Case Summary (BLD) | | | 10/9/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/7/2013 | | DONE |
|
|
|
|
DOC - Permit Expired | 6/8/2005 | 6/8/2005 | 6/8/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/22/2004 | 9/22/2004 | 9/22/2004 | | NR |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 6/23/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/22/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/22/2004 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2004 | | DONE |
|
|
|
permit ready and fee due
|
Plan assigned to (R_H) | 6/4/2004 | | 6/21/2004 | | PASS |
|
|
|
6/21/2004 14:06:54 RMH - activity updated through activity BLDA022 from case BLD04-00916.
|
Routing - PLAN CHECK | 6/11/2004 | | 6/21/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/21/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/21/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/16/2004 | | DONE |
|
|
|
Received letter of transmittal, 2ssets of revised T-1,A-2,A-3,A-7, sheets,response letter, Mfg. structural analysis, mfg. code compliance, mfg. specifications, Lighting compliance on 81/2 X 11 comment sheets 4/5
|
Plan Review Completed(1st rev) | | | 6/11/2004 | | DONE |
|
|
|
Failed:
Plan Check
|
Routing - FIRE | 6/8/2004 | | 6/11/2004 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 6/3/2004 | | 6/8/2004 | | FAIL |
|
|
|
Faxed and mailed requirements to architect, on 6/08/04, routed plans to the fire department same day.
|
Routing - Erosion and Sediment | 6/1/2004 | | 6/3/2004 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - PLUMBING | 5/28/2004 | | 6/1/2004 | | PASS |
|
|
|
per plans and 2000 upc
|
Plan resubmittals received | | | 5/29/2004 | | DONE |
|
|
|
Received letter of transmittal with three copies of ESC narrative and plan. Taken to Ron Hill.
|
Routing - PLANNING | 5/27/2004 | | 5/28/2004 | | PASS |
|
|
|
Approve per DRH04-89.
|
Routing - PUBLIC WORKS | 5/27/2004 | | 5/27/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/27/2004 | | DONE |
|
|
|
Received letter of transmittal from BRS stating that the CDH approval plans were sent back at Rons request for resubmittal.
|
Plans ACCEPTED BY PLAN TECH | | | 5/27/2004 | | DONE |
|
|
|
Received ESC application and a copy of the original sign off by CDH. Started plans rerouting per Ron H.
|
Plans ACCEPTED BY PLAN TECH | | | 5/26/2004 | | FAIL |
|
|
|
Plans placed in hold box needs ESC plan and application, needs CDH to sign off. Structural calcs.
|
CHANGE STATUS TO (PND) | | | 5/21/2004 | | |
|
|
|
they have all the stuff they needed
|
Plan assigned to (R_H) | 5/4/2004 | | 5/20/2004 | | CANC |
|
|
|
|
VOIDED CHANGE STATUS | | | 5/19/2004 | | DONE |
|
|
|
per linda void permit/brs arch are doing major changes/5/19/04/mls
|
Routing - PLUMBING | 5/10/2004 | | 5/11/2004 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PLANNING | 5/7/2004 | | 5/10/2004 | | FAIL |
|
|
|
Appeal period still active until May 17th (DRH04-00089).
|
Routing - PUBLIC WORKS | 5/5/2004 | | 5/7/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 5/7/2004 | | 5/7/2004 | | FAIL |
|
|
|
No ESC permit, plan or waiver letter attached.
|
Plans ACCEPTED BY PLAN TECH | | | 5/4/2004 | | FAIL |
|
|
|
May Require Lighting Compliance, too many things missing.
|
Application received | | | 4/30/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/30/2004 | | DONE |
|
|
|
|
Fee Review-notes | 4/30/2004 | 4/30/2004 | | | |
|
|
|
|