Case Summary (BLD) | | | 1/27/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/17/2009 | | DONE |
|
|
|
|
Second Notice BLD | 3/15/2006 | 3/15/2006 | 3/23/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/22/2006 | 3/15/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 2/22/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10912 issued 2-22-06 to Calvary Chapel for the sanctuary expansion portion.
|
BLD-Final | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/16/2006 at 7:50:37 AM. Contact: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 2/15/2006 | 2/15/2006 | 2/15/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Alarm Testing | 2/6/2006 | 2/6/2006 | 2/6/2006 | P | PASS |
Troy Cobbley
|
|
|
fire alarm permit passed
|
FIRE-Final Inspection | 2/6/2006 | 2/6/2006 | 2/6/2006 | P | FAIL |
Troy Cobbley
|
|
|
provide occupancy load signs
|
BLD-Other | 2/1/2006 | 2/1/2006 | 2/1/2006 | A | DONE |
Mike Jordan
|
|
|
Informed bldg occupant has 24hrs to remove temp. structure at south exit of main bldg.
|
Permanent Occupancy | | 2/1/2006 | 2/1/2006 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/27/2006 | | DONE |
|
|
|
|
OVERRIDE | | | 1/13/2006 | | |
|
|
|
|
Routing - PLANNING | 1/11/2006 | | 1/13/2006 | | PASS |
|
|
|
Approved per CZC.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/13/2006 | | |
|
|
|
|
BLD-Other | 1/11/2006 | 1/11/2006 | 1/11/2006 | A | DONE |
Mike Jordan
|
|
|
Plastic has been removed from outside of sanctuary addition. 180 day temp use granted for tent. Noted that plans are being redrawn for tent removal and addition of walls. Contractor to reschedule fire inspections, contractor says repairs have been made.
|
Plan Modification Accepted | | | 1/11/2006 | | DONE |
|
|
|
Drawings showing what was actually constructed were submitted.
|
Routing - PLAN CHECK | 12/27/2005 | | 1/11/2006 | | PASS |
|
|
|
Modified drawings approved.
|
Plan resubmittals received | | | 12/27/2005 | | DONE |
|
|
|
PLAN RESUBMITTALS RECEIVED AFTER PERMIT ISSUANCE. Cover transmittal memo from Wayne Thowless and 3 copies of plan sheets A-1.1, A-3.2, A-3.3, A-3.4 and A-5.1 received and forwarded to Carl Westfall.
|
BLD-Other | 11/4/2005 | 11/4/2005 | 11/4/2005 | P | FAIL |
Tom Arcoraci
|
|
|
cn issued no occupancy until final
|
FIRE-Final Inspection | 11/2/2005 | 11/3/2005 | 11/3/2005 | A | FAIL |
Troy Cobbley
|
|
|
No inspection done due to the fire alarm being failed and building issues noted. The building issues noted include tenting/canopy materials enclosing the south canopy. This area is shown on the building plans as being enclosed with walls. A permit is needed for the canopy and the two heaters, bbq and the space LP tanks removed. Plans need to be resubmitted to show this work removed or the work needs to be completed. A ceiling needs to be installed in the fire sprinkler riser room to cover the exposed cpvc sprinkler piping. The accelerator on the dry pipe valve has a sign stating the it does not work and the trim valves to it are closed. This device needs to be repaired.
|
BLD-Final | 11/2/2005 | 11/3/2005 | 11/3/2005 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/2/2005 at 3:14:43 PM. Contact: ###-####.
|
BLD-Aging Inspection | 10/13/2005 | 10/13/2005 | 10/13/2005 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 8/5/2005 | 8/8/2005 | 8/8/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/5/2005 at 2:28:39 PM. Contact: ###-####.
|
Routing - PLAN CHECK | 7/21/2005 | | 8/5/2005 | | PASS |
|
|
|
Approved modification
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2005 | | DONE |
|
|
|
Modified drawings taken to the permits desk.
|
Permit Ready to Issue | | | 8/5/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/5/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/5/2005 | | DONE |
|
|
|
Spoke with Roy and told him that permit is ready & fees///8/5/05 10:00am BAS
|
Case Summary (BLD) | | | 8/5/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/5/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/5/2005 | | DONE |
|
|
|
re-submital re-issued///85/05 BAS
|
Plan Modification Accepted | | | 7/26/2005 | | |
|
|
|
Plan modification accepted for bld04-00725 for redesign. Retention of exsiting prayer room in lieu of conversion to seating alcove; elimination of one balcony column at each new balcony with associated beam change; retention of existing tube steel frame and CMU wall on west side of west balcony; stair 128 changes; minor / incidental HVAC changes. (3) copies of sheet A-1.1, A-1.3, A-2.1, A-3.1, A-3.2, A-3.3, A-3.4, A-4.1, A-6.1, A-7.1, A-7.5, A-8.2 and A-8.3 submitted. Routed to Carl W.
|
BLD-Footing | 6/14/2005 | 6/17/2005 | 6/17/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/14/2005 at 3:25:21 PM. Contact: ###-####. spec insp on site
|
Issue PAID IN FULL permit | | | 4/5/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 3/31/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/31/2005 | | |
|
|
|
|
Print Occupancy Form | | | 3/31/2005 | | |
|
|
|
|
Telephone call | | | 3/31/2005 | | DONE |
|
|
|
called steve carlson at ###-#### that permit is ready & need achd
|
Routing - PLAN CHECK | 9/8/2004 | | 3/30/2005 | | DONE |
|
|
|
On hold at Carl Westfall's desk until alarm application is received. Once alarm application is received, this permit can be issued.
(3-17-05) Completed resubmittal review. Approved the drawings. The elevator is being deleted and the 2 proposed stairways are being moved inside the building envelope. The fire alarm plans must be submitted before this permit can be issued.
(3-30-05) Alarm application was submitted. This project was cleared for issuance.
|
Plan assigned to (CJW) | 4/15/2004 | | 3/30/2005 | | PASS |
Carl Westfall
|
|
|
3/30/2005 13:08:32 CJW - activity updated through activity BLDA022 from case BLD04-00725.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/30/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/2/2005 | | DONE |
|
|
|
3 copies of sheets A-0, S-1.1, S-1.4, L-1.1, L-1.4, A-1.1, A-1.2, A-1.3, A-2.1, A-3.1, A-3.2, A-3.3, A-3.4, A-3.5, A-4.1, A-5.1, A-6.1, A-6.2, A-7.1, A-7.4, A-7.5, A-7.6, A-8.1, A-8.2, A-10.1, A-10.2, M-0.1, M-1.1, M-2.1, M-3.1, M-4.1, M-5.1, M-6.1, M-7.1, M-8.1, E-1, E-2, E-3, E-3.1 and E-4 and routed to Carl Westfall.
|
Plan Reviewer's activity | | | 12/21/2004 | | DONE |
|
|
|
An extension was approved by Jenifer Gilliland. The extensions expires on April 7, 2005. See letter on file.
|
Routing Off Site - STRUCTURAL | 8/30/2004 | | 9/8/2004 | | PASS |
|
|
|
Passed 4th Consultant Engineer's review. Called PDQ for pick-up
|
Routing - PLAN CHECK | 5/6/2004 | | 9/8/2004 | | PASS |
|
|
|
Drawings approved after resubmittal reviews.
|
Routing Off Site - STRUCTURAL | 8/4/2004 | | 8/18/2004 | | |
|
|
|
Failed 3rd Consultant Engineer's review. Contacted PDQ for outside engineering.
|
Meeting | | | 8/6/2004 | | DONE |
|
|
|
Carl J. Westfall and Mary Fromenke met with a representative of the contractor. The Church will provide a letter stating their intent to wait to take out this permit until they have sufficient funds to do the project. This permit shall NOT be issued until a fire alarm permit application with plans is submitted that reflects the Sanctuary expansion.
|
Plan resubmittals received | | | 8/4/2004 | | DONE |
|
|
|
Received transmittal letter with one copy of supplemental structural calculations, two copies of structural responses, one additional sets of sheets A-7.1,A-7.2,A-7.3 taken to Carl W.
|
Plan resubmittals received | | | 8/3/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 Structural Responses, 2 Sets of A-7.1,A-7.2,A-7.3 Taken to Carl Westfall...
|
Routing Off Site - STRUCTURAL | 6/24/2004 | | 7/9/2004 | | |
|
|
|
Failed 2nd Consultant Engineer's review. Contacted PDQ for ouside delivery for engineering. Failed 2nd review.
|
Plan Reviewer's activity | | | 7/9/2004 | | DONE |
|
|
|
E-mailed a copy of the consultant engineer's 2nd plan review to Wayne Thowless.
|
Plan resubmittals received | | | 6/29/2004 | | DONE |
|
|
|
Received Transmittal Letter, 1Set of M-4.1 Taken to Cail Westfall...
|
Plan resubmittals received | | | 6/24/2004 | | DONE |
|
|
|
Received transmittal letter with one sets of sheets A-1.2,A-3.5,A-6.2,A-7.1,A-7.2,A-7.3,A-7.7,A-8.2,A-8.3,M-7.1,M-4.1, taken to Carl W.
|
Plan resubmittals received | | | 6/18/2004 | | DONE |
|
|
|
Received letter of transmittal, response to structural comments,two copies of supplemental structural calculations, two sets of sheets A-1.2,A-3.5,A-6.2,A-7.1,A-7.2,A-7.3,A-7.7,A-8.2,A-8.3,M-7.1,M-4.1 Taken to Carl W.
|
Routing - FIRE | 5/3/2004 | | 5/6/2004 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 5/6/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/26/2004 | | 5/3/2004 | | |
|
|
|
Failed 1st IBC plan review. IBC plan review was started April 27, 2004 and was finished May 3, 2004. A response from the architect and the structural engineer was required. See the plan review report. A copy was E-mailed to the architect.
|
Routing - PLUMBING | 4/23/2004 | | 4/26/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 4/20/2004 | | 4/23/2004 | | PASS |
|
|
|
OK per CUP03-00063 Mark Pecchenino and per DRH03-134 Tempra Wilson DRH03-00134 on 4/23/2004.
|
Routing Off Site - STRUCTURAL | 4/15/2004 | | 4/21/2004 | | |
|
|
|
Failed 1st Consultant Engineer's review. Contacted PDQ for ouside delivery for engineering. Failed by consultant structural engineer.
|
Routing - Erosion and Sediment | 4/19/2004 | | 4/20/2004 | | PASS |
|
|
|
ESC approved with conditons attached to plans.
|
Routing - PUBLIC WORKS | 4/16/2004 | | 4/19/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 4/15/2004 | | 4/16/2004 | | PASS |
|
|
|
Site is over 5 acres in size.
|
Plans ACCEPTED BY PLAN TECH | | | 4/15/2004 | | DONE |
|
|
|
No O&M manual per Brian Murphy. kmm
|
Plan routing begun/NEW & ADDTN | | | 4/15/2004 | | DONE |
|
|
|
|
Application received | | | 4/12/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/12/2004 | | |
|
|
|
|
Fee Review-notes | 4/12/2004 | 4/12/2004 | | | |
|
|
|
this is fire, make sure value is part of total project value
|
Routing - PLAN CHECK | 1/13/2006 | | | | |
|
|
|
|