Third Notice BLD | 5/20/2005 | 5/20/2005 | 9/8/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/10/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/10/2004 | 8/10/2004 | | DONE |
|
|
|
|
BLD-Final | 8/9/2004 | 8/10/2004 | 8/10/2004 | A | PASS |
Dave Hannah
|
|
|
Don, ###-#### ok for perm occ 8/10/2004 10:11:12 AM
|
Permanent occupancy | | | 8/10/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10256 issued 8-10-04 to Banner Bank on 3rd floor of Forest River IX.
|
BLD-Final | 7/15/2004 | 7/16/2004 | 7/16/2004 | A | PART |
Dave Hannah
|
|
|
ok for temp occ needs to finish ada restrooms and door hardware on two doors 7/16/2004 1:21:23 PM
|
Temporary occupancy | | | 7/16/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5125 issued 7-16-04 to Banner Bank.
|
FIRE-Final Inspection | 7/13/2004 | 7/14/2004 | 7/14/2004 | A | PASS |
Rick Jackson
|
|
|
Don, ###-####
|
FIRE-Final Inspection | 7/12/2004 | 7/13/2004 | 7/13/2004 | A | FAIL |
Rick Jackson
|
|
|
Don, ###-#### New rated doors at main exit are on mag hold opens - will require smoke detector for door release and plan submittals 7/13/2004 10:38:22 AM
|
BLD-Other | 6/17/2004 | 6/18/2004 | 6/18/2004 | P | PART |
Dave Hannah
|
|
|
Don - ###-#### - ceiling ok to drop in panels after elec ok 6/18/2004 11:49:48 AM
|
FIRE-Conference | 6/4/2004 | 6/4/2004 | 6/4/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/4/2004 at 6:29:34 AM. Contact: ###-####. Don has referenced the 1988 UMC for which the air handlers were installed, therefore the AHU's will not require detectors for shutdown as the units are not new nor being modified 6/4/2004 1:19:00 PM
|
BLD-Other | 5/28/2004 | 5/28/2004 | 5/28/2004 | P | PART |
Dave Hannah
|
|
|
Don, ###-#### - fire wall entry one hr corrodor wall at entry ok to cover 5/28/2004 1:24:08 PM
|
BLD-Framing/Rough-in | 5/26/2004 | 5/26/2004 | 5/26/2004 | P | PART |
Russ Owen
|
|
|
Don, ###-####, this needs a electrical,and plumbing r-i contractor on site, also needs to maintain the 1 hr corridor construction over the door contractor may drywall office raes after r-i ,s have been completed , but must call inspection on the area above the corridor. 5/26/2004 3:07:59 PM
|
Issue PAID IN FULL permit | | | 5/19/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/18/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/18/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/18/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plan assigned to (CJW) | 4/23/2004 | | 5/18/2004 | | PASS |
Carl Westfall
|
|
|
5/18/2004 11:39:16 CJW - activity updated through activity BLDA022 from case BLD04-00813.
|
Routing - PLAN CHECK | 5/13/2004 | | 5/18/2004 | | PASS |
|
|
|
The drawings were approved, with clarifications, after the resubmittal review.
|
Plan resubmittals received | | | 5/14/2004 | | DONE |
|
|
|
Received Transmittal Letter , 1 Set A 6.1 Sent to Carl Westfall...
|
Routing - FIRE | 5/11/2004 | | 5/13/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/26/2004 | | 5/11/2004 | | |
|
|
|
Failed 1st IBC plan review. IBC plan review was started May 7, 2004 and was finished May 11, 2004. A response from the architect was required. A copy of the report was E-mailed to the architect.
|
Routing - PUBLIC WORKS | 4/23/2004 | | 4/26/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/21/2004 | | DONE |
|
|
|
|
Application received | | | 4/20/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/20/2004 | | |
|
|
|
|
Fee Review-notes | 4/20/2004 | 4/20/2004 | | | |
|
|
|
|