTRAL PLAZA
Customer Number 
ePlanReviewNo
Description
(US DEPT OF JUSTICE-US TRUSTEE)(MK PLAZA-STE 220) New office tenant in an existing 3,935 sq. ft. space on second floor of existing building per approved plans on file. Work to include miscellaneous interior demolition work, new steel web stiffener to existing steel floor beam under Case File Area Room #205 per attached engineering calculations and details, new interior walls, new interior doors and sidelights, interior finish, new ceiling tile in existing ceiling grid, soffit work, providing a new accessible lavatory in existing adjacent Men's and Women's core restrooms, fire sprinkler and alarm work, mechanical work, plumbing work, and electrical work. Special Inspection is required for structural welding. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase with 60' on all sides for unlimited area. This building also has a fire alarm and smoke control exhaust system. (PC#0178-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/23/2013 DONE
Third Notice BLD12/7/200512/7/200512/16/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice 5/20/200512/7/2005 DONE
First Notice 7/28/20044/26/2005 DONE
Permanent Occupancy 7/28/20047/28/2004 DONE
Details
BLD-Final7/27/20047/28/20047/28/2004PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 7/27/2004 at 12:08:26 PM. Contact: ###-####.
Permanent occupancy  7/28/2004 DONE
Perm. Occ. Cert. # 7-28-04 to the U.S. Dept. of Justice.
FIRE-Final Inspection7/27/20047/27/20047/27/2004PPASS
DetailsRick Jackson
BLD-Framing/Rough-in7/20/20047/21/20047/21/2004PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 7/20/2004 at 9:42:24 AM. Contact: ###-####. Ok to install tiles at t-bar. 7/21/2004 2:18:05 PM
BLD-Conference6/29/20046/29/20046/29/2004PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 6/29/2004 at 10:18:35 AM. Contact: ###-####. Relocation of exit door to non-rated corridor. 6/29/2004 1:49:20 PM
FIRE-Conference6/23/20046/28/20046/28/2004APART
DetailsRick Jackson
colyn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Received requested info on the smoke control system 6/28/2004 12:29:37 PM
BLD-Framing/Rough-in6/28/20046/28/20046/28/2004PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 6/28/2004 at 8:27:36 AM. Contact: ###-####.
FIRE-Conference6/18/20046/21/20046/21/2004APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/18/2004 at 12:14:32 PM. Contact: ###-####. Reviewed project with GC; smoke evac info was requested through Ron Youngblood 6/21/2004 12:53:56 PM
BLD-Framing/Rough-in6/18/20046/21/20046/21/2004AFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 6/18/2004 at 12:15:13 PM. Contact: ###-####.Need plumbing and electrical approval. Need to remove screws penetrating steel stud wall top track from t-bar. 6/21/2004 10:25:00 AM
Issue PAID IN FULL permit  5/27/2004 DONE
Routing - FIRE5/11/2004 5/13/2004 PASS
resubmittal acceptable
Routing - PLAN CHECK5/13/2004 5/13/2004 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  5/13/2004 PASS
Inspection Record Card- Bld  5/13/2004 DONE
Print Occupancy Form  5/13/2004 DONE
Permit Ready to Issue  5/13/2004 DONE
Telephone call  5/13/2004 DONE
left mess that permits is ready
Plan assigned to (JCB)4/7/2004 5/13/2004 PASS
DetailsJason Blais
5/13/2004 11:41:27 JCB - activity updated through activity BLDA022 from case BLD04-00670.
Routing - PLAN CHECK4/14/2004 5/11/2004 PEND
When approved by Fire Dept. a permit can be issued. Plans to route to Fire Dept. for review.
Plan resubmittals received  5/6/2004 DONE
Received 2 Letters of Transmittal 2 Structural Calcs 2 Sets 8 Sheets A0.1,A2.0,A3.0,A2.1, & 2 Sets 6 Sheets E1.0, E2.0, E4.0 Taken to Jason Blais..
Routing - FIRE4/13/2004 4/14/2004 FAIL
exit door hardware and exit lighting issues; review faxed to architect.
Plan resubmittals requested  4/13/2004  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK4/9/2004 4/13/2004 FAIL
Plan review sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
Routing - PUBLIC WORKS4/7/2004 4/9/2004 PASS
Plans ACCEPTED BY PLAN TECH  4/7/2004 DONE
Application received  4/6/2004  
Recd Pcfee & Taken To Pln CK  4/6/2004  
Fee Review-notes4/6/20044/6/2004