Permit NumberBLD04-00944
StatusFinaled
Name MICHAEL DOTY
Site Address 2440 -2494 N BOGUS BASIN RD
Project NameHIGHLANDS VILLAGE BLD 9
Customer Number 
ePlanReviewNo
Description
2440 & 2442 N Bogus Basin Rd & 2492 & 2494 N Bogus Basin Rd(HIGHLANDS FLOOR PLAN TYPE) To construct a new 13,266 sq.ft. three story, four unit apartment building. The first floor is 4,346 sq.ft. which 2,912 sq.ft. is for the garages, the second floor is 4,440 sq.ft. and the third floor is 4,440 sq.ft. Each unit on the second and thrird floors are single story units, three bedrooms with three bathrooms one full and two 3/4. Note: This building is fire sprinklered per NFPA 13-R for story increase. All construction per the approved plans and attached comment list. MJP DRH 02-240 CUP 02-0141
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD7/18/20077/18/20077/18/2007 DONE
Second Notice has not been responded to.
Second Notice BLD6/21/20076/21/20077/18/2007 DONE
First Notice has not been responded to.
Fee Review-notes5/4/20045/4/20047/18/2007 DONE
First Notice 5/17/20076/21/2007 DONE
Code Occupancy Approval5/17/20075/17/20075/17/2007PPASS
DetailsMichael Garner
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -

1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES

2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM

3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN

4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.

THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
Permanent Occupancy 5/17/20075/17/2007 DONE
Details
Permanent occupancy  5/17/2007 DONE
Perm. Occ. Cert. # 11618 issued 5-17-07 to the Highlands Village Apts.
BLD-Aging Inspection4/11/20074/11/20074/19/2007 PASS
DetailsTony Young
ok for perm c of o when zoning is ok
BLD-Aging Inspection12/15/200612/15/200612/18/2006 PASS
DetailsTony Young
BLD-Aging Inspection10/9/200610/9/200610/13/2006 PASS
DetailsTony Young
BLD-Aging Inspection7/17/20067/17/20067/21/2006 PASS
DetailsTony Young
Temporary occupancy  3/27/2006 DONE
Temp. Occ. Cert. # 5389 issued 3-27-06 to the Highlands Village Apts.
BLD-Final3/24/20063/24/20063/24/2006PPASS
DetailsTony Young
keil ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection3/24/20063/24/20063/24/2006PPASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final3/22/20063/23/20063/23/2006ANR
DetailsTony Young
keil; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
need trades 1st,, no inspection
FIRE-Final Inspection3/22/20063/23/20063/23/2006AFAIL
DetailsForrest France
Fire lane marking is not complete, provide egress illumination at the third and second floor lobby areas, mount fire extinguishers with current tags as discussed, door hardware is missing at the riser room, remove SD covers at all locations and tape and paper at the sprinkler heads in the garages prior to final inspection, provide keys for the knox box.
BLD-Final3/15/20063/17/20063/17/2006PNR
DetailsTony Young
keil ###-####
verbal conf.,, need trades,, no inspection made
FIRE-Final Inspection3/16/20063/17/20063/17/2006AFAIL
DetailsForrest France
Fire extinguishers are not installed, curb painting is not complete, door hardware in some locations is not installed, fire alarm and sprinkler permits must be finaled prior to life safety final, project life safety not ready for inspection at this time.
FIRE-Final Inspection3/15/20063/16/20063/16/2006ACANC
DetailsForrest France
request around 11am///keil ###-#### - cancell intil 3/17/2006
Case Summary (BLD)  3/16/2006  
FIRE-Conference3/8/20063/9/20063/9/2006PDONE
DetailsTroy Cobbley
went over life safety comments with contractor
Override - People Holds  3/8/2006  
BLD-Aging Inspection1/31/20061/31/20062/1/2006 PASS
DetailsTony Young
BLD-Wall cover10/4/200510/5/200510/5/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/4/2005 at 4:22:18 PM. Contact: ###-####.
ok to cover unaffected areas by sprinkler resubmit,, if needed contractor said they would remove any sheet rock if needed
BLD-Conference9/29/20059/30/20059/30/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 9/29/2005 at 3:27:31 PM. Contact: ###-####.
door ?s,, rated or not conflict on plans,, asked him to get architect and plan review to clarify
BLD-Energy code compliance9/15/20059/16/20059/16/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/15/2005 at 12:49:36 PM. Contact: ###-####. second and third floors ok to cover
BLD-Framing/Rough-in9/14/20059/14/20059/14/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 9/14/2005 at 9:30:09 AM. Contact: ###-####.
ok to insulate walls,, need sprinkler sign off prior to lid insulation,,, re-call for energy code prior to any sheet rock for building
BLD-Framing/Rough-in9/1/20059/1/20059/1/2005PFAIL
DetailsTony Young
blake; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
c/n posted,, ext shear ok,, ok to insulate 2nd and 3rd floor walls and tent over sprinklers only,, pending sprinkler sign off
BLD-Wall cover8/26/20058/29/20058/29/2005ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 8/26/2005 at 12:21:53 PM. Contact: ###-####.
FIRE-Conference8/2/20058/3/20058/3/2005ADONE
DetailsForrest France
On site conversation with Jim Williams regarding additional exit signage requirements at the stairway exit discharge.
BLD-Conference7/13/20057/14/20057/14/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 7/13/2005 at 4:15:55 PM. Contact: ###-####.
?s on exit signs,,, referred him to fire/ls inspector
BLD-Conference7/5/20057/6/20057/6/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 7/5/2005 at 4:54:50 PM. Contact: ###-####.
blocking for sheet rock firewall ok
BLD-Conference6/23/20056/24/20056/24/2005ADONE
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie talked about fire wall contractor will get with arc
BLD-Foundation3/29/20053/30/20053/30/2005APASS
DetailsTroy James
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing3/22/20053/23/20053/23/2005APASS
DetailsTroy James
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
(F) Reprint permit  2/14/2005 DONE
Issue PAID IN FULL permit  2/14/2005 DONE
Routing - PLAN CHECK2/10/2005 2/11/2005 PASS
Received Certificate of Value  2/11/2005  
PLANS/APPL TAKEN TO FRONT DESK  2/11/2005 DONE
Print Pending Permit.LaserJet4  2/11/2005 DONE
Case Summary (BLD)  2/11/2005 DONE
Permit Ready to Issue  2/11/2005 DONE
Inspection Record Card- Bld  2/11/2005 DONE
Print Occupancy Form  2/11/2005 DONE
(F) Reprint permit  2/11/2005 DONE
Plan assigned to (M_P)5/4/2004 2/11/2005 PASS
DetailsMike Phillips
2/11/2005 14:42:46 M_P - activity updated through activity BLDA022 from case BLD04-00944.
Routing - PLAN CHECK1/28/2005 2/10/2005  
Routing to planning.
Routing - PLANNING2/10/2005 2/10/2005 PASS
Plans approved for CUP and DRH compliance.
Routing - FIRE1/21/2005 1/28/2005 PASS
resubmittal acceptable.
Plan resubmittals received  1/25/2005  
Received sheet A1.1
Routing - PLAN CHECK12/6/2004 1/21/2005  
Routing to Planning.
Routing - PLANNING1/21/2005 1/21/2005 FAIL
Need amenity clarification on BBQ pit and 22-feet of straight back-up on driveway for Unit #6 and handicap space designated on south property line. kg
Plan resubmittals received  1/20/2005 DONE
Received Transmittal Letter, & 8 Copys of sheets, L1,L2,L3,L4,L5,L6,L7,L8,L9 Taken to Mike P.
Routing - PLANNING12/16/2004 1/7/2005 FAIL
Revised plans needed for compliance with Design Review and Conditional Use approvals. Informed Steve Dresser via phone call on January 6, 2005.
Plan resubmittals received  12/20/2004 DONE
Received two sets of sheets A1.1,A2.1,A2.1A,A3.3,A3.4,A3.5,A3.6,A7.2,E2.1,E2.1,E2.1A,S2.1A,S2.2,S3.1,S6.1 Taken to Mike P.
Routing - PLAN CHECK11/1/2004 12/6/2004 FAIL
Third review failed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Plan resubmittals received  11/23/2004 DONE
Received Transmittal Letter, & 2 Sets of A2.1, A2.1A, A2.2, A2.3, A3.1,A3.1A, A3.2, A3.2A, A3.3, A3.4, A3.5, A3.6, A4.1, E2.1, E2.1A, S1.1, S1.1(A), S2.1, S2.1(A) S2.2, S6.1, S7.1 Tasken to Mike P
Routing - FIRE10/27/2004 11/1/2004 FAIL
No fire resubmittal. Called architect and reviewed resubmittal requirement per 6/23/04 review. He overlooked, will resubmit.
Routing - PLAN CHECK9/7/2004 10/27/2004 FAIL
Second review failed sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Plan resubmittals received  10/25/2004 DONE
Received Transmittal Letter, & 4 Copys of sheets 12 OF 15,13 OF 15,1 OF 1 Taken to Mike Phillips...
Plan resubmittals received  9/30/2004 DONE
Received Transmittal Letter, & 2 Sets of A0.1,A0.2,A0.3,A0.4,A0.5,A0.6,A0.7,A0.8,A0.9,A1.1,A2.1,A2.1A,A2.2,A2.3,A2.4,A2.5,A3.1,A3.1A,A3.2,A3.2AA3.3,A3.4 (2) A3.5 A4.1,A5.1,A5.2,A7.1,A7.2,E2.1,E2.1A,E2.2 Taken to Mike Phillips
Routing - PLANNING8/26/2004 9/7/2004 FAIL
Plans do not comply with CU conditions.

Also, the DR approval requires that the CU conditions be met prior to approval of building permit plans. The Design Review also requires that the landscape plan be revised per Forester's comments.
Plan resubmittals received  9/2/2004 DONE
Received transmittal letter and eight sets of sheet 1 through 15 all taken to Mike P.
Routing - PLAN CHECK8/9/2004 8/26/2004  
DetailsMike Phillips
Routing to planning
Routing - PLUMBING8/3/2004 8/9/2004 PASS
per plan and 2004 UPC
Routing - PLAN CHECK6/24/2004 8/3/2004  
Routing to Plumbing.
Routing - FIRE6/21/2004 6/23/2004 FAIL
Hydrant flow, AS info, FA not provided. Review comments faxed to architect.
Plan Review Completed(1st rev)  6/23/2004 FAIL
failed fire, plumbing and plan check
Case Summary (BLD)  6/21/2004  
Routing - PLAN CHECK6/4/2004 6/21/2004 FAIL
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing Off Site - STRUCTURAL5/10/2004 6/14/2004 FAIL
Contacted PDQ for outside engineering.
Second review required
Routing - PLUMBING5/28/2004 6/3/2004 FAIL
please provide a plan showing the items listed above.
Routing - PLANNING5/27/2004 5/28/2004 PEND
Pend Conditional Use Modification approvals.
Routing - Erosion and Sediment  5/27/2004 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS5/12/2004 5/20/2004 PASS
Routing - PLANNING Land Div5/10/2004 5/11/2004 PASS
Approved by ROS03-00009. Recorded ROS 6173 on 5/22/04.
Plans ACCEPTED BY PLAN TECH  5/10/2004 DONE
Plan routing begun/NEW & ADDTN  5/10/2004 DONE
Application received  5/4/2004  
Recd Pcfee & Taken To Pln CK  5/4/2004 DONE