Permit Information
Permit NumberBLD04-00725
StatusFinaled
Name STEED CONSTRUCTION
Site Address 123 S AUTO DR
Project NameCALVARY CHAPEL SANCTUARY
Customer Number 
ePlanReviewNo
Description
(CALVARY CHAPEL - SANCTUARY EXPANSION) (1-11-06) PLAN MODIFICATION TO REFLECT THE WORK THAT WAS ACTUALLY DONE. (8-5-05) PLAN MODIFICATION FOR NONRATED STAIRWAY AND STRUCTURAL CHANGES TO THE BALCONY. This building is fire sprinklered for area increase, story increase, and fire area. To expand the 2nd floor seating area of the existing Sanctuary by about 2,183 square feet (176 seats). After the expansion the 2nd floor seating area within the sanctuary will have a floor area of about 3,844 square feet and an occupant load of about 282, based on fixed seats. Work is to include 2 new egress stairways. The 2nd floor expansion includes concrete footings, steel columns, steel beams, wood floor joists, and wood floor sheathing. Work is to include concrete footings, masonry walls, EIFS, windows, roof trusses, roof sheathing, and roof coverings. All work shall comply with the approved drawings and the plan review report on file. Within the expansion areas, the fire sprinkler system shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/27/2014 DONE
Case Summary (BLD)  11/17/2009 DONE
Second Notice BLD3/15/20063/15/20063/23/2006 DONE
First Notice has not been responded to.
First Notice 2/22/20063/15/2006 DONE
Permanent occupancy  2/22/2006 DONE
Perm. Occ. Cert. # 10912 issued 2-22-06 to Calvary Chapel for the sanctuary expansion portion.
BLD-Final2/16/20062/16/20062/16/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/16/2006 at 7:50:37 AM. Contact: ###-####. ok for perm occ.
FIRE-Final Inspection2/15/20062/15/20062/15/2006PPASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Alarm Testing2/6/20062/6/20062/6/2006PPASS
DetailsTroy Cobbley
fire alarm permit passed
FIRE-Final Inspection2/6/20062/6/20062/6/2006PFAIL
DetailsTroy Cobbley
provide occupancy load signs
BLD-Other2/1/20062/1/20062/1/2006ADONE
DetailsMike Jordan
Informed bldg occupant has 24hrs to remove temp. structure at south exit of main bldg.
Permanent Occupancy 2/1/20062/1/2006 DONE
Details
CHANGE STATUS TO (ISS)  1/27/2006 DONE
OVERRIDE  1/13/2006  
Routing - PLANNING1/11/2006 1/13/2006 PASS
Approved per CZC.
PLANS/APPL TAKEN TO FRONT DESK  1/13/2006 DONE
Permit Ready to Issue  1/13/2006  
BLD-Other1/11/20061/11/20061/11/2006ADONE
DetailsMike Jordan
Plastic has been removed from outside of sanctuary addition. 180 day temp use granted for tent. Noted that plans are being redrawn for tent removal and addition of walls. Contractor to reschedule fire inspections, contractor says repairs have been made.
Plan Modification Accepted  1/11/2006 DONE
Drawings showing what was actually constructed were submitted.
Routing - PLAN CHECK12/27/2005 1/11/2006 PASS
Modified drawings approved.
Plan resubmittals received  12/27/2005 DONE
PLAN RESUBMITTALS RECEIVED AFTER PERMIT ISSUANCE. Cover transmittal memo from Wayne Thowless and 3 copies of plan sheets A-1.1, A-3.2, A-3.3, A-3.4 and A-5.1 received and forwarded to Carl Westfall.
BLD-Other11/4/200511/4/200511/4/2005PFAIL
DetailsTom Arcoraci
cn issued no occupancy until final
FIRE-Final Inspection11/2/200511/3/200511/3/2005AFAIL
DetailsTroy Cobbley
No inspection done due to the fire alarm being failed and building issues noted. The building issues noted include tenting/canopy materials enclosing the south canopy. This area is shown on the building plans as being enclosed with walls. A permit is needed for the canopy and the two heaters, bbq and the space LP tanks removed. Plans need to be resubmitted to show this work removed or the work needs to be completed. A ceiling needs to be installed in the fire sprinkler riser room to cover the exposed cpvc sprinkler piping. The accelerator on the dry pipe valve has a sign stating the it does not work and the trim valves to it are closed. This device needs to be repaired.
BLD-Final11/2/200511/3/200511/3/2005PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/2/2005 at 3:14:43 PM. Contact: ###-####.
BLD-Aging Inspection10/13/200510/13/200510/13/2005 NR
DetailsTom Arcoraci
BLD-Framing/Rough-in8/5/20058/8/20058/8/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/5/2005 at 2:28:39 PM. Contact: ###-####.
Routing - PLAN CHECK7/21/2005 8/5/2005 PASS
Approved modification
PLANS/APPL TAKEN TO FRONT DESK  8/5/2005 DONE
Modified drawings taken to the permits desk.
Permit Ready to Issue  8/5/2005 DONE
Inspection Record Card- Bld  8/5/2005 DONE
Print Occupancy Form  8/5/2005 DONE
Telephone call  8/5/2005 DONE
Spoke with Roy and told him that permit is ready & fees///8/5/05 10:00am BAS
Case Summary (BLD)  8/5/2005 DONE
(F) Reprint permit  8/5/2005 DONE
CHANGE STATUS TO (ISS)  8/5/2005 DONE
re-submital re-issued///85/05 BAS
Plan Modification Accepted  7/26/2005  
Plan modification accepted for bld04-00725 for redesign. Retention of exsiting prayer room in lieu of conversion to seating alcove; elimination of one balcony column at each new balcony with associated beam change; retention of existing tube steel frame and CMU wall on west side of west balcony; stair 128 changes; minor / incidental HVAC changes. (3) copies of sheet A-1.1, A-1.3, A-2.1, A-3.1, A-3.2, A-3.3, A-3.4, A-4.1, A-6.1, A-7.1, A-7.5, A-8.2 and A-8.3 submitted. Routed to Carl W.
BLD-Footing6/14/20056/17/20056/17/2005APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/14/2005 at 3:25:21 PM. Contact: ###-####. spec insp on site
Issue PAID IN FULL permit  4/5/2005  
Permit Ready to Issue  3/31/2005  
Inspection Record Card- Bld  3/31/2005  
Print Occupancy Form  3/31/2005  
Telephone call  3/31/2005 DONE
called steve carlson at ###-#### that permit is ready & need achd
Routing - PLAN CHECK9/8/2004 3/30/2005 DONE
On hold at Carl Westfall's desk until alarm application is received. Once alarm application is received, this permit can be issued.

(3-17-05) Completed resubmittal review. Approved the drawings. The elevator is being deleted and the 2 proposed stairways are being moved inside the building envelope. The fire alarm plans must be submitted before this permit can be issued.

(3-30-05) Alarm application was submitted. This project was cleared for issuance.
Plan assigned to (CJW)4/15/2004 3/30/2005 PASS
DetailsCarl Westfall
3/30/2005 13:08:32 CJW - activity updated through activity BLDA022 from case BLD04-00725.
PLANS/APPL TAKEN TO FRONT DESK  3/30/2005 DONE
Plan resubmittals received  3/2/2005 DONE
3 copies of sheets A-0, S-1.1, S-1.4, L-1.1, L-1.4, A-1.1, A-1.2, A-1.3, A-2.1, A-3.1, A-3.2, A-3.3, A-3.4, A-3.5, A-4.1, A-5.1, A-6.1, A-6.2, A-7.1, A-7.4, A-7.5, A-7.6, A-8.1, A-8.2, A-10.1, A-10.2, M-0.1, M-1.1, M-2.1, M-3.1, M-4.1, M-5.1, M-6.1, M-7.1, M-8.1, E-1, E-2, E-3, E-3.1 and E-4 and routed to Carl Westfall.
Plan Reviewer's activity  12/21/2004 DONE
An extension was approved by Jenifer Gilliland. The extensions expires on April 7, 2005. See letter on file.
Routing Off Site - STRUCTURAL8/30/2004 9/8/2004 PASS
Passed 4th Consultant Engineer's review. Called PDQ for pick-up
Routing - PLAN CHECK5/6/2004 9/8/2004 PASS
Drawings approved after resubmittal reviews.
Routing Off Site - STRUCTURAL8/4/2004 8/18/2004  
Failed 3rd Consultant Engineer's review. Contacted PDQ for outside engineering.
Meeting  8/6/2004 DONE
Carl J. Westfall and Mary Fromenke met with a representative of the contractor. The Church will provide a letter stating their intent to wait to take out this permit until they have sufficient funds to do the project. This permit shall NOT be issued until a fire alarm permit application with plans is submitted that reflects the Sanctuary expansion.
Plan resubmittals received  8/4/2004 DONE
Received transmittal letter with one copy of supplemental structural calculations, two copies of structural responses, one additional sets of sheets A-7.1,A-7.2,A-7.3 taken to Carl W.
Plan resubmittals received  8/3/2004 DONE
Received Transmittal Letter, 2 Structural Responses, 2 Sets of A-7.1,A-7.2,A-7.3 Taken to Carl Westfall...
Routing Off Site - STRUCTURAL6/24/2004 7/9/2004  
Failed 2nd Consultant Engineer's review. Contacted PDQ for ouside delivery for engineering. Failed 2nd review.
Plan Reviewer's activity  7/9/2004 DONE
E-mailed a copy of the consultant engineer's 2nd plan review to Wayne Thowless.
Plan resubmittals received  6/29/2004 DONE
Received Transmittal Letter, 1Set of M-4.1 Taken to Cail Westfall...
Plan resubmittals received  6/24/2004 DONE
Received transmittal letter with one sets of sheets A-1.2,A-3.5,A-6.2,A-7.1,A-7.2,A-7.3,A-7.7,A-8.2,A-8.3,M-7.1,M-4.1, taken to Carl W.
Plan resubmittals received  6/18/2004 DONE
Received letter of transmittal, response to structural comments,two copies of supplemental structural calculations, two sets of sheets A-1.2,A-3.5,A-6.2,A-7.1,A-7.2,A-7.3,A-7.7,A-8.2,A-8.3,M-7.1,M-4.1 Taken to Carl W.
Routing - FIRE5/3/2004 5/6/2004 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  5/6/2004 DONE
Routing - PLAN CHECK4/26/2004 5/3/2004  
Failed 1st IBC plan review. IBC plan review was started April 27, 2004 and was finished May 3, 2004. A response from the architect and the structural engineer was required. See the plan review report. A copy was E-mailed to the architect.
Routing - PLUMBING4/23/2004 4/26/2004 PASS
Routing - PLANNING4/20/2004 4/23/2004 PASS
OK per CUP03-00063 Mark Pecchenino and per DRH03-134 Tempra Wilson DRH03-00134 on 4/23/2004.
Routing Off Site - STRUCTURAL4/15/2004 4/21/2004  
Failed 1st Consultant Engineer's review. Contacted PDQ for ouside delivery for engineering. Failed by consultant structural engineer.
Routing - Erosion and Sediment4/19/2004 4/20/2004 PASS
ESC approved with conditons attached to plans.
Routing - PUBLIC WORKS4/16/2004 4/19/2004 PASS
Routing - PLANNING Land Div4/15/2004 4/16/2004 PASS
Site is over 5 acres in size.
Plans ACCEPTED BY PLAN TECH  4/15/2004 DONE
No O&M manual per Brian Murphy. kmm
Plan routing begun/NEW & ADDTN  4/15/2004 DONE
Application received  4/12/2004  
Recd Pcfee & Taken To Pln CK  4/12/2004  
Fee Review-notes4/12/20044/12/2004   
this is fire, make sure value is part of total project value
Routing - PLAN CHECK1/13/2006