Letter of compliance | | | 6/7/2005 | | DONE |
|
|
|
Letter of Compliance issued 6-7-05.
|
BLD-Final | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | PASS |
Dave Hannah
|
|
|
ok for perm occ
|
BLD-Final | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | PASS |
Dave Hannah
|
|
|
###-#### - JIM ok for perm occ
|
BLD-Final | 6/3/2005 | 6/6/2005 | 6/6/2005 | A | NR |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
FIRE-Final Inspection | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
FIRE-Final Inspection | 6/3/2005 | 6/6/2005 | 6/6/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Final | 6/2/2005 | 6/3/2005 | 6/3/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/2/2005 at 4:38:20 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
BLD-Energy code compliance | 6/1/2005 | 6/2/2005 | 6/2/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/1/2005 at 3:24:25 PM. Contact: ###-####.
|
BLD-Final | 6/1/2005 | 6/2/2005 | 6/2/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/1/2005 at 3:25:03 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 | P | FAIL |
Troy Cobbley
|
|
|
Life safety is ok to final when the shell fire sprinkler permit is finaled
|
BLD-Final | 5/31/2005 | 5/31/2005 | 5/31/2005 | P | NR |
Jim Sly
|
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need fire final.
|
FIRE-Final Inspection | 5/31/2005 | 5/31/2005 | 5/31/2005 | P | CANC |
Troy Cobbley
|
|
|
Need shell core permits finaled before this inspection
|
BLD-Conference | 8/19/2004 | 8/19/2004 | 8/19/2004 | A | CANC |
Lane Manuel
|
|
|
8/19/2004 10:15:28 AM
|
BLD-Footing | 7/7/2004 | 7/8/2004 | 7/8/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/7/2004 at 1:52:10 PM. Contact: ###-####. wip 7/8/2004 8:43:27 AM
|
BLD-Footing | 7/6/2004 | 7/7/2004 | 7/7/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/6/2004 at 2:18:01 PM. Contact: ###-####. pending mti 7/7/2004 8:32:33 AM
|
Inspection Record Card- Bld | | | 6/30/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/30/2004 | | |
|
|
|
|
(F) Reprint permit | | | 6/21/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/18/2004 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 6/15/2004 | | 6/16/2004 | | PASS |
|
|
|
Recorded Notice of Buildable Parcel for ROS04-00017.
|
Routing - PLAN CHECK | 6/16/2004 | | 6/16/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/16/2004 | | DONE |
|
|
|
|
Telephone call | | | 6/16/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (JCM) | 4/28/2004 | | 6/16/2004 | | PASS |
John Menard
|
|
|
6/16/2004 13:11:01 JCM - activity updated through activity BLDA022 from case BLD04-00870.
|
Routing - PLAN CHECK | 6/9/2004 | | 6/15/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 6/4/2004 | | 6/9/2004 | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/9/2004 | | 6/9/2004 | | PASS |
|
|
|
|
Routing - FIRE | 6/1/2004 | | 6/4/2004 | | PASS |
|
|
|
Resubmittal acceptable with annotation of additional hydrant required.
|
Routing Off Site - STRUCTURAL | 6/1/2004 | | 6/3/2004 | | PASS |
|
|
|
Contacted PDQ for pickup. Received fax from consulting structural engineer approving resubmittals. JCM
|
Plan resubmittals received | | | 6/3/2004 | | DONE |
|
|
|
Received Transmittal Letter, 1 Set with sheets S2.1,S4.1, S4.2 for BLD04-00870
and 1 Set with sheets S2.1,S3.1,S4.1,S4.2,S7.1 for BLD04-00871 Taken to John Menard
|
Plan Reviewer's activity | | | 6/1/2004 | | PASS |
|
|
|
Reviewed and approved revisions as submitted. JCM
|
Routing - PLAN CHECK | 5/25/2004 | | 6/1/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/29/2004 | | DONE |
|
|
|
Received a response letter,cover sheet of application, two copies of the united water flow rate,two structural calculation books, two sets of sheets A2.2C-2,C-4,S7.1,S2.1,S3.1,S4.1,S4.2,H1 taken to John M.
|
Routing - PLANNING | 5/21/2004 | | 5/25/2004 | | PASS |
|
|
|
Approved per DRH04-31 and as attached.
|
Plan resubmittals received | | | 5/24/2004 | | DONE |
|
|
|
Received united water flow information taken to John M.
|
Routing - Erosion and Sediment | 5/20/2004 | | 5/21/2004 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - FIRE | 5/14/2004 | | 5/19/2004 | | FAIL |
|
|
|
water supply and high-piled warehouse issues
|
Routing - PLUMBING | 5/19/2004 | | 5/19/2004 | | PASS |
|
|
|
per plans and 2000 upc.
|
Plan Review Completed(1st rev) | | | 5/19/2004 | | FAIL |
|
|
|
Failed all but Plumbing
|
Plan resubmittals received | | | 5/18/2004 | | DONE |
|
|
|
Received Transmittal Letter. 6 Revised Erosin and sediment Control Plan booklets. 1 Set 6 Sheets # 1 2 Sheets 2 booklets inserted into set of plans in hold/extra set. the rest taken to John Menard ...
|
Plan resubmittals requested | | | 5/14/2004 | | |
|
|
|
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 5/11/2004 | | 5/14/2004 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 5/13/2004 | | |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals received | | | 5/11/2004 | | DONE |
|
|
|
Received Transmittal Letter. 2 pages of the O & M and 2 pages of the structural calcs . Taken to John Menard...
|
Routing - PLANNING | 5/5/2004 | | 5/11/2004 | | FAIL |
|
|
|
DRH04-00031 Sarah Schaffer
Need some revised drawings for the area to the north of building 11. I have contacted Wes Steele and will recall the plans once information is received.
|
Routing Off Site - STRUCTURAL | 4/28/2004 | | 5/10/2004 | | FAIL |
|
|
|
Contacted PDQ to take to outside engineering. Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 5/4/2004 | | 5/5/2004 | | FAIL |
|
|
|
ESC does not address EPA NOI requirements.
|
Routing - PUBLIC WORKS | 4/29/2004 | | 5/4/2004 | | FAIL |
|
|
|
No O & M manual, Requires drainage plan.
|
Routing - PLANNING Land Div | 4/28/2004 | | 4/29/2004 | | FAIL |
|
|
|
Need to complete ROS 04-00017. Called Jim Washburn at Engineering NW at ###-#### on April 29, 2004.
|
Plans ACCEPTED BY PLAN TECH | | | 4/28/2004 | | PEND |
|
|
|
No O&M manual
|
Application received | | | 4/26/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/26/2004 | | |
|
|
|
|
Fee Review-notes | 4/26/2004 | 4/26/2004 | | | |
|
|
|
|