Third Notice BLD | 8/18/2006 | 8/18/2006 | 2/5/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/7/2006 | 7/7/2006 | 8/18/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/22/2006 | 7/7/2006 | | DONE |
|
|
|
|
BLD-Final | 5/22/2006 | 5/22/2006 | 5/22/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/22/2006 at 7:34:06 AM. Contact: ###-####. Ok for perm occ. Reveiwed letter from arch. deleating 2hr walls, letter from special insp. agency and letter freom structural engineer aproving non conformances with special insp. Actuall insp. performed by Jim Sly.
|
Permanent Occupancy | | 5/22/2006 | 5/22/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/22/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11034 issued 5-22-06 to the Boise Valley Adventist School.
|
FIRE-Final Inspection | 5/18/2006 | 5/19/2006 | 5/19/2006 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Aging Inspection | 4/14/2006 | 4/14/2006 | 4/17/2006 | | NR |
Troy Cobbley
|
|
|
I received a phone call from CM Company today and the lady stated that the door locks would be blanked off.
|
FIRE-Final Inspection | 1/11/2006 | 1/12/2006 | 1/12/2006 | A | FAIL |
Troy Cobbley
|
|
|
The cut sheet that was provided for the thumbturn locks was for "Falcon" but the manufacture of the locks is "CorbinRusswin". Need the correct cut sheet.
|
CHANGE STATUS TO (ISS) | | | 1/3/2006 | | DONE |
|
|
|
Still needs finals from building and fire.rad
|
FIRE-Final Inspection | 12/29/2005 | 12/30/2005 | 12/30/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide data sheets to prove thumbturn dead bolts are ADA approved
|
Third Notice BLD | 12/7/2005 | 12/7/2005 | 12/16/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice | | 11/16/2005 | 12/7/2005 | | DONE |
|
|
|
|
First Notice | | 10/26/2005 | 11/16/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 10/26/2005 | 10/26/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/26/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10783 issued 10-26-05 to the Boise Valley Adventist School.
|
BLD-Final | 10/21/2005 | 10/21/2005 | 10/21/2005 | P | NR |
Jim Sly
|
|
|
|
BLD-Final | 8/25/2005 | 8/26/2005 | 8/26/2005 | A | CANC |
Jim Sly
|
|
|
call for access///dan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Final | 8/26/2005 | 8/26/2005 | 8/26/2005 | P | PART |
Jim Sly
|
|
|
dan -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp.....Per PDS approval Cert #5264 C/N Architect to submit letter omitting 1 hr walls, Need final letter from Eng, Need final Affidavit from specail insp agency.
|
Telephone call | | | 8/26/2005 | | DONE |
|
|
|
Approved for TOC by Fire Marshal D. Hanneman, based on fire/ life safety inspection conducted by F. France today and discussion of D. Hanneman with Jackie Phelps, CM construction company. Correction list left on site by F. France; all items to be completed a soon as practicable.
|
Temporary occupancy | | | 8/26/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5264 issued 8-26-05 to Boise Valley Adventist School.
|
FIRE-Final Inspection | 8/18/2005 | 8/18/2005 | 8/18/2005 | P | FAIL |
Troy Cobbley
|
|
|
Final the fire sprinkler permit. Provide occupant load signs per review note #27. Provide one additional extinguisher in the northwest corner of the gym. Provide exit discharge lighting as discussed at each exit from the new building per building review comments note #46. Provide signage for fire access as shown on sheet A1.0
|
FIRE-Final Inspection | 8/15/2005 | 8/16/2005 | 8/16/2005 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 8/15/2005 at 2:11:25 PM. Contact: ###-####.
|
PubWorks Occupancy Approval | 8/10/2005 | 8/10/2005 | 8/10/2005 | | DONE |
|
|
|
Drainage project found complete, no inspections requested. Signed permanent occupancy 8/10/05. G.Fitts
|
Code Occupancy Approval | 8/9/2005 | 8/9/2005 | 8/9/2005 | P | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF
|
BLD-Conference | 8/8/2005 | 8/8/2005 | 8/8/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/8/2005 at 8:49:08 AM. Contact: ###-####. Discussed Req for final.
|
BLD-Final | 6/17/2005 | 6/17/2005 | 6/17/2005 | P | CANC |
Jim Sly
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Inspection cancelled from web by: Marsha Smylie
|
BLD-Framing/Rough-in | 5/20/2005 | 5/23/2005 | 5/23/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/20/2005 at 3:05:25 PM. Contact: ###-####. Glenn Robnett Architect.... wants Grid design catagory C. 5/23/2005 10:13:05 AM
|
BLD-Framing/Rough-in | 5/23/2005 | 5/23/2005 | 5/23/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/23/2005 at 9:56:33 AM. Contact: ###-####. Grid OK...may check for spacer bars at final. 5/23/2005 3:44:32 PM
|
BLD-Other | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 2:50:12 PM. Contact: ###-####. Architect to verify ceiling grid standard (25-2) or Per 2000 UBC 803.8.1.1 ASTM 635 636. Plans are contradicting. 5/20/2005 4:08:36 PM
|
BLD-Conference | 5/13/2005 | 5/13/2005 | 5/13/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/13/2005 at 8:40:24 AM. Contact: ###-####. Grid above stage appears OK. 5/13/2005 1:49:45 PM
|
BLD-Framing/Rough-in | 4/25/2005 | 4/25/2005 | 4/26/2005 | P | PART |
Dave Hannah
|
|
|
inspect sheetrock shaft joist space area inside floor ok
|
BLD-Framing/Rough-in | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/22/2005 at 1:39:44 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/21/2005 | 4/21/2005 | 4/21/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 8:13:47 AM. Contact: ###-####. interior partition wall and shaft ok, informed contractor to complete rated assembly at joist space before sheetrocking lid 4/21/2005 4:03:16 PM
|
BLD-Framing/Rough-in | 3/2/2005 | 3/3/2005 | 3/3/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 1:04:35 PM. Contact: ###-####. roof sheathing nailing ok east entry area 3/3/2005 2:32:07 PM
|
BLD-Footing | 9/30/2004 | 10/1/2004 | 10/1/2004 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/30/2004 at 1:56:13 PM.
partial footings/ to receive MTI special insp. notes 10/1/2004 10:26:28 AM
|
(F) Reprint permit | | | 9/20/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/17/2004 | | DONE |
|
|
|
|
Routing - PLANNING | 7/22/2004 | | 7/23/2004 | | PASS |
|
|
|
|
Plan assigned to (MLO) | 4/14/2004 | | 7/23/2004 | | PASS |
Mike Otto
|
|
|
7/23/2004 13:25:38 MLO - activity updated through activity BLDA022 from case BLD04-00709.
|
Routing - FIRE | 7/23/2004 | | 7/23/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/23/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/23/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/23/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/23/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plan resubmittals received | | | 7/22/2004 | | DONE |
|
|
|
Received transmittal letter with three copies of revised sheet A1.0, one copy of united water fire flow sheet.taken to Mike O.
|
Routing - PLANNING | 4/26/2004 | | 7/21/2004 | | PASS |
|
|
|
Carl Miller CUP04-00029, Pending approval w/o appeal, May 13th
|
Meeting | | | 7/15/2004 | | DONE |
|
|
|
Met with Glenn Roginette, reviewed resubmittal plan deficiencies and requirements relating to FD access, hydrant flows, and fire sprinklers. Revised review comments were faxed to architect today, based on this discussion.
|
Routing - FIRE | 7/12/2004 | | 7/14/2004 | | FAIL |
|
|
|
resubmitted plans did not include a cover letter nor identify compliant FD access roadways. Set up meeting with architect to discuss tomorrow (7/15). No revision to previoulsy issued review comments will be made until after this meeting.
|
Routing - PLAN CHECK | 7/12/2004 | | 7/12/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/12/2004 | | DONE |
|
|
|
rec. three copies of sheets A2.4, A2.6 and A6.0
|
Routing Off Site - STRUCTURAL | 7/1/2004 | | 7/9/2004 | | PASS |
|
|
|
Called PDQ for pick-up...
|
Routing - PLAN CHECK | 6/24/2004 | | 7/2/2004 | | FAIL |
|
|
|
contacted architect regarding missing items. MLO
|
Plan resubmittals received | | | 6/23/2004 | | DONE |
|
|
|
Received Transmittal Letter, 3 Structural Calcs , 3 Sets with C1.0,C2.0 , C3.0 , C4.0, C5.0, A1.1, A2.0 , A2.1, A2.3, A2.6, A5.1, A7.0, S1.0, S2.0, S2.1, S2.2, S3.0, S3.1 Taken to Mike Otto
|
Meeting | | | 6/10/2004 | | DONE |
|
|
|
plans went to fire for meeting with architect. MLO
|
Meeting | | | 6/10/2004 | | DONE |
|
|
|
11:10am, met with Architect relating to address review in detail for:
FD required access for South side of this facility w/dimentioning
Access road load construction w/dimentioning
Hydrant and Fire Sprinkler Supply issues
Correlating plans (Architectural and Civil)
Plans taken back to "Plan Review" (JWA)
|
Plan Review Completed(1st rev) | | | 6/8/2004 | | DONE |
|
|
|
Failed:
Plan Check,
Fire,
Structural
|
Routing - PLAN CHECK | 6/8/2004 | | 6/8/2004 | | |
|
|
|
|
Routing - FIRE | 6/4/2004 | | 6/8/2004 | | FAIL |
Bill Alexander
|
|
|
Requires the following:
1. Provide the information required by the IBC Plan Reviewer, Mike Otto, specifically all items which relate with the IFC.
2. Fire Hydrants. Plan A1.1 requires correction to match civil drawings per relocated hydrant moved from the south side of the proposed structure.
3. Fire Department access. It appears that one existing fire hydrant located on the south side of this structure is located in an area where access does not meet IFC requirements, per these the plans provided. Provide an approved Fire Department vehicular access road/s provided to within 150'-0" of all exterior portions of this building or obtain written approval from the Fire Marshal that access is not required per IFC 503.1.1(1). Provide revised plans that clarify meeting minimum access requirements to the required south side hydrant and still maintaining limits to dead-ends or a required turnaround per IFC 503.1.1. Approval must be obtained in writing from the Fire Marshal of plan acceptance as shown.
4. Access Road Surfaces. Provide construction clarification of fire access road on A2.0. Fire apparatus access roadways shall be constructed and maintained as follows. Fire apparatus access roadways shall be concrete or paved surfaces, except as otherwise noted or approved, whose pavement section is constructed in accordance with ACHD standards. Fire apparatus access roadways constructed with alternative surfaces must meet the following criteria: (1) the roadway surface must structurally support 70,000 pounds gross vehicle weight and 24,000 pounds per axle; (2) the roadway surface must be visible to the driver, as must all signage as prescribed by the Fire Marshal; (3) the roadway surface must withstand the action of weather and the elements, as such, gravel, crushed rock or aggregate, or other loose fill, whether the fill is compacted or not, and turf block or grass-crete type products are not acceptable as a permanent fire apparatus access roadway; (4) fire department access roadways shall not be a combination of surface materials, such as paving strips with grass center lanes; (5) Fire access roadways shall be kept clear of snow, debris, and other obstructions; and (6) written approval must be obtained from the Boise City Fire Marshal prior to construction of fire apparatus access roadways with alternate surfaces. (BMC 7-01-28, 503.2.3) Note: All gates, public or private streets, individual or common driveways, or dedicated emergency vehicle access lanes, etc., which are considered "fire department access" shall be: a minimum of 20'-0" width, 48'-0" outside turning radius and 28'-0" inside radius, with 13 feet 6 inches overhead clearance, with no dead ends over 150 feet unless an approved turnaround is provided. (IFC 503)
5. Fire Hydrant/Fire Sprinkler Supplies. It is prohibited for underground water supply lines with a single point of connection to supply both fire hydrants and fire suppression systems. Looped supply lines that are supplied from two points of connection shall be allowed for hydrants and fire suppression system supplies. Provide correct clarification of water supply to the new fire sprinkler riser located on the East side of the structure on FP1.0. (BMC 7-01-46, 508.6)
|
Routing Off Site - STRUCTURAL | 4/14/2004 | | 6/4/2004 | | FAIL |
|
|
|
Contacted PDQ for outside delivery. corrections sent to architect
|
Routing - PLAN CHECK | 5/26/2004 | | 6/4/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 6/4/2004 | | DONE |
|
|
|
IBC and structural review corrections
|
Plan resubmittals received | | | 5/26/2004 | | DONE |
|
|
|
Received transmittal letter with one set of as build drawings, three sets of architectural drawings inserted by architect, taken Mike O.
|
Plan resubmittals requested | | | 5/18/2004 | | DONE |
|
|
|
IBC items, final building configuration required for review and original county approved copy required to complete review.
|
Routing - PLAN CHECK | 5/12/2004 | | 5/18/2004 | | HOLD |
|
|
|
went over corrections with architect on phone and faxed list to same. Plans are on hold until additional items are submitted. MLO
|
Routing - PLUMBING | 5/12/2004 | | 5/12/2004 | | PASS |
|
|
|
per plans and 2000 upc.
|
Telephone call | | | 5/3/2004 | | DONE |
|
|
|
telcom from Carl Geigher w/ EHM Engr's Re: United Water indication to him that the water system was not approved. 4 fire hydrants on this site; apparently private, not serviced or approved by United Water. I advised him of our requirement for FHs to be non-private and under control and maintenance of United Water. He will contact John Lee at United Water to determine more details of their requirements.
|
Routing - Erosion and Sediment | 4/26/2004 | | 4/26/2004 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - PUBLIC WORKS | 4/16/2004 | | 4/21/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 4/14/2004 | | 4/15/2004 | | PASS |
|
|
|
Site is over 5 acres in size.
|
Plans ACCEPTED BY PLAN TECH | | | 4/14/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 4/14/2004 | | DONE |
|
|
|
|
Application received | | | 4/9/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2004 | | |
|
|
|
|
Fee Review-notes | 4/9/2004 | 4/9/2004 | | | |
|
|
|
|
Routing - Erosion and Sediment | 4/21/2004 | | | | FAIL |
|
|
|
No RP listed on permit application.
|