Case Summary (BLD) | | | 6/14/2005 | | |
|
|
|
|
FIRE-Final Inspection | 8/19/2004 | 8/20/2004 | 8/20/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 8/20/2004 10:58:10 AM
|
BLD-Final | 8/20/2004 | 8/20/2004 | 8/20/2004 | P | PART |
Jim Sly
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/N..... Need re-pressure test on gas line (modified). Need Perm Occ status on Electr and CDHD..... Obtain perm occ status for structural within 90 days of this notice.......OK for Perm when Electr and CDHD OK for Perm. 8/20/2004 2:02:45 PM
|
BLD-Final | 8/19/2004 | 8/19/2004 | 8/19/2004 | P | NR |
Jim Sly
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Annette Moore Need all finals. 8/19/2004 4:34:37 PM
|
BLD-Framing/Rough-in | 8/9/2004 | 8/9/2004 | 8/9/2004 | P | PASS |
Jim Sly
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 8/9/2004 3:23:29 PM 8/9/2004 4:13:03 PM
|
BLD-Framing/Rough-in | 7/30/2004 | 7/30/2004 | 7/30/2004 | P | PASS |
Jim Sly
|
|
|
kenneth; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 7/23/2004 | 7/26/2004 | 7/26/2004 | A | FAIL |
Lane Manuel
|
|
|
###-#### ken
left c/n. need to have architect address bathroom ada clearances. need r- elec./ mech insp. 7/26/2004 1:13:32 PM
|
Plan assigned to (CJW) | 4/30/2004 | | 7/7/2004 | | PASS |
Carl Westfall
|
|
|
7/7/2004 08:14:30 CJW - activity updated through activity BLDA022 from case BLD04-00873.
|
Routing - PLAN CHECK | 7/7/2004 | | 7/7/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/7/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/7/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/7/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/7/2004 | | DONE |
|
|
|
spoke with Ken -- permit is ready.
|
Issue PAID IN FULL permit | | | 7/7/2004 | | DONE |
|
|
|
|
Routing - PLUMBING | 7/2/2004 | | 7/6/2004 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 5/25/2004 | | 7/2/2004 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 6/30/2004 | | DONE |
|
|
|
Received mechanical compliance on 8 1/2 x 11 sheet of paper, open web truss information, floor plan on 8 1/2 x 11, two sets of sheets A-1.0, P-1, P-2, taken to Carl W.
|
Plan Review Completed(1st rev) | | | 5/25/2004 | | FAIL |
|
|
|
failed plumbing and plan check
|
Routing - FIRE | 5/20/2004 | | 5/25/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/4/2004 | | 5/20/2004 | | |
|
|
|
Failed 1st IBC plan review. IBC plan review started May 19, 2004 and finished the next day. A response from the architect was required. See the plan review report. A copy was mailed to the architect.
|
Routing - PLUMBING | 5/3/2004 | | 5/4/2004 | | |
|
|
|
Failed 1st plumbing review.
1. plans do not reflect a floor sink for grease trap to indirect into 2. no waste to washer box 3. is mop sink existing? 4. water heater may require pan with a drain and an expansion tank 5. water service may require double check backflow protection
|
Routing - PUBLIC WORKS | 4/30/2004 | | 5/3/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/27/2004 | | PEND |
|
|
|
Plans not fully dimensioned and no code data on plans.
|
Application received | | | 4/26/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/26/2004 | | |
|
|
|
|
Fee Review-notes | 4/26/2004 | 4/26/2004 | | | |
|
|
|
|