Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/9/2005 | | PASS |
|
|
|
Second Notice has not been responded to.
|
Second Notice | | 5/20/2005 | 12/6/2005 | | DONE |
|
|
|
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/12/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/12/2004 | 8/12/2004 | | DONE |
|
|
|
|
BLD-Final | 8/12/2004 | 8/12/2004 | 8/12/2004 | P | PASS |
Tom Arcoraci
|
|
|
ok for perm occ
|
Permanent occupancy | | | 8/12/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10258 issued 8-12-04 to the Bishop Kelly High Weight Rm. addn.
|
FIRE-Final Inspection | 8/6/2004 | 8/6/2004 | 8/6/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 8/6/2004 1:40:34 PM
|
BLD-Final | 8/6/2004 | 8/6/2004 | 8/6/2004 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/6/2004 at 7:48:35 AM. Contact: ###-####. ok for temp occ needs eng letters of ok 8/6/2004 2:19:12 PM
|
FIRE-Final Inspection | 8/4/2004 | 8/4/2004 | 8/4/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide one fire extinguisher per the fire review notes and provide "No Parking-Fire Lane" verbage on the red curbing at the new addition
|
Code Occupancy Approval | | | 8/4/2004 | | PASS |
|
|
|
ALL IN AS REQUIRED, AS A NOTE THE NEW PARKING SPACES ARE NOT A REQUIREMENT THE TOTAL SCHOOL NUMBER OF SPACES ARE MORE THEN REQUIRED SO THIS ADDITIONAL PARKING IS NOT BEING PUT IN, FINAL SIGNED OFF.
|
BLD-Aging Inspection | 7/27/2004 | 7/27/2004 | 7/27/2004 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 5/26/2004 | 5/27/2004 | 5/27/2004 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/26/2004 at 2:41:29 PM. Contact: ###-####. not reay still needs addtional items done, they can recall for tommorow or have special inspection for the pour Terricon is doing cyliders. Noted this with concrete contractor at the site. 5/27/2004 4:01:39 PM
|
BLD-Footing | 5/26/2004 | 5/26/2004 | 5/26/2004 | P | PART |
Russ Owen
|
|
|
Exterior footings only, the footings at the existing building wall are not done. 5/26/2004 4:53:20 PM I called the structural enginner and told him of the footing being blocked off for the large pipe under it , for about 14" . He said this would be ok wall above will not be affected by this. Concrete truck on site now.Note: the approved set of prints is not to be found, so contractor will have them at next inspection, I did have the engineers stamped set in which I borrowed from Teracon. /2004 4:54:48 PM 5/26/2004 4:55:38 PM 5/26/2004 4:59:26 PM
|
BLD-Footing | 5/25/2004 | 5/26/2004 | 5/26/2004 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/25/2004 at 9:33:20 PM. Contact: ###-####. Work will be inspected by MTI. 5/26/2004 1:51:25 PM
|
Plan assigned to (MLO) | 4/13/2004 | | 5/21/2004 | | PASS |
Mike Otto
|
|
|
5/21/2004 09:29:40 MLO - activity updated through activity BLDA022 from case BLD04-00705.
|
Routing - PLAN CHECK | 5/21/2004 | | 5/21/2004 | | DONE |
|
|
|
process permit
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/21/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/21/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/21/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/21/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/21/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 5/21/2004 | | DONE |
|
|
|
|
Routing - PLANNING | 5/19/2004 | | 5/20/2004 | | PASS |
|
|
|
Pass CUP99-0003 MOD 1
|
Routing - PLAN CHECK | 5/18/2004 | | 5/19/2004 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 5/19/2004 | | |
|
|
|
|
Routing - PUBLIC WORKS | 5/14/2004 | | 5/17/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/14/2004 | | DONE |
|
|
|
Received Transmittal Letter. 2 Sets A1.11,A2.41,A4.21 Taken to Mike Otto...
|
Routing - Erosion and Sediment | 5/12/2004 | | 5/13/2004 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - PLAN CHECK | 5/13/2004 | | 5/13/2004 | | NR |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/4/2004 | | 5/12/2004 | | PASS |
|
|
|
Called PDQ for out-side delivery
|
Plan Review Completed(1st rev) | | | 5/12/2004 | | DONE |
|
|
|
|
Application received | | | 5/12/2004 | | |
|
|
|
|
Routing - FIRE | 5/7/2004 | | 5/12/2004 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 4/26/2004 | | 5/7/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 5/7/2004 | | DONE |
|
|
|
IBC corrections
|
Plan resubmittals received | | | 5/4/2004 | | DONE |
|
|
|
Received Letter Transmittal with 3 Sets Sheets S-1,S-2,S-3. Sent to Mike Otto
|
Routing Off Site - STRUCTURAL | 4/14/2004 | | 4/27/2004 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. 4/27/2004 recevd call from reviewing engineer and metal building plans and calcs for same have not been provided. Contacted Richard Honsinger and relayed message to provide three sets plans and two sets calcs stamped and signed. MLO
|
Routing - PLUMBING | 4/26/2004 | | 4/26/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/23/2004 | | DONE |
|
|
|
Received Letter of Transmittal with 3 ESC plans and 2 narrative and O & M manual..Routed to Mike Otto...
|
Plan resubmittals received | | | 4/22/2004 | | DONE |
|
|
|
Received Letter of Transmittal for the Bishop Kelly High School Addition (3) sheets of ESC Erosion and Sediment Control Plans and (1) Copy of Revised Erosion and Sediment Control Narrative Report. Routed to Mike Otto...
|
Routing - Erosion and Sediment | 4/20/2004 | | 4/20/2004 | | FAIL |
|
|
|
See notes under ESC permit. Contacted Plan designer.
|
Routing - Erosion and Sediment | 4/19/2004 | | 4/20/2004 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 4/14/2004 | | 4/19/2004 | | FAIL |
|
|
|
Requires Drainage plan and letter from structural engineer.
|
Plans ACCEPTED BY PLAN TECH | | | 4/15/2004 | | PEND |
|
|
|
Received transmittal letter, affidavit of legal interest, sign in sheet neighborhood meeting, notification of CU application, two copies of ESC narrative, new application, esc application, six sets of sheets A1.21R,A1.30R,C1.0R,C2.0R, two ESC plans, four E1.0 sheets, four M2.11 sheets taken to Mike O. RAD Put ESC information with plans.
|
Plan routing begun/NEW & ADDTN | | | 4/14/2004 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 4/14/2004 | | 4/14/2004 | | PASS |
|
|
|
Site is over 33 acres in area.
|
Plans ACCEPTED BY PLAN TECH | | | 4/13/2004 | | FAIL |
|
|
|
Requires 1. Two copies of ESC plan, narrative and application.
2. Lighting compliance cert. needs to be signed.
3. No mech. compliance cert.
4. Three extra civil sheets with O&M manuals and drainage calcs.
|
Application received | | | 4/9/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2004 | | |
|
|
|
|
Fee Review-notes | 4/9/2004 | 4/9/2004 | | | |
|
|
|
|