Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD04-00690
StatusFinaled
Name RICHARD O FREIHEIT
Site Address 205 N MILWAUKEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(JACK IN THE BOX) Exterior and interior remodel to an existing 2,360 sq. ft. restaurant building including some site work per approved plans on file and DRH04-00019. Building area after remodel will be 2,390 sq. ft. Work to include demolishing existing mansard roof and vestibules, removing most exterior windows and doors, miscellaneous interior demolition work, new exterior parapet walls on entire building, some new exterior walls, some new exterior shear walls with 6x6 posts and hold-downs, some new concrete footings/foundation, some new structural steel work, new exterior doors and windows, new 3-coat stucco/plaster and some T-1-11 exterior finish, some new roofing and roof drains, some new exterior canopies, new fireplace structure at east exterior wall, new exterior pergola structure at drive-thru, new exterior dining patio enclosed by new low height CMU walls, some new interior walls and doors, interior finish, some new suspended ceiling work, some new ceiling joists with gyp. board ceiling, new service counter, two new Type I hoods in kitchen with one-hour fire rated duct wrap system, some new equipment in kitchen, mechanical work, plumbing work, and electrical work. Special Inspection required for epoxy/adhesive anchor installations, structural field welding, and for concrete, reinforcement, and bolts in concrete at Footings #3. A new Certificate of Occupancy is to be issued when completed and approved. Interior demolition work done under separate permit, BLD04-02216. NOTE: This building is NOT fire sprinklered. (PC#0188-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  8/8/2007 DONE
Third Notice BLD5/20/20055/20/200512/9/2005 DONE
Second Notice has not been responded to.///Over a year old No final values
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice 11/24/20044/26/2005 DONE
FIRE-Final Inspection11/23/200411/24/200411/24/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled. Engineer, Steve Howard ###-####, to supply revised air balance report to me by email 11/24/2004 1:53:12 PM
BLD-Final11/23/200411/24/200411/24/2004PPASS
DetailsLane Manuel
Scheduled by a contractor via Hello! on 11/23/2004 at 4:06:18 PM. Contact: ###-####.
perm. c of o ok 11/24/2004 2:29:53 PM
Permanent occupancy UNPAID FEE  11/24/2004 DONE
Perm. Occ. Cert. # 10367 issued 11-24-04 to Jack in the Box.
Permanent Occupancy 11/23/200411/23/2004 DONE
Details
BLD-Final11/19/200411/22/200411/22/2004PCANC
DetailsLane Manuel
Scheduled by a contractor via Hello! on 11/19/2004 at 7:07:01 AM. Contact: ###-####.
11/22/2004 12:52:33 PM need final insp's. by others prior to bldg. final 11/22/2004 12:54:30 PM
FIRE-Final Inspection11/19/200411/22/200411/22/2004AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/19/2004 at 7:09:33 AM. Contact: ###-####. Repair exit signs; post occupant load sign; deep fat fryers need to be no more than 16 inches from nozzles; need air balance report; hang extinguishers 11/22/2004 3:52:36 PM
Code Occupancy Approval Temp11/22/200411/22/200411/22/2004ADONE
DetailsScott M.Brown
TEMP SIGNED OFF, NEW LANDSCAPE NEEDS BARK GROUND COVER THE REST MAY REMAIN ROCK, TOLD THIS WOULD BE DONE IN JUST A FEW DAYS.. 11/22/2004 11:02:44 AM 11/22/2004 11:03:23 AM
BLD-Other11/18/200411/19/200411/19/2004AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/18/2004 at 11:54:45 AM. need vapor berrior 11/19/2004 10:34:34 AM
BLD-Other11/19/200411/19/200411/19/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 11/19/2004 at 7:06:13 AM. Contact: ###-####.
recheck additional support wires @ ceiling grid for ceiling accessory supports. 11/19/2004 2:51:48 PM
FIRE-Conference11/17/200411/18/200411/18/2004ADONE
DetailsTroy Cobbley
Spoke to Pete about the fire life safety review notes and requirements. 11/18/2004 10:35:17 AM
BLD-Other11/17/200411/17/200411/17/2004APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 11/17/2004 at 7:24:32 AM. Contact: ###-####.
t-bar in back "galley" section ok 11/17/2004 12:02:40 PM
BLD-Framing/Rough-in11/1/200411/1/200411/1/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/1/2004 at 7:20:44 AM. fire blocking above fire place ok to cover 11/1/2004 9:30:47 AM
BLD-Energy code compliance10/20/200410/22/200410/22/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/20/2004 at 10:37:29 AM. Contact: ###-####. Frame and Energy OK. 10/22/2004 11:59:18 AM
BLD-Framing/Rough-in10/20/200410/21/200410/21/2004PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/20/2004 at 10:30:32 AM.
BLD-Framing/Rough-in10/20/200410/20/200410/20/2004PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/20/2004 at 10:36:43 AM. Contact: ###-####. Framing OK at Ext. walls of Kitch and lobby Pend Electr approval. Told Contr to Fireblock F/P chase 10' OC 10/20/2004 3:19:26 PM
BLD-Framing/Rough-in10/14/200410/15/200410/15/2004PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/14/2004 at 2:46:13 PM. Contact: ###-####. Shear nailing at E. 1/2 of N. and S. walls.......and E. wall (except for F/P pop out) OK. 10/15/2004 3:21:43 PM
BLD-Framing/Rough-in10/13/200410/14/200410/14/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/13/2004 at 5:08:04 PM. Contact: ###-####. roof ok a35 in place through out roof. 10/14/2004 2:26:34 PM
BLD-Framing/Rough-in10/8/200410/11/200410/11/2004APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 10/8/2004 at 12:46:55 PM. Contact: ###-####.
rough frame @ roof for new cricket, west end OK. 10/11/2004 8:50:57 AM
BLD-Footing10/5/200410/6/200410/6/2004PCANC
DetailsLane Manuel
Scheduled by a contractor via Hello! on 10/5/2004 at 11:02:53 AM. Contact: ###-####.
BLD-Footing10/5/200410/5/200410/5/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 10/5/2004 at 9:48:20 AM. Contact: ###-####.
to be inspected by special inspector. (Strata) 10/5/2004 1:24:36 PM
Permit Ready to Issue  9/29/2004 DONE
Inspection Record Card- Bld  9/29/2004 DONE
Print Occupancy Form  9/29/2004 DONE
Issue PAID IN FULL permit  9/29/2004 DONE
Routing - PLAN CHECK9/28/2004 9/28/2004 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  9/28/2004 PASS
Routing - FIRE9/24/2004 9/28/2004 PASS
revised comments to reflect plan revisions.
Plan assigned to (JCB)4/16/2004 9/28/2004 PASS
DetailsJason Blais
9/28/2004 15:14:11 JCB - activity updated through activity BLDA022 from case BLD04-00690.
Routing - PLUMBING9/23/2004 9/24/2004 PASS
2" min dwv below slab, r.p. required for espresso mechine, r.p. required on water line to ansul system, additional cross connection protection may be required.
Routing - PLANNING9/21/2004 9/23/2004 PASS
Approved per DRH04-19.
Routing - PUBLIC WORKS9/20/2004 9/21/2004 PASS
Routing - PLAN CHECK8/5/2004 9/20/2004 PEND
Plan/permit approval pending per approval by Public Works, Plumbing, Planning, Fire Department, steel structural calcs., and new Certificate of Value still needed. Plans to route to these divisions for approval.
Telephone call  9/16/2004  
Called design engineer Herb Ahten concerning some clarification on some issues. A fax detail will be provided that was not updated on the foundation detail sheet. Herb stated that Special Inspections required are epoxy/adhesive anchors, structural field welding, and concrete, reinforcement, and bolts installed in concrete for Footings #3. (Large square pad footings at steel columns.)
Telephone call  9/16/2004  
Called architect representative, Tom Spader, and explained that an updated Certificate of Value is needed, Health Dept. verification of approval of changes to plan needed, and clarification of support of one end of the new 6x12 beam needed by fax. (Not shown on foundation plan.)
Telephone call  9/16/2004  
Called Frank Isenberg of the Health Department. He stated that he had approved the project with the changes and would fax me over approval verification to attach to the plans.
Plan resubmittals received  8/25/2004 DONE
Received transmittal letter, response letter, canopy & sign details, two copies of structural calculations, three sets of sheets TS1.0,SD1.0,SD2.0,SD3.0,SD4.0,L-1,D1.0,D2.0,D3.0,D4.0,D4.1,A1.0,A2.0,A2.1,A3.0,A4.0,A4.1,A4.2,A4.3,A4.4,A5.0,A6.0,A6.1,A6.2,A7.0,A7.1,A7.2,A8.0,A8.1,A8.2,A8.3,A8.4,A9.0,ID1.0,ID1.1,ID1.2,ID2.0,ID2.1,ID2.2,ID2.3,ID3.0,ID3.1,ID3.2,ID4.0,ID4.1,S1.0,S2.0,S2.1,S3.0,S4.0,S4.1,S4.2,S5.0,S5.1,M1.0,M2.0,M3.0,M4.0,H1.0,P1.0,P2.0,P3.0,P3.1,P4.0,P5,E1.0,E1.1,E2.0,E2.1,E3.0,E4.0,E5.0,E6.0,E7.0,E8.0,K1.0,K1.1,K2.0,K3.0,K3.1,SP1.0,SP1.1,SP1.2,SP2.0,SP3.0,SP4.0,SP5.0, taken to Jason B.
Routing - PLANNING8/2/2004 8/5/2004 PASS
Approved per DRH04-19.
Routing - Erosion and Sediment7/30/2004 8/2/2004 PASS
ESC plan approved with attached conditions.
Plan resubmittals requested  7/30/2004  
Second plan review faxed and sent to architect. Resubmittals and written response required for further review again.
Routing - PLAN CHECK6/4/2004 7/30/2004 FAIL
Resubmittal package not adequate. Some issues not addressed or addressed adequately. Missing additional structural calculations. Second plan review sent and faxed to architect. Plans to route to Erosion/Sediment Control and then to Planning (Marty Santoyo) for review again.
Plan resubmittals received  7/21/2004 DONE
Received letter of transmittal with three sets of sheets TS1.0,SD1.0,SD2.0,SD3.0,L-1,D1.0,D2.0,D3.0,D4.0,D4.1,A1.0,A2.0,A2.1,A3.0,A4.0,A4.1,A4.2,A4.3,A4.4,A5.0,A6.0,A6.1,A7.0,A7.1,A8.0,A8.1,A8.2,A8.3,ID1.0,ID1.1,ID1.2,ID2.0,ID2.1,ID2.2,ID3.0,ID3.1,ID3.2,ID4.0,ID4.1,S1.0,S2.0,S2.1,S3.0,S4.0,S4.1,S4.2,S5.0,S5.1,MEP1,M-4,E1,E3,E-4,P3,K1.0,K2.0,SP1.0,SP1.1,SP1.2,SP2.0,SP3.0,SP4.0,SP5.0, response letter, structural engineer response letter taken to Jason B.
Routing - FIRE6/2/2004 6/4/2004 PASS
Plan Review Completed(1st rev)  6/4/2004 FAIL
Failed plan check, planning and erosion.
Plan resubmittals requested  6/2/2004  
Plan resubmittals and written response required for further review.
Plan resubmittals received  6/2/2004 DONE
Received via Steve Webb Letter of transmittal from JUB, with esc application(no RP listed), two narratives and two set esc plan
Routing - PLAN CHECK4/28/2004 6/2/2004 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
Routing - PLUMBING4/27/2004 4/28/2004 PASS
per plans, scope of work on page MEP1 and 2000 upc.
Routing - PLANNING4/22/2004 4/26/2004 FAIL
Applicant has not complied with conditions of DRH04-00019
Routing - Erosion and Sediment4/22/2004 4/22/2004 FAIL
Requires ESC application, waiver letter and or plan. All per Steve Webb. kmm
Routing - PUBLIC WORKS4/16/2004 4/21/2004 PASS
Plans ACCEPTED BY PLAN TECH  4/13/2004 DONE
Store #6003. May require ESC.
Application received  4/8/2004  
Recd Pcfee & Taken To Pln CK  4/8/2004  
Fee Review-notes4/8/20044/8/2004