Permit Information
Permit NumberBLD04-00919
StatusFinaled
Name MCALVAIN CONSTRUCTION
Site Address 4111 W OVERLAND RD
Project NameAUTO ZONE
Customer Number 
ePlanReviewNo
Description
(AUTO ZONE) To remodel a 9,600 sq.ft. building for retail auto sales and storage per approved plans and DRH04-00050. Work to include, installation of new store front system, installation of new suspended ceiling, construction of two new accessible restrooms, installation of new sales counters, lighting and Hvac system, Miscelaneous related interior finishes, and site work. Demo lition of existing buildings being performed under separate permit. A separate permit will be required to install any new racking that is over eight feet high. (PC#258-04) rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/7/200512/7/200512/15/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice 5/20/200512/7/2005 DONE
First Notice 1/12/20054/26/2005 DONE
First Notice 8/26/20044/26/2005 DONE
Permanent occupancy  1/12/2005 DONE
Perm. Occ. Cert. # 10416 issued 1-12-05 to the Auto Zone.
BLD-Final1/6/20051/6/20051/6/2005PPASS
DetailsTom Arcoraci
Everything is final - please confirm that Structural is happy, too! Thanks, Cathy
Permanent Occupancy 1/6/20051/6/2005 DONE
Details
Code Occupancy Approval1/6/20051/6/20051/5/2005APASS
DetailsWm. Michael Meloy
Based on Inspection and staffing with Sarah Schafter meets compliance. 1/6/2005 10:05:22 AM 1/6/2005 10:05:48 AM
Code Occupancy Approval9/29/20049/29/20049/29/2004PFAIL
DetailsWm. Michael Meloy
Inspection noted that landscaping match the approved plans. Staffed with Sarah Schaffer and noted that pee gravel, river rock, had lava rock were used as ground covering was not approved and the plants in the landscaping do not match the number of in the landscaping. Sarah Schaffer said that either they must comply with the landscaping plan or they must apply for a committee level modification.. 9/30/2004 11:17:58 AM 9/30/2004 12:17:19 PM
BLD-Other9/28/20049/28/20049/28/2004PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/28/2004 at 9:32:11 AM. Contact: ###-####.
BLD-Final8/26/20048/27/20048/27/2004PPART
DetailsLane Manuel
TAMMY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Temp. C of O OK.
Permanent Occupancy OK pending Electrical insp. approval, and Bonding for Landscaping work, etc. 8/27/2004 12:42:50 PM.
8/27/2004 2:42:06 PM
FIRE-Final Inspection8/26/20048/27/20048/27/2004APASS
DetailsRick Jackson
9:30
Temporary occupancy  8/27/2004 DONE
Temp. Occ. Cert. # 5135 issued 8-27-04 to the Auto Zone, Inc.
BLD-Final8/24/20048/26/20048/26/2004ANR
DetailsLane Manuel
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Other8/26/20048/26/20048/26/2004PNR
DetailsLane Manuel
Scheduled by a contractor via Hello! on 8/26/2004 at 9:55:12 AM. Contact: ###-####.
FIRE-Conference8/26/20048/26/20048/26/2004PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/26/2004 at 10:02:23 AM. Contact: ###-####. Final will be okay after testing duct detectors for AHU shutdown 8/26/2004 4:06:49 PM
PubWorks Occupancy Approval8/25/20048/25/20048/25/2004 DONE
Drainage project complete, signed permanent occupancy 8/25/04. M.Strasser
FIRE-Final Inspection8/24/20048/25/20048/25/2004PCANC
DetailsTroy Cobbley
brian; Phone #: ###-#### Contractor is not ready 8/25/2004 1:06:23 PM
BLD-Framing/Rough-in8/12/20048/13/20048/13/2004PPASS
DetailsTom Arcoraci
jack; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in8/10/20048/11/20048/11/2004APART
DetailsTom Arcoraci
Jack -- celing grid; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes partial grid ok 8/11/2004 9:01:31 AM
BLD-Framing/Rough-in8/6/20048/9/20048/9/2004APART
DetailsTom Arcoraci
pete; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north east wall ok for cover 8/9/2004 9:06:30 AM
BLD-Energy code compliance7/26/20047/27/20047/27/2004APASS
DetailsTom Arcoraci
jack; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wip pok for cover 7/27/2004 9:40:01 AM
BLD-Framing/Rough-in7/22/20047/22/20047/22/2004PPART
DetailsTom Arcoraci
jack; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate store front framing not done yet 7/22/2004 2:09:56 PM
BLD-Conference7/15/20047/16/20047/16/2004APASS
DetailsTom Arcoraci
jack; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to phase job into to parts doing store front and entry last 7/16/2004 9:40:12 AM
BLD-Energy code compliance7/9/20047/9/20047/9/2004PNR
DetailsTom Arcoraci
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  7/9/2004 DONE
Print Occupancy Form  6/30/2004 DONE
Inspection Record Card- Bld  6/30/2004  
Permit Ready to Issue  6/30/2004 DONE
Telephone call  6/30/2004 DONE
permit ready and fee due
Routing - PLANNING Land Div6/29/2004 6/29/2004 PASS
Approved as Parcel A on ROS04-00019. ROS-6535 recorded on 6/01/04.
PLANS/APPL TAKEN TO FRONT DESK  6/29/2004 DONE
Plan assigned to (R_H)5/10/2004 6/29/2004 PASS
Details
6/29/2004 15:25:07 RMH - activity updated through activity BLDA022 from case BLD04-00919.
Routing - PLAN CHECK6/15/2004 6/29/2004 DONE
Case Summary (BLD)  6/16/2004 DONE
Routing - FIRE6/11/2004 6/14/2004 PASS
DetailsBill Alexander
Routing - PLAN CHECK6/7/2004 6/11/2004 PEND
Routed plans back to fire, no corrections required by building department review.
Plan resubmittals received  6/9/2004 DONE
Received Transmittal Letter, 2 signed Envelop Compliance Certificate 2 Lighting Compliance Certificates 2 Mechanical Compliance Certififates 2 Load Designs 2 Structural Calcs, 2 Sets C1.0, L1.0 , D-1, A-1, A-2, A-3, A-4, M-1, S-1, S-2, S-3. Taken to Ron Hill...
Routing - FIRE6/2/2004 6/7/2004 FAIL
DetailsBill Alexander
Need HAZMAT info per review notes.
Plan Review Completed(1st rev)  6/7/2004 DONE
Failed: Planning, Plan Check, Fire.
Case Summary (BLD)  6/2/2004 DONE
Routing - PLAN CHECK5/24/2004 6/2/2004 FAIL
Faxed and mailed requirements to the architect on 6/02/04, routed plans to the fire department same day.
Routing - PLANNING5/21/2004 5/24/2004 PASS
Sarah Schafer DRH04-00050
Routing - Erosion and Sediment5/18/2004 5/21/2004 PASS
ESC approved with conditons attached to plans.
Routing - PUBLIC WORKS5/10/2004 5/17/2004 PASS
Routing - PLANNING Land Div5/10/2004 5/10/2004 FAIL
Need to complete ROS04-00019.
Plans ACCEPTED BY PLAN TECH  5/5/2004 DONE
Application received  4/30/2004  
Recd Pcfee & Taken To Pln CK  4/30/2004 DONE
Fee Review-notes4/30/20044/30/2004