Case Summary (BLD) | | | 1/7/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/16/2009 | | DONE |
Tisha Gallop
|
|
|
|
Second Notice BLD | 10/27/2005 | 10/27/2005 | 10/27/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/26/2005 | 10/27/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/8/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10522 issued 4-8-05 to Little Britches Child Care.
|
BLD-Final | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | PASS |
Jim Sly
|
|
|
joe--call 1st before insp for access ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Perm Occ. :) 4/4/2005 4:50:21 PM
|
Permanent Occupancy | | 4/4/2005 | 4/4/2005 | | DONE |
|
|
|
|
BLD-Conference | 3/15/2005 | 3/15/2005 | 3/15/2005 | P | PASS |
Jim Sly
|
|
|
per jim sly Met with concrete contr 3/15/2005 2:49:22 PM
|
CHANGE STATUS TO (ISS) | | | 3/15/2005 | | DONE |
|
|
|
changed status to issued per jim sly
|
Code Occupancy Approval | 2/17/2005 | 2/17/2005 | 2/17/2005 | P | PASS |
Carol Montgomery
|
|
|
|
DOC - Permit Finaled | 2/17/2005 | 2/17/2005 | 2/17/2005 | P | PASS |
Carol Montgomery
|
|
|
Finaled by inspector at 2/17/2005 3:49:42 PM
|
FIRE-Final Inspection | 1/12/2005 | 1/13/2005 | 1/13/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 1/13/2005 9:34:42 AM
|
Code Occupancy Approval Temp | 1/10/2005 | 1/10/2005 | 1/10/2005 | P | DONE |
Carol Montgomery
|
|
|
Signed temporary - bonded for remainder of prkg. lot.
|
Temporary occupancy | | | 1/10/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5190 issued 1-10-05 to Little Britches Child Care.
|
BLD-Final | 12/28/2004 | 12/29/2004 | 12/29/2004 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/28/2004 at 1:03:56 PM. Contact: ###-####.
|
BLD-Final | 12/29/2004 | 12/29/2004 | 12/29/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/29/2004 at 10:59:26 AM. Contact: ###-####. C/N ..... Need Perm occ from Fire and CDHD. Obtain Perm Occ. status for Structural within 90 days of this notice. Complete ramps per appr plan (not 1:12) and install Temp glass at both sides of Front door, and S. side of (S) rear door. Glass protected with plywood at time of inspection. 12/29/2004 2:36:06 PM 12/29/2004 2:41:44 PM
|
FIRE-Final Inspection | 12/28/2004 | 12/28/2004 | 12/28/2004 | P | PART |
Troy Cobbley
|
|
|
Joe; phone ###-#### A temporary occupancy was given with Sam Rogers and Dave Millers permission until the exit discharge lights are provide. 12/28/2004 3:41:17 PM
|
FIRE-Final Inspection | 12/27/2004 | 12/27/2004 | 12/27/2004 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled 12/27/2004 5:07:47 PM
|
FIRE-Final Inspection | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide exit discharge lighting on the main exit and from classroom 5. Provide annual inspection for the fire extinguishers and provide approved door hardware for all doors in basement 12/20/2004 4:09:11 PM
|
BLD-Conference | 12/17/2004 | 12/17/2004 | 12/17/2004 | P | PASS |
Jim Sly
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Jan Rice Needs to re-work ramps. 12/17/2004 5:11:02 PM
|
BLD-Energy code compliance | 9/2/2004 | 9/2/2004 | 9/2/2004 | P | PASS |
Jim Sly
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 8/24/2004 | 8/25/2004 | 8/25/2004 | A | PASS |
Jim Sly
|
|
|
joe ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Foundation | 7/23/2004 | 7/23/2004 | 7/23/2004 | P | CANC |
Tom Arcoraci
|
|
|
Shawn; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Foundation | 7/23/2004 | 7/23/2004 | 7/23/2004 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 7/21/2004 | 7/22/2004 | 7/22/2004 | A | PASS |
Tom Arcoraci
|
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Case Summary (BLD) | | | 7/19/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/30/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/25/2004 | | 6/28/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/28/2004 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Permit Ready to Issue | | | 6/28/2004 | | |
|
|
|
|
Plan assigned to (R_H) | 5/13/2004 | | 6/28/2004 | | PASS |
|
|
|
6/28/2004 08:35:21 RMH - activity updated through activity BLDA022 from case BLD04-00815.
|
Routing - Erosion and Sediment | 6/23/2004 | | 6/25/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 6/22/2004 | | 6/24/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 6/18/2004 | | 6/22/2004 | | PEND |
|
|
|
Pending fire/ and ESC reviews and approvals. No corrections required by building department review.
|
Case Summary (BLD) | | | 6/22/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/18/2004 | | DONE |
|
|
|
letter from architect received requesting approval without type 1 hood based on sample menu attached. Approved by D. Miller subject to periodic field verification of no grease accumulation; any accumualtion in future will reuqire a type 1 hood. Letter routed to bldg plan reviewer, awaiting receipt of remainder of required resubmittal items.
|
Plan resubmittals received | | | 6/18/2004 | | DONE |
|
|
|
Received Transmittal Letter , 1 sheet of a DAY CARE MENU FORM. Sam R. brought it to Plan Review Taken to Ron Hill
|
Routing - PUBLIC WORKS | 6/15/2004 | | 6/18/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/17/2004 | | DONE |
|
|
|
Received three site plans for Brian M. taken to Brian.
|
Routing - PLAN CHECK | 5/24/2004 | | 6/15/2004 | | |
|
|
|
|
Plan resubmittals received | | | 6/14/2004 | | DONE |
|
|
|
Received letter of transmittal, response letter, two sets of sheets 1,2,3,4,5,6 put with plans and routed to PW per Ron H.
|
Routing - FIRE | 5/19/2004 | | 5/24/2004 | | FAIL |
|
|
|
Comm'l cooking and residential alarm issues. review emailed to architect; alnjanfrew@msn.com.
|
Routing - PLAN CHECK | 5/3/2004 | | 5/19/2004 | | FAIL |
Ron Hill
|
|
|
Mailed requirements to the Architect Jan Frew on 5/19/04, NO Fax number was provided. Routed plans to the fire department for review on same day.
|
Case Summary (BLD) | | | 5/19/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/14/2004 | | DONE |
|
|
|
Received 1 Transmittal Sheet .Taken to Ron Hill as he has the plans, and Steve W told me to have Ron insert into the plans...
|
Plan assigned to (MLO) | 4/22/2004 | | 5/13/2004 | | DEFR |
Mike Otto
|
|
|
Plan has been reassigned to Ron Hill.
|
Routing - PLUMBING | 4/30/2004 | | 4/30/2004 | | PASS |
|
|
|
water systems from apartment and daycare are separate.
|
Routing - PLANNING | 4/29/2004 | | 4/29/2004 | | PASS |
|
|
|
Passed with the following provisions:
1. A new and separate address shall be required for the apartment.
2. One bicycle parking space is provided.
3. All driveways and parking areas are paved. Building department, do not issues building permit until the applicant receives ESP approval. The project and setbacks were approved per CUP03-00097.
|
Routing - Erosion and Sediment | 4/28/2004 | | 4/29/2004 | | FAIL |
|
|
|
No RP BMP inspection list included. No sediment controls provided for on-site storm drainage systems. Left voice message for PD.
|
Routing - PUBLIC WORKS | 4/23/2004 | | 4/28/2004 | | FAIL |
|
|
|
Need letter & 3 Copys
|
Routing - PLANNING Land Div | 4/22/2004 | | 4/23/2004 | | PASS |
|
|
|
Lot 3, Block 1, Osier Subdivision
|
Plans ACCEPTED BY PLAN TECH | | | 4/22/2004 | | PEND |
|
|
|
Requries grading and drainage plans, O&M, and drainage calcs.
|
Plan routing begun/NEW & ADDTN | | | 4/22/2004 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/21/2004 | | DONE |
|
|
|
|
Application received | | | 4/20/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/20/2004 | | |
|
|
|
|
Fee Review-notes | 4/21/2004 | 4/21/2004 | | | |
|
|
|
|
Fee Review-notes | 4/20/2004 | 4/20/2004 | | | |
|
|
|
|