2460 & 2462 N Bogus Rd & 2500 & 2502 N Bogus Basin Rd(HIGHLAND FLOOR PLAN TYPE) To construct a new 13,266 sq.ft. three story, four unit apartment building. The first floor is 4,346 sq.ft. which 2,912 sq.ft. is for the garages, the second floor is 4,440 sq.ft. and the third floor is 4,440 sq.ft. Each unit on the second and thrird floors are single story units, three bedrooms with three bathrooms one full and two 3/4. Note: This building is fire sprinklered per NFPA 13-R for story increase. All construction per the approved plans and attached comment list. MJP DRH 02-240 CUP 02-0141
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  7/28/2016 DONE
Case Summary (BLD)  2/24/2012  
Second Notice BLD9/13/20079/13/20079/13/2007 DONE
First Notice has not been responded to.
First Notice8/29/20078/29/20079/13/2007 DONE
DetailsTony Young
Fee Review-notes5/4/20045/4/20049/13/2007 DONE
Routing Off Site - STRUCTURAL5/10/2004 9/13/2007 PASS
Contacted PDQ for outside engineering.
BLD-Aging Inspection8/29/20078/29/20078/29/2007 PEND
DetailsTony Young
DOC - Permit Finaled8/29/20078/29/20078/29/2007PPASS
DetailsTony Young
BLD-Final5/22/20075/23/20075/23/2007APASS
DetailsTony Young
Buddy, Cathy W. has final paperwork on her desk; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIRE-Final Inspection5/22/20075/23/20075/23/2007APASS
DetailsForrest France
Fire life safety is acceptable for final.
Permanent Occupancy 5/23/20075/23/2007 DONE
Details
Code Occupancy Approval5/17/20075/17/20075/17/2007PPASS
DetailsMichael Garner
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -

1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES

2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM

3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN

4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.

THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
BLD-Aging Inspection2/28/20072/28/20072/28/2007 PEND
DetailsTony Young
BLD-Aging Inspection12/15/200612/15/200612/18/2006 PASS
DetailsTony Young
BLD-Final10/10/200610/11/200610/11/2006PPART
DetailsJim Sly
buddy; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
OK for Temp Occ.
Temporary occupancy  10/11/2006 DONE
Temp. Occ. Cert. # 5459 issued 10-11-06 to Highland Village Apts., Bldg. # 8
FIRE-Final Inspection10/10/200610/10/200610/10/2006PPART
DetailsTroy Cobbley
A temporary occupancy was given with dave hannimans permission until the elevator recall has been tested. The elevator is to remain locked out and unusable until all inspections have been passed. All other life safety items have been tested.
BLD-Aging Inspection10/5/200610/5/200610/6/2006 PEND
DetailsTony Young
Inspection Record Card- Bld  8/31/2006 DONE
Print Occupancy Form  8/31/2006 DONE
BLD-Aging Inspection7/17/20067/17/20067/18/2006 PASS
DetailsTony Young
BLD-Energy code compliance4/24/20064/25/20064/25/2006APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Energy code compliance4/18/20064/19/20064/19/2006PPART
DetailsTony Young
Keil ###-#### --- also sprinkler insulation insp with Forrest France 4-19 PM
need some f/block at kitchen, upper south east by f/p
FIRE-Sprinkler Rough-in4/18/20064/19/20064/18/2006PPART
DetailsForrest France
Overhead fire sprinkler is good for cover.
Override - People Holds  4/18/2006  
Override - People Holds  4/18/2006  
BLD-Framing/Rough-in4/12/20064/13/20064/13/2006PPART
DetailsTony Young
keal; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
c/n,, ok to insulate,, verify elec. permit for elevator prior to cover,, also sprinklers need another inspection for cover/tenting,,, c/n involves fireblocking w/ mineral wool,, point loads,, nail hangers,, straps on plates
BLD-Aging Inspection3/28/20063/28/20063/28/2006 PASS
DetailsTony Young
Case Summary (BLD)  3/16/2006  
BLD-Framing/Rough-in1/19/20061/20/20061/20/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 1/19/2006 at 3:44:58 PM. Contact: ###-####.
ext. shear ok
BLD-Other1/17/20061/17/20061/17/2006PFAIL
DetailsTony Young
shearing inspection to approve for exterior cover//keil ###-####
need to redo some areas
Override - People Holds  1/17/2006  
BLD-Framing/Rough-in10/17/200510/18/200510/18/2005ACANC
DetailsJim Storey
JIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in7/19/20057/19/20057/19/2005PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 7/19/2005 at 7:39:50 AM. Contact: ###-####.
BLD-Foundation5/19/20055/20/20055/20/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/19/2005 at 3:14:32 PM. Contact: ###-####.
BLD-Footing5/12/20055/13/20055/13/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 5/12/2005 at 10:54:25 AM. Contact: ###-####.
south half ftgs ok, wip 5/13/2005 11:02:38 AM
BLD-Footing5/11/20055/11/20055/11/2005PPART
DetailsDave Hannah
ok to pour north half
(F) Reprint permit  2/14/2005 DONE
Issue PAID IN FULL permit  2/14/2005 DONE
Routing - PLAN CHECK2/10/2005 2/11/2005 PASS
Received Certificate of Value  2/11/2005  
PLANS/APPL TAKEN TO FRONT DESK  2/11/2005 DONE
Print Pending Permit.LaserJet4  2/11/2005 DONE
Case Summary (BLD)  2/11/2005 DONE
Permit Ready to Issue  2/11/2005 DONE
Inspection Record Card- Bld  2/11/2005 DONE
Print Occupancy Form  2/11/2005 DONE
(F) Reprint permit  2/11/2005 DONE
Plan assigned to (M_P)5/4/2004 2/11/2005 PASS
DetailsMike Phillips
2/11/2005 14:38:50 M_P - activity updated through activity BLDA022 from case BLD04-00943.
Routing - PLAN CHECK1/28/2005 2/10/2005  
Routing to planning.
Routing - PLANNING2/10/2005 2/10/2005 PASS
Plans approved for CUP and DRH compliance.
Routing - FIRE1/21/2005 1/28/2005 PASS
resubmittal acceptable.
Plan resubmittals received  1/25/2005  
Received sheet A1.1
Routing - PLAN CHECK12/6/2004 1/21/2005  
Routing to Planning.
Routing - PLANNING1/21/2005 1/21/2005 FAIL
Need amenity clarification on BBQ pit and 22-feet of straight back-up on driveway for Unit #6 and handicap space designated on south property line. kg
Plan resubmittals received  1/20/2005 DONE
Received Transmittal Letter, & 8 Copys of sheets, L1,L2,L3,L4,L5,L6,L7,L8,L9 Taken to Mike P.
Routing - PLANNING12/16/2004 1/7/2005 FAIL
Revised plans needed for compliance with Design Review and Conditional Use approvals. Informed Steve Dresser via phone call on January 6, 2005.
Plan resubmittals received  12/20/2004 DONE
Received two sets of sheets A1.1,A2.1,A2.1A,A3.3,A3.4,A3.5,A3.6,A7.2,E2.1,E2.1,E2.1A,S2.1A,S2.2,S3.1,S6.1 Taken to Mike P.
Routing - PLAN CHECK11/1/2004 12/6/2004 FAIL
Third review failed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Plan resubmittals received  11/23/2004 DONE
Received Transmittal Letter, & 2 Sets of A2.1, A2.1A, A2.2, A2.3, A3.1,A3.1A, A3.2, A3.2A, A3.3, A3.4, A3.5, A3.6, A4.1, E2.1, E2.1A, S1.1, S1.1(A), S2.1, S2.1(A) S2.2, S6.1, S7.1 Tasken to Mike P
Routing - FIRE10/27/2004 11/1/2004 FAIL
No fire resubmittal. Called architect and reviewed resubmittal requirement per 6/23/04 review. He overlooked, will resubmit.
Routing - PLAN CHECK9/7/2004 10/27/2004 FAIL
Second review failed sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Plan resubmittals received  10/25/2004 DONE
Received Transmittal Letter, & 4 Copys of sheets 12 OF 15,13 OF 15,1 OF 1 Taken to Mike Phillips...
Plan resubmittals received  9/30/2004 DONE
Received Transmittal Letter, & 2 Sets of A0.1,A0.2,A0.3,A0.4,A0.5,A0.6,A0.7,A0.8,A0.9,A1.1,A2.1,A2.1A,A2.2,A2.3,A2.4,A2.5,A3.1,A3.1A,A3.2,A3.2AA3.3,A3.4 (2) A3.5 A4.1,A5.1,A5.2,A7.1,A7.2,E2.1,E2.1A,E2.2 Taken to Mike Phillips
Routing - PLANNING8/26/2004 9/7/2004 FAIL
Plans do not comply with CU conditions.

Also, the DR approval requires that the CU conditions be met prior to approval of building permit plans. The Design Review also requires that the landscape plan be revised per Forester's comments.
Plan resubmittals received  9/1/2004 DONE
Received transmittal letter and eight sets of sheet 1 through 15 all taken to Mike P.
Routing - PLAN CHECK8/9/2004 8/26/2004  
DetailsMike Phillips
Routing to planning
Routing - PLUMBING8/3/2004 8/9/2004 PASS
per plan and 2003 UPC
Routing - PLAN CHECK6/24/2004 8/3/2004  
Routing to Plumbing.
Routing - FIRE6/21/2004 6/23/2004 FAIL
Hydrant flow, AS info, FA not provided. Review comments faxed to architect.
Plan Review Completed(1st rev)  6/23/2004 FAIL
failed fire, plumbing and plan check.
Case Summary (BLD)  6/21/2004  
Routing - PLAN CHECK6/4/2004 6/21/2004 FAIL
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing - PLUMBING5/28/2004 6/3/2004 FAIL
please provide a plan showing the items listed above.
Routing - PLANNING5/27/2004 5/28/2004 PEND
Pend Conditional Use Modification approvals.
Routing - Erosion and Sediment  5/27/2004 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS5/12/2004 5/20/2004 PASS
Routing - PLANNING Land Div5/10/2004 5/11/2004 PASS
Approved by ROS03-00009. Recorded ROS 6173 on 5/22/03.
Plans ACCEPTED BY PLAN TECH  5/10/2004 DONE
Plan routing begun/NEW & ADDTN  5/10/2004 DONE
Application received  5/4/2004  
Recd Pcfee & Taken To Pln CK  5/4/2004 DONE