BLD-Final | 9/27/2004 | 9/28/2004 | 9/28/2004 | P | PASS |
Jim Sly
|
|
|
###-#### - val C/C issued. 9/28/2004 2:33:34 PM
|
DOC - Permit Finaled | 9/28/2004 | 9/28/2004 | 9/28/2004 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 9/28/2004 2:33:40 PM
|
BLD-Wall cover | 9/23/2004 | 9/24/2004 | 9/24/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/23/2004 at 5:02:36 PM. Contact: ###-####. Added 1hr exterior walls (to complete Townh Req) Not met at frame insp. 9/24/2004 3:17:59 PM
|
BLD-Wall cover | 8/11/2004 | 8/12/2004 | 8/12/2004 | A | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 8/11/2004 at 5:45:31 PM. Contact: ###-####.
met w/ Val to discuss separation @ firewall issues. verified 4ft wrap back @ roof sheathing underside within house. need to complete extension beyond house envelope/common wall. 8/12/2004 9:41:07 AM
|
BLD-Wall cover | 8/6/2004 | 8/9/2004 | 8/9/2004 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/6/2004 at 1:05:15 PM. Contact: ###-####. Not built to townhouse specs.....Failed int breaches in 1hr walls generally in soffit areas and where range duct removed from walls. 8/9/2004 1:04:13 PM
|
BLD-Wall cover | 8/2/2004 | 8/3/2004 | 8/3/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/2/2004 at 12:49:02 PM. Contact: ###-####. Conf. Talked about Townhouse req. Not built to Townhouse specs....Retro fit for Townhouse specs. 8/3/2004 11:37:53 AM
|
BLD-Wall cover | 8/2/2004 | 8/3/2004 | 8/3/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/2/2004 at 12:49:02 PM. Contact: ###-####. Conf.....Talked about Townhouse wall Req. 8/3/2004 11:24:02 AM
|
BLD-Framing/Rough-in | 7/30/2004 | 7/30/2004 | 7/30/2004 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/30/2004 at 7:49:26 AM. Contact: ###-####. Inspection cancelled from web by: Aimee Hughes
|
BLD-Wall cover | 7/30/2004 | 7/30/2004 | 7/30/2004 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/30/2004 at 7:51:51 AM. Contact: ###-####. Inspection cancelled from web by: Aimee Hughes
|
Inspection Record Card- Bld | | | 7/27/2004 | | DONE |
|
|
|
|
BLD-Energy code compliance | 7/16/2004 | 7/16/2004 | 7/16/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/16/2004 at 8:09:59 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/12/2004 | 7/12/2004 | 7/12/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/12/2004 at 6:55:01 AM. Contact: ###-####. duplex only 7/12/2004 2:23:15 PM
|
BLD-Foundation | 5/13/2004 | 5/13/2004 | 5/13/2004 | P | PASS |
Jim Sly
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 5/12/2004 | 5/12/2004 | 5/12/2004 | P | PASS |
Jim Sly
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Behind Po Jo's 5/12/2004 2:13:42 PM
|
Issue PAID IN FULL permit | | | 4/30/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/23/2004 | | |
|
|
|
|
Plan Review Report | | | 4/23/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/23/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/23/2004 | | DONE |
|
|
|
|
Telephone call | | | 4/23/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 4/20/2004 | | 4/23/2004 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 4/22/2004 | | 4/23/2004 | | PASS |
Steve Munroe
|
|
|
4/23/2004 13:18:07 SAM - activity updated through activity BLDA022 from case BLD04-00710.
|
Plan Reviewer's activity | | | 4/22/2004 | | DONE |
|
|
|
4/22/04 14:15 I called and talked to Val. I let him know that I need a separation wall detail. Plans on hold till I get that.
|
Pending Assignment by DJO | 4/12/2004 | | 4/22/2004 | | DONE |
Dan Overy
|
|
|
4/22/2004 11:44:43 SAM - activity updated through activity BLDA183 from case BLD04-00710.
|
Routing - PUBLIC WORKS | 4/16/2004 | | 4/20/2004 | | PASS |
|
|
|
WESTBOISE SEWER DISTRICT
|
Routing - PLANNING | 4/14/2004 | | 4/14/2004 | | PASS |
|
|
|
The driveway for the west duplex needs to be realigned to allow 5-feet of landscaping as noted on plans, or shift both dwellings east to accommodate landscaping. Duplex approved per CAA04-0029.
|
Routing - PLANNING Land Div | 4/12/2004 | | 4/13/2004 | | PASS |
|
|
|
Approved. Parcel "F" on ROS 6328.
|
Application received | | | 4/12/2004 | | |
|
|
|
|