Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-00688
StatusFinaled
Name T.J. NISBIT
Site Address 2611 S BROADWAY AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
(JACK IN THE BOX) Exterior and interior remodel to an existing 2,490 sq. ft. restaurant building including some site work per approved plans on file and DRH04-00018. Building area after remodel will be 2,518 sq. ft. Work to include demolishing existing mansard roof and vestibules, removing most exterior windows and doors, miscellaneous interior demolition work, new exterior parapet walls on entire building, some new exterior walls, some new exterior shear walls with 6x6 posts and hold-downs, some new concrete footings/foundation, new exterior doors and windows, new 3-coat stucco/plaster and some T-1-11 exterior finish, some new roofing and roof drains, some new exterior canopies, new fireplace structure at east exterior wall, new exterior dining patio enclosed by new low height CMU walls, some new interior walls and doors, interior finish, some new suspended ceiling work, some new ceiling joists with gyp. board ceiling, new service counter, two new Type I hoods in kitchen with one-hour fire rated grease duct wrap system, new equipment in kitchen, mechanical work, plumbing work, and electrical work. Special Inspection is required for epoxy/adhesive anchor installations. A new Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is NOT fire sprinklered. (PC#0187-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/20/20055/20/200512/9/2005 DONE
Second Notice has not been responded to.///Over a year old No final values
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice 12/6/20044/26/2005 DONE
Permanent Occupancy 12/6/200412/6/2004 DONE
Details
Code Occupancy Approval12/3/200412/6/200412/6/2004PDONE
DetailsWm. Michael Meloy
Compliance met. 12/6/2004 1:29:37 PM
Permanent occupancy UNPAID FEE  12/6/2004 DONE
Perm. Occ. Cert. # 10377 issued 12-6-04 to Jack-In-The-Box.
BLD-Conference12/2/200412/3/200412/3/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/2/2004 at 5:16:30 PM. Contact: ###-####. pending p&z/ final ok 12/3/2004 2:33:17 PM
BLD-Conference11/12/200411/15/200411/15/2004PPART
DetailsJim Storey
Brian-Early afternoon; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner ok for tainnig only. 11/15/2004 1:56:56 PM
FIRE-Final Inspection11/15/200411/15/200411/15/2004PPASS
DetailsRick Jackson
Fire/life safety okay 11/15/2004 1:22:17 PM
BLD-Conference11/9/200411/10/200411/10/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/9/2004 at 4:50:11 PM. Contact: ###-####.
BLD-Wall cover11/2/200411/3/200411/3/2004ANR
DetailsJim Storey
Brian-Ceiling Grid Inspection-call 1/2 prior; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner conf. 11/3/2004 10:24:18 AM
BLD-Framing/Rough-in10/1/200410/4/200410/4/2004APASS
DetailsJim Storey
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore exterior sheer ok and hd,s in place si epoxy report on file. 10/4/2004 8:52:57 AM
BLD-Framing/Rough-in9/24/20049/27/20049/27/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/24/2004 at 9:05:46 AM. Contact: ###-####. roof paripet ok for cover. 9/27/2004 9:57:17 AM
Inspection Record Card- Bld  9/14/2004 DONE
Print Occupancy Form  9/14/2004 DONE
Print Occupancy Form  9/14/2004  
(F) Reprint permit  9/14/2004 DONE
CHANGE STATUS TO (ISS)  9/14/2004  
permit issued
Plan assigned to (JCB)8/9/2004 9/9/2004 PASS
9/9/2004 14:44:10 JCB - activity updated through activity BLDA022 from case BLD04-00688.
Routing - PLANNING9/8/2004 9/9/2004 PASS
Approved and as noted on plans.
Routing - PLAN CHECK9/9/2004 9/9/2004 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  9/9/2004 PASS
Routing - PLAN CHECK9/1/2004 9/8/2004 FAIL
Plans to route to Marty Santoyo in Planning.
Telephone call  9/3/2004  
Called architect representative, Amanda Riggs, concerning issues still needing to be resolved with Planning and to have her fax over a new Certificate of Value for the project.
Routing - FIRE8/26/2004 9/1/2004 PASS
No revisions required to original review comments.
Routing - PLUMBING8/20/2004 8/26/2004 PASS
r.p. may be required at espresso and ansul system. min. 2" dwv below floor.
Routing - PLANNING8/19/2004 8/20/2004 FAIL
Building permit plans do not comply with approved Design Review documents; please note color palette. Also, walkway along east wall should not be designed to allow pedestrian travel across drive-through driveway.
Routing - PUBLIC WORKS8/17/2004 8/19/2004 PASS
Routing - Erosion and Sediment8/19/2004 8/19/2004 PASS
ESC plan approved with attached condtions.
Routing - PLAN CHECK8/13/2004 8/17/2004 FAIL
Called architect representative, Amanda Riggs, concerning a few minor items needing to be addressed. She indicated the issues would be addressed and information provided by fax. Plans to route to all other divisions for review of Plan Modification/changes to plans.
CHANGE STATUS TO (PND)  8/9/2004 DONE
Plan Mod. moved fees from bld04-01786 (jim toombs) voided that permit.
Plan Modification Accepted  8/9/2004 DONE
Plan modification excepted for BLD04-00688 for new structural at drive-thru tower, redesign/remodel of the kitchen and front counter areas, as well as the new associated mechanical, electrical, and plumbing work. Also relocation of the self service drink station and minor dining room layout. Called Amanda to let her know CDH needs to see this.
Issue PAID IN FULL permit  7/29/2004 DONE
Print Occupancy Form  7/22/2004 DONE
Inspection Record Card- Bld  7/22/2004 DONE
Permit Ready to Issue  7/22/2004 DONE
Telephone call  7/22/2004 DONE
spoke with Tom -- permit is ready. adh.
Routing - PLAN CHECK7/19/2004 7/21/2004 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  7/21/2004 PASS
Plan assigned to (JCB)4/16/2004 7/21/2004 PASS
DetailsJason Blais
7/21/2004 13:12:10 JCB - activity updated through activity BLDA022 from case BLD04-00688.
Routing - PLANNING7/19/2004 7/19/2004 PASS
Approved per DRH04-18.
Routing - Erosion and Sediment7/16/2004 7/19/2004 PASS
ESC plan approved with attached conditions.
Telephone call  7/16/2004  
Talked with architect representative, Amanda Riggs, concerning lighting plan sheets A2.0, ID1.2, and the Lighting COMcheck not matching. She was going to look into it and get back to me by fax.
Routing - PLAN CHECK5/13/2004 7/16/2004 FAIL
One last issue to be addressed. Contacted architect representative, Amanda Riggs, concerning lighting plans sheet A2.0, ID1.2, and the Lighting COMcheck do not match. She was going to look into it and get back to me by fax. Plans also still need approval by Planning and Erosion/Sediment Control. Plans to route to these divisions for review.
Telephone call  7/15/2004  
Structural engineer called to specify some details that were missing on 1/S4.1 and size of footing at drive thru location. Items will be red-lined on the resubmittal sheets.
Telephone call  7/14/2004  
Called Tom Spader, architect representative, concerning clarification on just a few issues. He said he would look into it and get back to me.
Plan resubmittals received  7/2/2004 DONE
Received a response letter to Jason B., letter regarding structural items, three sets of sheets TS1.0, SD1.0, SD2.0, SD3.0,L-1,D1.0,D2.0, D3.1, D4.0,D4.1,A1.0,A2.0,A2.1,A3.0,A4.0, A4.1, A4.3,A4.4, A5.0, A6.0, A6.1, A7.0, A7.1, A8.0, A8.1, A8.2, A8.3, ID1.0, ID1.1, ID1.2, ID2.0, ID2.1, ID3.0, ID3.1, ID3.2, ID4.0, ID4.1, S1.0, S2.0, S2.2,S3.0, S4.0, S4.1, S5.0, MEP1, M-4, E1, E3, E4, P3, K1.0, K2.0, SP1.0, SP1.1, SP1.2, SP2.0, SP3.0, SP4.0, SP5.0, taken to Jason.
Routing - FIRE5/10/2004 5/13/2004 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  5/13/2004 DONE
Routing - PLAN CHECK4/28/2004 5/10/2004 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
Plan resubmittals requested  5/10/2004  
Plan resubmittals and written response required for further review.
Routing - PLUMBING4/26/2004 4/28/2004 PASS
per plans, scope of work on page MEP1 and 2000 upc.
Routing - PLANNING4/22/2004 4/26/2004 FAIL
Applicant has not complied with conditions of DRH04-00018.
Routing - Erosion and Sediment4/22/2004 4/22/2004 FAIL
No waiver or esc plan attached with plan.
Routing - PUBLIC WORKS4/16/2004 4/21/2004 PASS
Plans ACCEPTED BY PLAN TECH  4/13/2004 DONE
Plan routing begun/TENANTS  4/13/2004 DONE
Store #6004
Application received  4/8/2004  
Recd Pcfee & Taken To Pln CK  4/8/2004  
Fee Review-notes4/8/20044/8/2004