Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-00847
StatusFinaled
Name WASHINGTON GROUP INTERNATIONAL
Site Address 400 S BROADWAY AVE
Project NameMK PLAZA I-BASEMENT
Customer Number 
ePlanReviewNo
Description
(WASHINGTON GROUP INTERNATIONAL - MK PLAZA I - BASEMENT AUDITORIUM) This building is fire sprinklered to deal with the 4 story atruim. To remodel the existing 1,754 square foot auditorium located in the basement of MK Plaza I. Miscellaneous other areas are also being altered. The women's restroom in the basement will be upgraded to be accessible to the disabled. Work is to include interior nonbearing walls, suspended ceilings, millwork, and finishes all per the approved drawings and the plan review report on file. Within the altered areas, the location of fire sprinkler heads shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/20/20061/20/20061/20/2006 DONE
Second Notice has not been responded to.
Second Notice BLD12/22/200512/22/20051/20/2006 DONE
First Notice has not been responded to.
First Notice12/2/200512/2/200512/22/2005 DONE
DetailsDave Hannah
BLD-Aging Inspection11/30/200511/30/200512/2/2005 PASS
DetailsDave Hannah
c.o was issued by troy james
DOC - Permit Finaled12/2/200512/2/200512/2/2005PPASS
DetailsDave Hannah
BLD-Conference6/23/20056/23/20056/24/2005PPASS
DetailsDave Hannah
vince ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie exit signs
FIRE-Conference6/23/20056/23/20056/23/2005PDONE
DetailsForrest France
On site discussion with Vince regarding location of exit signs in basement corridor.
FIRE-Final Inspection3/7/20053/8/20053/8/2005PPART
DetailsTroy Cobbley
vince; Phone #: ###-#### Items on the correction notice have been corrected. Need to help with location for exit signs in basement to first floor. 3/8/2005 4:43:22 PM
BLD-Final10/1/200410/4/200410/4/2004PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 10/1/2004 at 11:54:19 AM. Contact: ###-####.
BLD-Final9/28/20049/29/20049/29/2004PCANC
DetailsTroy James
rick - Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Barbara Moore
FIRE-Final Inspection9/28/20049/29/20049/29/2004AFAIL
DetailsRick Jackson
rick - Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Remove arrow on exit sign at main exit; post occupant load sign; deadbolts on media rooma nd electrical room must release from inside; complete sprinklers in coat room 9/29/2004 11:12:41 AM
BLD-Framing/Rough-in8/25/20048/26/20048/26/2004APART
DetailsDave Hannah
rick; Phone #: ###-#### Internet Inspection Request from: Annette Moore ceiling grid ok 8/26/2004 12:41:42 PM
BLD-Framing/Rough-in8/24/20048/25/20048/25/2004ACANC
DetailsTroy James
rick - note: call 1/2 hr prior - ceiling inspection to cover; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Need fire approval. 8/25/2004 10:04:48 AM
FIRE-Sprinkler Rough-in8/25/20048/25/20048/25/2004PPART
DetailsRick Jackson
rick; Phone #: ###-#### Internet Inspection Request from: Annette Moore Okay to cover breakroom and vestibule; need fire alarm analysis per plan review note #15 8/25/2004 2:56:23 PM
BLD-Framing/Rough-in7/30/20048/2/20048/2/2004PPASS
DetailsTroy James
rick-call 1/2 hr prior inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  6/22/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/18/2004 DONE
Permit Ready to Issue  6/18/2004 DONE
Inspection Record Card- Bld  6/18/2004 DONE
Telephone call  6/18/2004 DONE
left mess that permit is ready
Plan assigned to (CJW)4/28/2004 6/18/2004 PASS
DetailsCarl Westfall
6/18/2004 10:47:51 CJW - activity updated through activity BLDA022 from case BLD04-00847.
Routing - PLAN CHECK5/17/2004 6/18/2004 PASS
Drawings approved with clarifications after resubmittal review. Final response received via E-mail June 17, 2004.
Plan resubmittals received  6/10/2004 DONE
Received Transmittal Letter, 1Set with Sheets A2.1 , A8.1 ... Taken to Carl Westfall
Plan resubmittals received  6/9/2004 DONE
Received Transmittal Letter, 1 Set of pages A8.1 Taken to Carl Westfall

The resubmittal was NOT approved. Another on requested. CJW
Routing - FIRE5/14/2004 5/17/2004 PASS
Routing - PLAN CHECK5/3/2004 5/14/2004  
Failed first IBC plan review. IBC plan review started May 12, 2004 and finished May 14, 2004. A response from the architect was required. See the plan review report. A copy was E-mailed to the architect.
Routing - PUBLIC WORKS4/28/2004 5/3/2004 PASS
Plans ACCEPTED BY PLAN TECH  4/26/2004 DONE
Application received  4/23/2004  
Recd Pcfee & Taken To Pln CK  4/23/2004  
Fee Review-notes4/23/20044/23/2004