Third Notice BLD | 5/20/2005 | 5/20/2005 | 11/1/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/18/2005 | 4/26/2005 | | DONE |
|
|
|
|
BLD-Final | 3/17/2005 | 3/18/2005 | 3/18/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/17/2005 at 12:18:46 PM. Contact: ###-####. ok for perm 3/18/2005 9:42:02 AM
|
Permanent Occupancy | | 3/18/2005 | 3/18/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 3/18/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10502 issued 3-18-05 to RMF, Inc.
|
FIRE-Final Inspection | 3/16/2005 | 3/16/2005 | 3/16/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 3/16/2005 4:55:00 PM
|
BLD-Framing/Rough-in | 2/8/2005 | 2/8/2005 | 2/8/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/8/2005 at 8:04:55 AM. Contact: ###-####.
|
BLD-Aging Inspection | 12/23/2004 | 12/23/2004 | 12/23/2004 | | NR |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 9/23/2004 | | DONE |
|
|
|
|
OVERRIDE | | | 9/22/2004 | | |
|
|
|
|
Override - People Holds | | | 9/22/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/22/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/22/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2004 | | PASS |
|
|
|
Ready to process for issuing.
|
Override - People Holds | | | 9/22/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 9/22/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/22/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (DRS) | 4/16/2004 | | 9/22/2004 | | PASS |
Dan Stuart
|
|
|
9/22/2004 07:54:49 DRS - activity updated through activity BLDA022 from case BLD04-00717.
|
Routing - PLAN CHECK | 9/21/2004 | | 9/22/2004 | | PASS |
|
|
|
Ready to take to permit desk for issue.
|
Routing - FIRE | 9/15/2004 | | 9/21/2004 | | PASS |
|
|
|
Resubmittal acceptable.
|
Received Certificate of Value | | | 9/15/2004 | | DONE |
|
|
|
Received new C.V. from architect to address aditional work to be done.
|
Routing - PLAN CHECK | 9/1/2004 | | 9/15/2004 | | PEND |
|
|
|
Received further clarification & plan sheet A2.00 from architect. Still missing updated CV for new values to include electrical & plumbing. Architect will provide ASAP. Routing to fire code analyst for re-review.
|
Plan resubmittals received | | | 9/14/2004 | | |
|
|
|
Received Transmittal Letter, & 2 copys of A2.00 Taken to Dan S. ....
|
Plan resubmittals received | | | 9/3/2004 | | DONE |
|
|
|
Received Transmittal Letter & Memorandum Letter...Taken to Dan S.
|
Routing - PLAN CHECK | 5/20/2004 | | 9/1/2004 | | FAIL |
|
|
|
Received resubmittals from architect on 8/31/04 & inserted into plans this day. New Sheet A2.0 & first time mechancal sheets. Resubmittals were incomplete as the hazardous materials used and or stored were not addressed as part of resubmittals and the mechanical ventilation for the enclosed parking garage was not addressed. I talked with the architect, Dave Blodgett concerning these items and he had not addressed the haz mat question yet and he thought the original enclosed parking garage was possibly going to be storage only (not vehicles). The repair garage area had a mechanical plan but it was unclear as what events triggered the use of the systems specified, i.e. does the activation of the CO sensor activate the exhaust which activates the fresh air unit which will activate the new overhead gas heat unit when temperature of the habitable space drops below 50 degrees? I told Dave Blogettall items need to be considered and clearly addressed and the proposed occupancy uses groups needed to be clearly addressed so there woud be no misunderstanding as to code requirements applicable to the project.
|
Plan resubmittals received | | | 8/31/2004 | | DONE |
|
|
|
Received response letter with three sets of sheets A2.00,EN1.0,M0.0,MO.1,M1.0,taken to Dan S.
|
Telephone call | | | 7/1/2004 | | DONE |
|
|
|
Called back Owen Tennison, Elkhorn Engineering, concerning this project and plan review comments faxed and mailed to David Blodgett on 5/17/04 concerning plan resubmittals providing mechancial design data and required equipment, if any needing to be added to the building for the proposed new occupancy uses' for this portion of the existing building. Owen wanted to verify what I was requiring. I ask him to read the code sections referenced and provide evaluation and evidience of compliance with code and show what was needed in design details or table or both to clearly indicate requirements. this information would be used by the mechanical field inspector to verify compliance with code in the field.He said he would clarify what he would need to do with the architect and provide said documentation and details accordingly if approved by the design professional.
|
Routing - FIRE | 5/17/2004 | | 5/20/2004 | | FAIL |
|
|
|
Need Haz Mat info; review comments faxed to architect.
|
Plan resubmittals requested | | | 5/17/2004 | | FAIL |
|
|
|
Copy of plan review faxed and mailed to David Blodgett, architect.
|
Routing - PLAN CHECK | 4/21/2004 | | 5/17/2004 | | FAIL |
|
|
|
Resubmittals required. Copy of review to David Blodgett. Routing to fire code analyst while waiting for response.
|
Routing - PUBLIC WORKS | 4/16/2004 | | 4/20/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 4/20/2004 | | 4/20/2004 | | PASS |
|
|
|
Approved per building permit plans.
|
Plans ACCEPTED BY PLAN TECH | | | 4/15/2004 | | DONE |
|
|
|
<$1000.0
|
Application received | | | 4/12/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/12/2004 | | |
|
|
|
|
Fee Review-notes | 9/22/2004 | 9/22/2004 | | | |
|
|
|
|
Fee Review-notes | 4/12/2004 | 4/12/2004 | | | |
|
|
|
|