*Sage Medicial Relocatable* To place a used relocatable. Add foundation piers, tie downs, ramp, stairs, skirting, new concrete sidewalks, and electrical. Building to be field verified. Zoning CUP 97-00055 Susan Riggs, DRH 03-00155 Modification #1 Sarah Schafer. Field verification Bob Archibald. State Tag 8667FB
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/1/2008  
Third Notice BLD12/7/200512/7/200512/15/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice 5/20/200512/7/2005 DONE
First Notice 11/19/20044/26/2005 DONE
First Notice 11/19/20044/26/2005 DONE
FIRE-Final Inspection11/19/200411/19/200411/19/2004PCANC
DetailsTroy Cobbley
Don't know where this inspection came from. It was finaled by bob archibald on 11/15/04. Fire life safety was ok 11/19/2004 2:22:28 PM
BLD-Final11/19/200411/19/200411/19/2004PPASS
DetailsBob Archibald
Bond posted for landscape and exterior finish. ok for final.
Permanent Occupancy 11/19/200411/19/2004 DONE
Details
DOC - Permit Finaled  11/19/2004 DONE
Permanent occupancy UNPAID FEE  11/19/2004 DONE
Perm. Occ. Cert. # 10365 issued 11-19-04 to Sage Medical relocatable.
FIRE-Final Inspection11/15/200411/15/200411/15/2004APASS
DetailsTroy Cobbley
Final inspection performed by Bob Archibald. Items on CN field verified and confirmed by phone with Troy C..
BLD-Final11/15/200411/15/200411/15/2004PPART
DetailsBob Archibald
Ok pending code enforcement/lndscp approval.
FIRE-Final Inspection9/21/20049/21/20049/21/2004PFAIL
DetailsTroy Cobbley
no review notes on site. Sam will fax them to her office and inspection will be rescheduled 9/21/2004 3:49:41 PM
MISC ACTIONS  9/21/2004 PART
DetailsBob Archibald
Faxed copy of CN regarding exterior landscaping, landing and inspector phone #s.
BLD-Other9/7/20049/7/20049/7/2004PPEND
DetailsBob Archibald
Posted "Do Not Occupy w/out CO" and also left copy of Occupancy Request Card on site.
Print Occupancy Form  9/7/2004  
BLD-Conference7/30/20047/30/20047/30/2004APART
DetailsBob Archibald
Conference with Mary and concrete contractor on ADA requirements of landing and ramp. Grading work in progress. Also, informed Mary to obtain all required signatures on occupancy request card prior to occupying.
BLD-Other6/24/20046/24/20046/24/2004P 
DetailsBob Archibald
Site visit, no new construction in progress. backfill and grade has not begun around unit.
Issue PAID IN FULL permit  5/27/2004  
Permit Ready to Issue  5/24/2004 DONE
Telephone call  5/24/2004 DONE
left mess that permit is ready
Inspection Record Card- Bld  5/24/2004 DONE
Print Occupancy Form  5/24/2004 DONE
Print Occupancy Form  5/24/2004 DONE
Case Summary (BLD)  5/21/2004  
PLANS/APPL TAKEN TO FRONT DESK  5/21/2004 DONE
Plan assigned to (MLO)4/21/2004 5/21/2004 PASS
DetailsMike Otto
5/21/2004 15:56:44 MLO - activity updated through activity BLDA022 from case BLD04-00809.
Routing - PLUMBING5/21/2004 5/21/2004 PASS
PER PLANS AND 2000 UPC
Telephone call  5/20/2004 DONE
Talked with Mary I told her I will get the plan to plumbing after fire is done with the review.
Routing - FIRE5/18/2004 5/20/2004 PASS
attempted to fax review to applicant; fax number failed to operate.
Routing - PLAN CHECK5/12/2004 5/17/2004 PASS
foundation only building to be field verified. MLO
Plan resubmittals received  5/13/2004 DONE
Received letter of transmittal, copy of plumbing comments, two C1 sheets taken to Mike Otto.
Routing - PLUMBING5/11/2004 5/12/2004 FAIL
provide a plan showing the size and locations of sewer and water services to proposed relocatable, provide premise protection on the water service and thermol expantion protection at the water heater.
Routing - PLANNING5/5/2004 5/10/2004 PASS
Sarah Schafer & Susan Riggs
Routing - Erosion and Sediment5/3/2004 5/5/2004 PASS
ESC 03-01615 modified for new construction. ESC approved with attached condtions.
Routing - PUBLIC WORKS5/3/2004 5/3/2004 PASS
Routing - PLANNING Land Div4/21/2004 4/22/2004 PASS
Approved.
Plan routing begun/NEW & ADDTN  4/21/2004 DONE
Plans ACCEPTED BY PLAN TECH  4/21/2004 DONE
per Bob Archibald $<25,000.00
Application received  4/20/2004  
Override - Parcel Holds  4/20/2004  
Override - Parcel Holds  4/20/2004  
Recd Pcfee & Taken To Pln CK  4/20/2004 DONE
BLD-Other8/4/20048/4/20048/4/2002APART
DetailsBob Archibald
Site visit. no new work in progress.
Fee Review-notes4/20/20044/20/2004   
Routing - PLAN CHECK5/21/2004