Permit Information
Permit NumberBLD04-00849
StatusFinaled
Name BOISE CITY AIRPORT
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT-Passenger Walkway
Customer Number 
ePlanReviewNo
Description
Boise Airport Terminal - (Passenger Ground Load Walkways) * To construct two noncombustible, open air, pedestrian walkways for shelter and security while ground loading passengers onto aircraft. The east walkway is approximately 330 feet by 14 feet wide, the west walkway is approximately 190 feet by 14 feet wide. These pedestrian walkways will be located on the south side of the new airport terminal building. The attendant kiosk shown on the plans is not part of this permit approval. It will be permitted under a separate project (see attached letter from the architect). All construction per the approved plans on file. DRH99-00206/CUP99-00130/#04-237/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/7/200512/7/200512/9/2005 DONE
Second Notice has not been responded to.
Second Notice 9/20/200512/7/2005 DONE
First Notice 8/29/20059/21/2005 DONE
BLD-Aging Inspection8/29/20058/29/20058/29/2005 PASS
DetailsJim Storey
DOC - Permit Finaled8/29/20058/29/20058/29/2005PPASS
DetailsJim Storey
BLD-Aging Inspection6/28/20056/28/20056/28/2005 PASS
DetailsJim Storey
c/n made ok
BLD-Final4/26/20054/27/20054/27/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/26/2005 at 12:37:12 PM. Contact: ###-####.lower 2 exit signs/ need mti afadaviad.
FIRE-Final Inspection4/26/20054/27/20054/27/2005APASS
DetailsTroy Cobbley
Fire life safety finaled
(F) Reprint permit  3/16/2005  
BLD-Foundation12/28/200412/29/200412/29/2004APASS
DetailsJim Storey
Todd; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Footing12/3/200412/6/200412/6/2004APASS
DetailsJim Storey
###-#### - todd Note: please 1/2 hr prior to inspection to inescort you in airport pending si reports. 12/6/2004 9:58:51 AM
Plan resubmittals received  11/22/2004 DONE
Received Transmittal Letter..Taken to John M.
Plan resubmittals received  11/12/2004 DONE
Received Transmittal Letter. Taken to John M.
Issue & PRINT to be Invoiced  11/5/2004 DONE
Plan Reviewer's activity  10/21/2004 DONE
Spoke with Sam Rogers about the proposed modification and indicated that he would not need to see the plans. JCM
PLANS/APPL TAKEN TO FRONT DESK  10/21/2004 DONE
Inspection Record Card- Bld  10/21/2004 DONE
Permit Ready to Issue  10/21/2004 DONE
Telephone call  10/21/2004 DONE
Spoke with Matt and told him that permit was revised and ready and faxed over fee break out for him///10/21/04 11:45am BAS
Plan assigned to (JCM)10/20/2004 10/21/2004 PASS
10/21/2004 09:37:40 JCM - activity updated through activity BLDA022 from case BLD04-00849.
CHANGE STATUS TO (REV)  10/20/2004  
Telephone call  7/12/2004 DONE
left mess for matt petaja ###-#### that permit is ready
Inspection Record Card- Bld  6/17/2004 DONE
Permit Ready to Issue  6/17/2004 DONE
Telephone call  6/17/2004 DONE
PERMIT READY AND FEE DUE
Routing - PLAN CHECK6/2/2004 6/16/2004 PASS
Plan resubmittals received  6/16/2004 DONE
Received Transmittal Letter, 2 Sets with A102, A104, A503, E2.1 Taken to John Menard
Plan Reviewer's activity  6/16/2004 PASS
Revised plans approved as submitted. JCM
PLANS/APPL TAKEN TO FRONT DESK  6/16/2004 DONE
Plan assigned to (JCM)4/30/2004 6/16/2004 PASS
DetailsJohn Menard
6/16/2004 15:40:44 JCM - activity updated through activity BLDA022 from case BLD04-00849.
Routing - Erosion and Sediment6/1/2004 6/2/2004 PASS
Waiver from plan approved with conditions.
Routing - PLAN CHECK5/25/2004 6/1/2004 PEND
Routing - FIRE5/20/2004 5/25/2004 PASS
Plan Review Completed(1st rev)  5/25/2004 FAIL
Failed in ESC and Plan Check. Plans awaiting resubmittals in John's room.
Plan resubmittals requested  5/20/2004  
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - PLAN CHECK5/14/2004 5/20/2004 FAIL
Routing - AIRPORT5/11/2004 5/12/2004 PASS
Matt Pataja
Routing - PLANNING5/7/2004 5/11/2004 PASS
Approve
Routing - PUBLIC WORKS4/28/2004 5/7/2004 PASS
Routing - Erosion and Sediment5/7/2004 5/7/2004 FAIL
No ESC plan, narrative or application. Contacted Matt.
Routing - PLANNING Land Div4/27/2004 4/28/2004 PASS
Site is over 5 acres in size.
Pending Assignment by JCM4/27/2004 4/28/2004 DONE
DetailsJohn Menard
4/28/2004 07:49:07 JCM - activity updated through activity BLDA166 from case BLD04-00849.
Plan routing begun/NEW & ADDTN  4/27/2004 DONE
Plans ACCEPTED BY PLAN TECH  4/27/2004 PEND
Requires 1. Two copies of ESC plan and narrative with application. Contacted Matt Petaja at ###-####
Application received  4/23/2004  
Recd Pcfee & Taken To Pln CK  4/23/2004  
Fee Review-notes4/23/20044/23/2004