BLD-Aging Inspection | 9/28/2010 | 9/28/2010 | 9/28/2010 | | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 9/28/2010 | 9/28/2010 | 9/28/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/10/2008 | 6/11/2008 | 12/8/2009 | A | CANC |
Jim Sly
|
|
|
Lynn @
|
BLD-Aging Inspection | 7/23/2009 | 7/23/2009 | 7/23/2009 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Final | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | CANC |
Jim Sly
|
|
|
Lynn ###-####
|
BLD-Framing/Rough-in | 2/6/2008 | 2/7/2008 | 2/7/2008 | A | PART |
Jim Sly
|
|
|
lynn Phone #: ###-#### Framing at front entry OK
|
BLD-Aging Inspection | 2/1/2008 | 2/1/2008 | 2/6/2008 | | PEND |
Jim Sly
|
|
|
Called owner.....he will call for final....
|
BLD-Conference | 8/7/2006 | 8/8/2006 | 8/8/2006 | A | PART |
Jim Sly
|
|
|
lynn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Consult on bearing walls at entry closet
|
BLD-Framing/Rough-in | 1/5/2006 | 1/6/2006 | 1/6/2006 | A | PART |
Jim Sly
|
|
|
lynn; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa WIP
|
BLD-Concrete | 7/27/2005 | 7/28/2005 | 7/28/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/27/2005 at 11:54:39 AM. Contact: ###-####. Called to insp curb...not regulated
|
BLD-Footing | 6/14/2005 | 6/15/2005 | 6/15/2005 | A | PART |
Jim Sly
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa OK to pour footing and wall.....E end of house.....N end of wall.
|
BLD-Concrete | 6/2/2005 | 6/3/2005 | 6/3/2005 | P | PASS |
Mike Jordan
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 5/31/2005 | 6/1/2005 | 6/1/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 9:42:49 AM. Contact: ###-####. Basement wall....Footing OK
|
Issue PAID IN FULL permit | | | 4/26/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/26/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2005 | | DONE |
|
|
|
called left message on Jeff's voicemail permit is ready 4/20/05 1:54 pm
|
Telephone call | | | 1/12/2005 | | DONE |
|
|
|
left mess for jeff king at ###-#### is ready & need achd approval
|
Inspection Record Card- Bld | | | 11/1/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/1/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/1/2004 | | DONE |
|
|
|
left mess for jeff king at ###-#### that permit is ready
|
Permit Ready to Issue | | | 10/29/2004 | | DONE |
|
|
|
|
Routing - FIRE | 10/25/2004 | | 10/27/2004 | | PASS |
|
|
|
resbumittal acceptable; review comments revised to reflect modified plans and occupancy.
|
Routing - PLAN CHECK | 10/27/2004 | | 10/27/2004 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/2004 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 10/27/2004 | | |
|
|
|
|
Plan assigned to (JCB) | 4/23/2004 | | 10/27/2004 | | PASS |
Jason Blais
|
|
|
10/27/2004 13:40:52 JCB - activity updated through activity BLDA022 from case BLD04-00793.
|
Routing - PLANNING | 10/22/2004 | | 10/25/2004 | | PASS |
|
|
|
Approved per DRH03-132, and as noted on sheets S.2 and L.1 for the following:
No parking or vehicle storage on unpaved areas.
Existing fence shall be repaired as needed where it is broken and/or leaning.
Due to removal of trees along Cloverdale Road, new street tree(s) shall be added per City Forester. Contact Brian Jorgenson at ###-####.
|
Routing - PUBLIC WORKS | 10/19/2004 | | 10/22/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/28/2004 | | 10/19/2004 | | FAIL |
|
|
|
Need retaining wall/foundation wall verfication from engineer and approvals from other divisions again. (Basement dwelling removed from project.) Plans to route to Public Works, Planning, and to Fire Dept.
|
Plan resubmittals received | | | 10/5/2004 | | DONE |
|
|
|
Received two copies of revised sheets S.1, S.2, L.1, A.1, A.2, A.3. One copy of plan review comments, one copy of letter from United Water, one copy of ES Report, one copy of Supplemental structural design calculations from Tamarack Grove, one copy of supplemental and one copy of structural design calculations from Brian J. Sielaff. Routed to Jason B. kmm
|
Routing - Erosion and Sediment | 5/27/2004 | | 5/28/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Plan Review Completed(1st rev) | | | 5/27/2004 | | FAIL |
|
|
|
failed PW, ESC, Bldg, and Fire
|
Routing - FIRE | 5/21/2004 | | 5/27/2004 | | FAIL |
|
|
|
Fire hyd location and flow info required. Review faxed to applicant (no fax at architect)
|
Routing - PLAN CHECK | 5/13/2004 | | 5/21/2004 | | FAIL |
|
|
|
Plan review report sent to architect and designer. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. and then to Erosion/Sediment Control again.
|
Plan resubmittals received | | | 5/18/2004 | | DONE |
|
|
|
Received Transmittal Letter. 2 Dishcharge Control Plan booklets 1 Set 2 Sheets of # 1 Taken to Jason Blais
|
Routing - PUBLIC WORKS | 5/11/2004 | | 5/13/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/10/2004 | | 5/11/2004 | | CANC |
|
|
|
Public Works requested plans again for review.
|
Routing - PLANNING | 5/5/2004 | | 5/10/2004 | | PASS |
|
|
|
Approved per CUP03-00107/CVA03-00040 (Susan Riggs)
and per DRH03-00132 (Marty Santoyo) and as noted on sheet S.2.
|
Routing - Erosion and Sediment | 5/4/2004 | | 5/5/2004 | | FAIL |
|
|
|
Inidividual listed as RP not certified by Boise City. ESC plan does not meet conditions of Appendix C of Plan Designer Manual. Notified Plan Designer.
|
Routing - PUBLIC WORKS | 4/26/2004 | | 5/4/2004 | | FAIL |
|
|
|
Requires drainage plan per Brian M.
|
Routing - PLANNING Land Div | 4/23/2004 | | 4/26/2004 | | PASS |
|
|
|
Approved. Existing parcel with existing structure. Surround by public right-of-way and platted lots.
|
Plans ACCEPTED BY PLAN TECH | | | 4/20/2004 | | DONE |
|
|
|
|
Application received | | | 4/19/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 4/19/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/19/2004 | | DONE |
|
|
|
|
Fee Review-notes | 4/19/2004 | 4/19/2004 | | | |
|
|
|
|