BLD-Framing/Rough-in | 6/18/2004 | 6/18/2004 | 6/18/2004 | P | PASS |
Troy James
|
|
|
James; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Energy ok 6/18/2004 1:14:54 PM
|
BLD-Framing/Rough-in | 5/21/2004 | 5/21/2004 | 5/21/2004 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/21/2004 at 8:39:15 AM. Contact: ###-####.
ok to cover exterior, insulate after plumbing sign off on rouph,, and to rock the ceiling 5/21/2004 12:20:56 PM
|
BLD-Framing/Rough-in | 5/20/2004 | 5/20/2004 | 5/20/2004 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 9:09:46 AM. Contact: ###-####. this needs plumbing inspection prior to a framing inspecvtion,but owner wants to put finished siding on, ok at north and south walls, but the east wall needs the osb to cover the hing joint as per letter from engineer home owner is on site now will recall this. 5/20/2004 1:59:42 PM 5/20/2004 2:00:08 PM 5/20/2004 2:00:38 PM
|
BLD-Framing/Rough-in | 4/29/2004 | 4/30/2004 | 4/30/2004 | P | NR |
Tony Young
|
|
|
james- ###-#### call 1st before insp
conf. only 4/30/2004 2:27:55 PM
|
Print Pending Permit.LaserJet4 | | | 4/29/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/29/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/29/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/29/2004 | | |
|
|
|
|
Application received | | | 4/21/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/21/2004 | | |
|
|
|
|