Third Notice BLD | 12/7/2005 | 12/7/2005 | 12/23/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice | | 5/20/2005 | 12/7/2005 | | DONE |
|
|
|
|
First Notice | | 4/15/2005 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/15/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10524 issued 4-13-05 to Garry's Automotive.
|
Permanent Occupancy | | 4/13/2005 | 4/13/2005 | | DONE |
|
|
|
|
Code Occupancy Approval | 4/13/2005 | 4/13/2005 | 4/13/2005 | A | PASS |
Scott M.Brown
|
|
|
DUMPSTER SCREENING AND LANDSCAPE DONE FINAL SIGNED OFF 4/13/2005 9:08:54 AM
|
FIRE-Final Inspection | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled
|
BLD-Final | 4/6/2005 | 4/7/2005 | 4/7/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/6/2005 at 9:02:01 PM. Contact: ###-####. ok for perm occ 4/7/2005 2:23:45 PM
|
Temporary occupancy | | | 3/4/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5217 issued 3-4-05 to Garry's Automotive.
|
FIRE-Final Inspection | 2/24/2005 | 2/25/2005 | 2/25/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide address facing cole road. Provide fire extinguishers per review comments. Provide exit discharge lighting at north exit per plans 2/25/2005 8:42:53 AM
|
BLD-Final | 2/24/2005 | 2/25/2005 | 2/25/2005 | P | PART |
Lane Manuel
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
temp. c of o ok.
need grippable handrails 2/25/2005 2:45:25 PM
|
FIRE-Final Inspection | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until I'm provided with the outdoor list for the discharge light or the light is changed to an outdoor listed. 2/25/2005 1:40:10 PM
|
Code Occupancy Approval Temp | 2/24/2005 | 2/24/2005 | 2/24/2005 | P | FAIL |
Scott M.Brown
|
|
|
NEED TO BOND FOR $1000.00 FOR LANDSCAPE 2/24/2005 2:49:53 PM
|
PubWorks Occupancy Approval | 2/14/2005 | 2/14/2005 | 2/14/2005 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 2/14/05. S.Landaluce
|
BLD-Energy code compliance | 1/18/2005 | 1/19/2005 | 1/19/2005 | P | PASS |
Lane Manuel
|
|
|
kameron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Wall cover | 1/17/2005 | 1/18/2005 | 1/18/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/17/2005 at 11:33:43 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/17/2005 | 1/18/2005 | 1/18/2005 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/17/2005 at 11:35:20 AM. Contact: ###-####.
ok to rock mezzanine area 1/18/2005 4:18:08 PM
|
BLD-Framing/Rough-in | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | PART |
Lane Manuel
|
|
|
cameron ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
gave tentative approval to contractor to cover ceiling (pending plumb. insp. approval) 1/12/2005 3:33:07 PM
|
BLD-Framing/Rough-in | 12/3/2004 | 12/6/2004 | 12/6/2004 | A | PART |
Lane Manuel
|
|
|
Camron -Roof sheeting; Phone #: ###-#### Internet Inspection Request from: Jan Rice
roof nailing ok.
recheck connections for roof trusses
12/6/2004 10:51:16 AM
|
BLD-Foundation | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/24/2004 at 8:09:17 AM. Contact: ###-####.
stemwalls ok. to recall for 6" slab doweled into stem's 9/24/2004 2:16:39 PM
|
BLD-Footing | 9/21/2004 | 9/21/2004 | 9/21/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/21/2004 at 7:01:06 AM. Contact: ###-####.
footings @ perimeter of bldg ok.
copper electrode ok 9/21/2004 2:25:19 PM
|
(F) Reprint permit | | | 9/3/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/2/2004 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2004 | | DONE |
|
|
|
Spoke with Cameron and told him that permit is ready & fees///8/30/04 9:30am BAM
|
Routing - PLAN CHECK | 8/24/2004 | | 8/27/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/2004 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/27/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/27/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/27/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/27/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/27/2004 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 4/20/2004 | | 8/27/2004 | | PASS |
Mike Phillips
|
|
|
8/27/2004 11:55:43 M_P - activity updated through activity BLDA022 from case BLD04-00789.
|
Routing - PLAN CHECK | 8/11/2004 | | 8/24/2004 | | PEND |
|
|
|
8/24/04 - Waiting for alternate to be approved and signed by Jenifer Gilliland.
|
Routing - PLUMBING | 8/10/2004 | | 8/11/2004 | | PASS |
|
|
|
1. intercepter drain to main sewer needs a cleanout and a vent. the vent shall not conect with the flamable liquids vents. 2. water heater needs drain pan with drain to approved location. 3. water service to buildings needs double check valve assy and an expansion tank.
|
Routing - PUBLIC WORKS | 8/5/2004 | | 8/10/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/9/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 Sets of E1 Taken to Mike Phillips.....
|
Routing - PLAN CHECK | 7/19/2004 | | 8/5/2004 | | |
|
|
|
Meeting held with architect and builder to discuss energy items. Resubmittal plans inserted in plans and as of this date plans are being rerouted to Public Works and Plumbing.
|
Plan resubmittals received | | | 8/5/2004 | | DONE |
|
|
|
Received 2 copys of sheets A3,A4,A5,A7 Taken to Mike Phillips....
|
Routing Off Site - STRUCTURAL | 7/14/2004 | | 7/20/2004 | | PASS |
|
|
|
Called PDQ for pick -up
Routed strructural plans and calculations to outside engineering firm.
|
Routing - FIRE | 7/19/2004 | | 7/14/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 5/25/2004 | | 7/14/2004 | | FAIL |
|
|
|
Second review failed sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 7/13/2004 | | DONE |
|
|
|
Received response letter, commercial insulated doors info, four copies of letters, inventory list, united water sheet, mechanical review comments list, 90.1 (89)code lighting compliance certificate, cooper lighting sheets, valley engineering responses, three sets of sheets S-1S-2,S-4,A1,A3,A4,A7,E1,E2,P1,P2,P3, all taken to Mike
|
Routing - FIRE | 5/20/2004 | | 5/25/2004 | | FAIL |
|
|
|
Hydrant flow and haz mat info reuqired. Review faxed to applicant as no address or fax number were provided for architect who could not be contacted via the phone number indicated.
|
Plan Review Completed(1st rev) | | | 5/25/2004 | | FAIL |
|
|
|
Failed in Structural, Public Works, Plumbing, Building Plan Review, Fire.
|
Routing Off Site - STRUCTURAL | 4/20/2004 | | 5/20/2004 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engeering.
Additional information required for further review.
|
Routing - PLAN CHECK | 5/12/2004 | | 5/20/2004 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing - PLUMBING | 5/12/2004 | | 5/12/2004 | | FAIL |
|
|
|
1. need plumbing drawings 2. where is grease and oil and gas going when on floor?
|
Routing - Erosion and Sediment | 5/10/2004 | | 5/11/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING | 5/11/2004 | | 5/11/2004 | | PASS |
|
|
|
DRH04-00043 Sarah Schafer
Approved per DRH04-43 and as noted on sheet A1. Applicant was required to provide two ornamental trees located on the berm. George McLean stated that two Chanticleer Pears would be fine at that location. (I have sited those on the plan.) Also, per a letter dated March 15, 2004 to Garry Plimmer, only a 20' access located at the trash enclosure is allowed. This information has also been redlined by me on sheet A1.
|
Routing - PUBLIC WORKS | 4/21/2004 | | 5/10/2004 | | FAIL |
|
|
|
Will complete review through envirormental when we receive plumbing plans.
|
Routing - PLANNING Land Div | 4/20/2004 | | 4/20/2004 | | PASS |
|
|
|
Lot 1, Block 1of Airway Park Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 4/20/2004 | | DONE |
|
|
|
No drainage calcs.
|
Plan routing begun/NEW & ADDTN | | | 4/20/2004 | | DONE |
|
|
|
|
Application received | | | 4/19/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/19/2004 | | DONE |
|
|
|
|
Fee Review-notes | 4/19/2004 | 4/19/2004 | | | |
|
|
|
|