Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-00954
StatusFinaled
Name LARRY HANSEN
Site Address 1614 S ROOSEVELT ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(NEW STRUCTURAL CMU, STAND ALONE WALL) A "Letter of Compliance" is required for this project. To remove a approximately 9 feet of existing roof & support structure between 4111 W. Overland building and a rear warehouse (formerly part of 4111 Overland) in preparation to create two separate properties, the warehouse to become 1614 S. Roosevelt. To construct a new footing for the CMU wall & special pilaster support footing intergrated with other footing, all to be on same property to be known as 1614 Roosevelt. To construct a new 2-hour fire-resistive (proximity to property line / S1/ VB), reinforced CMU wall, with Pilasters at 13'-4" o.c. maximum. The new wall will also support the existing roof structure at the new location. CMU parapet to extend a minimum of 30" above the roof. To install a ledger at new wall to attach existing roof structure and repair roof cover. Warehouse is enclosed on three sides and open on the east. Permit also covers infill of windows and overhead door in south masonry wall of 4111 Overland with 1-hour fire-resistive construction due to proximity to proposed property line. PC04-259/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/11/20046/11/20046/11/2004PPASS
DetailsTom Arcoraci
ok for lc
Letter of compliance  6/11/2004 DONE
Letter of Compliance issued 6-11-04.
BLD-Final6/8/20046/10/20046/10/2004ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/8/2004 at 2:11:13 PM. Contact: ###-####. needs final letter from mti and blocking installed at tjis 6/10/2004 10:24:40 AM
BLD-Footing5/13/20045/13/20045/13/2004PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/13/2004 at 8:38:36 AM. Contact: ###-####. ok pending eng ok 5/13/2004 3:17:43 PM
Issue PAID IN FULL permit  5/12/2004  
Plan assigned to (DRS)5/5/20045/5/20045/11/2004 PASS
DetailsDan Stuart
5/11/2004 10:18:07 DRS - activity updated through activity BLDA022 from case BLD04-00954.
Routing - Erosion and Sediment5/7/2004 5/11/2004 PASS
ESC approved with conditions attached to plans.
Inspection Record Card- Bld  5/11/2004 DONE
Permit Ready to Issue  5/11/2004 DONE
Telephone call  5/11/2004 DONE
permit ready and fee due
Routing - PLAN CHECK5/11/2004 5/11/2004 PASS
Approved as noted on the plans and attached plan review comments and TBL. 1704.5.1 for Special Inspection of Masonry.
Plan Review Completed(1st rev)  5/11/2004 FAIL
Failed in plan review. Masonry Pilasters shown on architectural plansat wrong spacing per submitted engineering. Also Special Inspection is required for Masonry. I have contacted Eric Wolfe, Pinnacle Eng. to verify requirements and left message for architect to call me on his phone messaging.
PLANS/APPL TAKEN TO FRONT DESK  5/11/2004 PASS
To permit desk for issue.
Telephone call  5/10/2004 DONE
Phone conversation with Larry Sundell to discuss maximum spacing between centers of pilasters. Engineering indicated 13'-4" max. and architectural plan shows one spaced at 14'-9". I agreed to red-line this on the plan if Larry Sundell would verify the owner and contractor are notified of change. I also reviewed the special inspection requirements per my discussion with Eric Wolfe, engineer. I will make the note on the plan and attach a copy of Table 1704.5.1, Level 1 inspection requirements for masonry. Larry will help the owner obtain an approved Special Inspection agency through the Structural Inspector.
Routing - PLANNING5/7/2004 5/7/2004 PASS
Took plan to tempra based on previous discussion and she signed off on them.
Routing - PLAN CHECK5/5/2004 5/7/2004 FAIL
Corrections required. Copy of report faxed to architect.Pending approval by Planning & Errosion Sediment control & Planning.
Telephone call  5/7/2004 DONE
CALL TO ERIC WOLF, PINNACLE ENGINEERS, TO VERIFY REQUIREMENT FOR pILASTER SPACING OF 13'-4" O.C. MAX PER ENGINEERING VS. ARCHITECT SPACING OF 14'-9" FOR ONE LOCATION. NEEDS TO BE 13'-4".
Telephone call  5/7/2004 DONE
CALL TO ERIC WOLF CONCERNING SPECIAL INSPECTION REQUIREMENTS. DETERMINED SPECIAL INSPECTION TO BE BASED ON TABLE 1704.5.1, LEVEL 1 (NONESSENTIAL FACILITIES). I WILL ATTACH A COPY OF THE TABLE TO THE PLANS.
Telephone call  5/7/2004 DONE
CALL TO LARRY SUNDELL TO DISCUSS PLAN REVIEW CORRECTIONS / CLARIFICATIONS NEEDED. HE WAS NOT AVAILABLE SO I LEFT A VOICE MESSAGE TO CALL ME BACK. WILL FAX HIM COPY OF REPORT.
Plans ACCEPTED BY PLAN TECH  5/5/2004 DONE
Application received  5/4/2004  
Recd Pcfee & Taken To Pln CK  5/4/2004  
Fee Review-notes5/4/20045/4/2004