Third Notice | | 5/20/2005 | 12/13/2005 | | DONE |
|
|
|
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/10/2005 | 4/26/2005 | | DONE |
|
|
|
|
BLD-Final | 2/9/2005 | 2/10/2005 | 2/10/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 1:23:49 PM. Contact: ###-####. pending zoning 2/10/2005 9:13:10 AM
|
BLD-Final | 2/10/2005 | 2/10/2005 | 2/10/2005 | P | PASS |
Tom Arcoraci
|
|
|
ok for perm occ when others sign perm 2/10/2005 2:25:13 PM
|
Permanent Occupancy | | 2/10/2005 | 2/10/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 2/10/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10448 issued 2-10-05 to First National Pawn.
|
BLD-Final | 2/9/2005 | 2/9/2005 | 2/9/2005 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 10:58:44 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Feb 9 2005 11:08AM.
|
BLD-Final | 2/4/2005 | 2/7/2005 | 2/7/2005 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/4/2005 at 11:49:52 AM. Contact: ###-####. needs spec insp report for final 2/7/2005 3:23:23 PM
|
FIRE-Final Inspection | 2/7/2005 | 2/7/2005 | 2/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 2/7/2005 1:50:52 PM
|
PubWorks Occupancy Approval | 1/27/2005 | 1/27/2005 | 1/27/2005 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 1/27/05. R.Rokovitz
|
FIRE-Final Inspection | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers permission. Items needing to be corrected are: Label duct smoke detectors for hvac unit location, install fourth annunciator, provide two additional fire extinguishers, provide three remaining fire dampers in the returns and provide the foam filters for the sample tubes for duct detector #3. 1/26/2005 11:02:55 AM
|
(F) Reprint permit | | | 1/24/2005 | | DONE |
|
|
|
|
FIRE-Conference | 1/20/2005 | 1/20/2005 | 1/20/2005 | P | DONE |
Troy Cobbley
|
|
|
Pat; ###-#### I went over life safety requirements with the contractor and owner. 1/20/2005 2:56:05 PM
|
BLD-Other | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/18/2005 at 8:49:48 AM. Contact: ###-####. wall ok 1/18/2005 3:45:59 PM
|
FIRE-Final Inspection | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | CANC |
Troy Cobbley
|
|
|
Per contractor, he actually needed a cover inspection from the structural inspector. 1/18/2005 2:48:46 PM
|
BLD-Conference | 1/13/2005 | 1/13/2005 | 1/13/2005 | A | PASS |
Tom Arcoraci
|
|
|
fire barrier 1/13/2005 10:24:15 AM
|
BLD-Foundation | 10/18/2004 | 10/19/2004 | 10/19/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/18/2004 at 11:13:09 AM. Contact: ###-####.
|
BLD-Foundation | 10/14/2004 | 10/15/2004 | 10/15/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 3:09:20 PM. Contact: ###-####. Steve Cromwell (ENG) No special insp Req. 10/15/2004 9:55:01 AM
|
BLD-Footing | 10/11/2004 | 10/12/2004 | 10/12/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 3:46:55 PM. Contact: ###-####.
|
BLD-Footing | 10/11/2004 | 10/12/2004 | 10/12/2004 | P | PASS |
Tom Arcoraci
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
(F) Reprint permit | | | 9/23/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/22/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/20/2004 | | DONE |
|
|
|
Spoke with Scott from Architects office and told him that permit is ready & fees///9/20/04 12:00pm BAS
|
Routing Off Site - STRUCTURAL | 9/7/2004 | | 9/13/2004 | | PASS |
|
|
|
Called PDQ for pickup. Received fax from consulting structural engineer approving the resubmittals. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/13/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/13/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/13/2004 | | DONE |
|
|
|
permit ready and fee due
|
Routing - PLAN CHECK | 8/19/2004 | | 9/13/2004 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 4/26/2004 | | 9/13/2004 | | PASS |
John Menard
|
|
|
9/13/2004 09:33:31 JCM - activity updated through activity BLDA022 from case BLD04-00838.
|
Plan resubmittals received | | | 9/7/2004 | | DONE |
|
|
|
Received letter of transmittal with one copy of A-3.0 sheet taken to John M.
|
Plan resubmittals received | | | 9/2/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Sets of A-3.0 Taken to John Menard...
|
Plan resubmittals requested | | | 8/23/2004 | | DONE |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 8/12/2004 | | 8/23/2004 | | FAIL |
|
|
|
Contacted PDQ for outside engineering. - Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 8/19/2004 | | 8/19/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 8/16/2004 | | 8/16/2004 | | FAIL |
|
|
|
RP listed on application not certified by Boise City, informed plan designer.
|
Routing - PLAN CHECK | 6/8/2004 | | 8/16/2004 | | |
|
|
|
|
Plan resubmittals received | | | 8/12/2004 | | DONE |
|
|
|
Received transmittal letter, two copies of structural calculations, three copies of building framing plans taken to John M.
|
Routing - FIRE | 6/4/2004 | | 6/8/2004 | | PASS |
Bill Alexander
|
|
|
|
Plan Reviewer's activity | | | 6/4/2004 | | PEND |
|
|
|
Reviewed and approved resubmitted plan sheets. Waiting for pre-engineered structural plans so that the structural review can be completed. JCM
|
Routing - PLAN CHECK | 5/14/2004 | | 6/4/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/3/2004 | | DONE |
|
|
|
Received 2 response letters, two copies of calculations, two copies of sheets A-0.0,A-1.0,A-3.0,A-4.0,A-5.0,A-6.0,A-7.0,A-8.0,A-9.0,A-10.0,M1.0,EN-1,P1.0,E-2.0,E-3.0,taken to John M.
|
Plan Review Completed(1st rev) | | | 5/14/2004 | | DONE |
|
|
|
|
Routing - FIRE | 5/13/2004 | | 5/14/2004 | | FAIL |
Bill Alexander
|
|
|
Exiting Issues
|
Plan resubmittals requested | | | 5/13/2004 | | DONE |
|
|
|
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 5/10/2004 | | 5/13/2004 | | FAIL |
|
|
|
|
Routing - PLUMBING | 5/7/2004 | | 5/10/2004 | | PASS |
|
|
|
4" rain water piping from site system to gutter drains inside building.
|
Routing - PLANNING | 4/29/2004 | | 5/7/2004 | | PASS |
|
|
|
Approved per DRH03-220 Mod. #1 and per revised plans submitted (faxed) on 5-7-04.
|
Routing - Erosion and Sediment | 4/28/2004 | | 4/29/2004 | | FAIL |
|
|
|
Individual listed as RP not certified by Boise City.
|
Routing - PUBLIC WORKS | 4/27/2004 | | 4/28/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 4/26/2004 | | 4/26/2004 | | PASS |
|
|
|
Approved. Existing site with existing building. Parcel defined by existing right-of-way and existing buildings.
|
Plans ACCEPTED BY PLAN TECH | | | 4/26/2004 | | PEND |
|
|
|
Requires 1. Out side engineering plans and calcs. for the pre-engineered Butler Building. Contacted Randy Haverfield. kmm
|
Application received | | | 4/22/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/22/2004 | | DONE |
|
|
|
|
Fee Review-notes | 4/22/2004 | 4/22/2004 | | | |
|
|
|
|