Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00942
StatusFinaled
Name HIGHLAND VILLAGE APARTMENTS
Site Address 2466 -2510 N BOGUS BASIN RD
Project NameHIGHLANDS VILLAGE BLD 7
Customer Number 
ePlanReviewNo
Description
2466 & 2464 N Bogus Basin Rd & 2508 & 2510 N Bogus Basin Rd (HIGHLAND FLOOR PLAN TYPE) To construct a new 13,266 sq.ft. three story, four unit apartment building. The first floor is 4,346 sq.ft. which 2,912 sq.ft. is for the garages, the second floor is 4,440 sq.ft. and the third floor is 4,440 sq.ft. Each unit on the second and thrird floors are single story units, three bedrooms with three bathrooms one full and two 3/4. Note: This building is fire sprinklered per NFPA 13-R for story increase. All construction per the approved plans and attached comment list. MJP DRH 02-240 CUP 02-0141
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD6/21/20076/21/20077/5/2007 DONE
First Notice has not been responded to.
Routing - PLANNING1/21/2005 7/5/2007 PASS
Need amenity clarification on BBQ pit and 22-feet of straight back-up on driveway for Unit #6 and handicap space designated on south property line. kg
First Notice 5/18/20076/21/2007 DONE
Permanent occupancy  5/18/2007 DONE
Perm. Occ. Cert. # 11620 issued 5-18-07 to the Highlands Village Apts.
Code Occupancy Approval5/17/20075/17/20075/17/2007PPASS
DetailsMichael Garner
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -

1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES

2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM

3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN

4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.

THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
Permanent Occupancy 5/17/20075/17/2007 DONE
Details
BLD-Final4/10/20074/10/20074/10/2007PPASS
DetailsTony Young
Buddy; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
ok for perm c of o
BLD-Final4/3/20074/4/20074/4/2007APASS
DetailsTony Young
buddy; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Temporary occupancy  4/4/2007 DONE
Temp. Occ. Cert. # 5563 issued 4-4-07 to the Highland Village Apts.
BLD-Final4/2/20074/3/20074/3/2007APART
DetailsTony Young
buddy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
conf walk through,, ok for temp occ pending plumbing final,, then ok for perm c of o pending zoning final
FIRE-Final Inspection3/30/20074/2/20074/2/2007PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Other1/2/20071/3/20071/3/2007PPASS
DetailsTony Young
buddy - vapor ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Energy code compliance1/3/20071/3/20071/3/2007PPASS
DetailsTony Young
buddy - vapor ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
FIRE-Final Inspection1/2/20071/3/20071/3/2007APART
DetailsForrest France
Cold cavity protection for the 3rd floor at building #7 is satisfactory, one area lacking proper insulation at the SW unit repaired while on site, rough-in is okay to cover.
BLD-Framing/Rough-in12/19/200612/22/200612/22/2006PPART
DetailsTony Young
Buddy; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
BLD-Aging Inspection12/14/200612/14/200612/18/2006 PASS
DetailsTony Young
BLD-Framing/Rough-in10/10/200610/10/200610/11/2006PPASS
DetailsTony Young
Keil; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
exterior shear ok
Inspection Record Card- Bld  8/31/2006 DONE
Print Occupancy Form  8/31/2006 DONE
BLD-Framing/Rough-in8/16/20068/16/20068/17/2006PDONE
DetailsDave Hannah
keill Note: fire wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in8/16/20068/17/20068/17/2006APART
DetailsDave Hannah
keill Note: fire wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to stand fire wall on third floor
BLD-Framing/Rough-in7/11/20067/11/20067/11/2006PPART
DetailsTony Young
keil; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
1st level firewalls ok
BLD-Framing/Rough-in7/5/20067/5/20067/5/2006PNR
DetailsTony Young
craig; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Aging Inspection6/15/20066/15/20066/16/2006 PASS
DetailsTony Young
BLD-Aging Inspection3/29/20063/29/20063/29/2006 PASS
DetailsTony Young
work still going on in this permit/project,, per Keil, project super
Case Summary (BLD)  3/16/2006  
BLD-Aging Inspection1/26/20061/26/20061/27/2006 PASS
DetailsTony Young
BLD-Conference1/27/20061/27/20061/27/2006PPASS
DetailsTony Young
call 1st, Keil,, find status of job
wip
BLD-Foundation9/28/20059/30/20059/30/2005APART
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/22/20059/22/20059/22/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 9/22/2005 at 8:09:50 AM. Contact: ###-####.
BLD-Aging Inspection5/16/20055/16/20055/16/2005 PASS
DetailsTony Young
(F) Reprint permit  2/14/2005 DONE
Issue PAID IN FULL permit  2/14/2005 DONE
Routing - PLAN CHECK2/10/2005 2/11/2005 PASS
Received Certificate of Value  2/11/2005  
PLANS/APPL TAKEN TO FRONT DESK  2/11/2005 DONE
Print Pending Permit.LaserJet4  2/11/2005 DONE
Case Summary (BLD)  2/11/2005 DONE
Permit Ready to Issue  2/11/2005 DONE
Inspection Record Card- Bld  2/11/2005 DONE
Print Occupancy Form  2/11/2005 DONE
Inspection Record Card- Bld  2/11/2005 DONE
Print Occupancy Form  2/11/2005 DONE
(F) Reprint permit  2/11/2005 DONE
Plan assigned to (M_P)5/4/2004 2/11/2005 PASS
DetailsMike Phillips
2/11/2005 14:26:42 M_P - activity updated through activity BLDA022 from case BLD04-00942.
Routing - PLAN CHECK1/28/2005 2/10/2005  
Routing to planning.
Routing - PLANNING2/10/2005 2/10/2005 PASS
Plans approved for CUP and DRH compliance.
Routing - FIRE1/21/2005 1/28/2005 PASS
resubmittal acceptable.
Plan resubmittals received  1/25/2005  
Received sheet A1.1
Routing - PLAN CHECK12/6/2004 1/21/2005  
Routing to Planning.
Plan resubmittals received  1/20/2005 DONE
Received Transmittal Letter, & 8 Copys of sheets, L1,L2,L3,L4,L5,L6,L7,L8,L9 Taken to Mike P.
Routing - PLANNING12/16/2004 1/7/2005 FAIL
Revised plans needed for compliance with Design Review and Conditional Use approvals. Informed Steve Dresser via phone call on January 6, 2005.
Plan resubmittals received  12/20/2004 DONE
Received two sets of sheets A1.1,A2.1,A2.1A,A3.3,A3.4,A3.5,A3.6,A7.2,E2.1,E2.1,E2.1A,S2.1A,S2.2,S3.1,S6.1 Taken to Mike P.
Routing - PLAN CHECK11/1/2004 12/6/2004 FAIL
Third review failed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Plan resubmittals received  11/23/2004 DONE
Received Transmittal Letter, & 2 Sets of A2.1, A2.1A, A2.2, A2.3, A3.1,A3.1A, A3.2, A3.2A, A3.3, A3.4, A3.5, A3.6, A4.1, E2.1, E2.1A, S1.1, S1.1(A), S2.1, S2.1(A) S2.2, S6.1, S7.1 Tasken to Mike P
Routing - FIRE10/27/2004 11/1/2004 FAIL
No fire resubmittal. Called architect and reviewed resubmittal requirement per 6/23/04 review. He overlooked, will resubmit.
Routing - PLAN CHECK9/7/2004 10/27/2004 FAIL
Second review failed sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Plan resubmittals received  10/25/2004 DONE
Received Transmittal Letter, & 4 Copys of sheets 12 OF 15,13 OF 15,1 OF 1 Taken to Mike Phillips...
Plan resubmittals received  9/30/2004 DONE
Received Transmittal Letter, & 2 Sets of A0.1,A0.2,A0.3,A0.4,A0.5,A0.6,A0.7,A0.8,A0.9,A1.1,A2.1,A2.1A,A2.2,A2.3,A2.4,A2.5,A3.1,A3.1A,A3.2,A3.2AA3.3,A3.4 (2) A3.5 A4.1,A5.1,A5.2,A7.1,A7.2,E2.1,E2.1A,E2.2 Taken to Mike Phillips
Routing - FIRE6/21/2004 9/23/2004 FAIL
Hydrant flow, AS info, FA not provided. Review comments faxed to architect.
Routing - PLANNING8/26/2004 9/7/2004 FAIL
Plans do not comply with CU conditions.

Also, the DR approval requires that the CU conditions be met prior to approval of building permit plans. The Design Review also requires that the landscape plan be revised per Forester's comments.
Plan resubmittals received  9/1/2004 DONE
Received transmittal letter and eight sets of sheet 1 through 15 all taken to Mike P.
Routing - PLAN CHECK8/9/2004 8/26/2004  
DetailsMike Phillips
Routing to planning
Routing - PLUMBING8/3/2004 8/9/2004 PASS
per plan and 2004 UPC
Routing - PLAN CHECK6/24/2004 8/3/2004  
Routing to Plumbing.
Plan Review Completed(1st rev)  6/23/2004 FAIL
failed Fire, plumbing and plan check
Case Summary (BLD)  6/21/2004  
Routing - PLAN CHECK6/4/2004 6/21/2004 FAIL
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing - PLUMBING5/28/2004 6/3/2004 FAIL
please provide a plan showing the items listed above.
Routing - PLANNING5/27/2004 5/28/2004 PEND
DRH02-00240 Marty Santoyo
CUP02-00141 Karen Gallagher

Pend Conditional Use Modification approvals.
Routing - Erosion and Sediment  5/27/2004 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS5/12/2004 5/20/2004 PASS
Routing - PLANNING Land Div5/10/2004 5/11/2004 PASS
Approved by ROS03-00009. Recorded ROS 6173 on 5/22/04
Plans ACCEPTED BY PLAN TECH  5/10/2004 DONE
Plan routing begun/NEW & ADDTN  5/10/2004 DONE
Application received  5/4/2004  
Recd Pcfee & Taken To Pln CK  5/4/2004 DONE
Fee Review-notes5/4/20045/4/2004   
Routing Off Site - STRUCTURAL5/10/2004    
Contacted PDQ for outside engineering.