Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/6/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 5/20/2005 | 5/20/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
Case Summary (BLD) | | | 8/1/2005 | | |
|
|
|
|
First Notice | | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/26/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10554 issued 4-26-05 to Evergreen Place.
|
BLD-Final | 4/22/2005 | 4/22/2005 | 4/22/2005 | | PASS |
|
|
|
Final, ok for perm. occ.
|
Permanent Occupancy | | 4/22/2005 | 4/22/2005 | | DONE |
|
|
|
|
BLD-Final | 4/20/2005 | 4/21/2005 | 4/21/2005 | A | CANC |
Jim Sly
|
|
|
randy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Other | 2/3/2005 | 2/3/2005 | 2/3/2005 | | DONE |
|
|
|
Temp. Occ. Cert. extended thru 5-1-05 per letter from JLG.
|
BLD-Final | 10/29/2004 | 11/1/2004 | 11/1/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/29/2004 at 4:59:50 PM. Contact: ###-####. OK for Temp Occ. Need Public works and Code Enforce signatures for Perm......Get Perm Occ status within 90 days of this notice. 11/1/2004 1:28:20 PM
|
Temporary occupancy | | | 11/1/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5161 issued 11-1-04 to Evergreen Place Apts.
|
FIRE-Final Inspection | 10/29/2004 | 10/29/2004 | 10/29/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 10/29/2004 3:48:24 PM
|
Code Occupancy Approval Temp | 10/29/2004 | 10/29/2004 | 10/29/2004 | P | DONE |
Scott M.Brown
|
|
|
BOND POSTED FOR LANDSCAPE TEMP SIGNED OFF 10/29/2004 2:50:19 PM
|
FIRE-Final Inspection | 10/27/2004 | 10/28/2004 | 10/28/2004 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually a conference. I spoke with the superintendant about items I would be looking for at the final inspection. 10/28/2004 2:23:21 PM
|
FIRE-Final Inspection | 10/27/2004 | 10/28/2004 | 10/28/2004 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually a conference. I spoke with the superintendant about items I would be looking for at the final inspection. 10/28/2004 2:23:21 PM
|
BLD-Final | 10/27/2004 | 10/28/2004 | 10/28/2004 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/27/2004 at 4:56:14 PM. Contact: ###-####. Need all signatures. 10/28/2004 3:44:51 PM
|
BLD-Framing/Rough-in | 9/3/2004 | 9/7/2004 | 9/7/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 11:49:00 AM. Contact: ###-####.
|
BLD-Energy code compliance | 9/3/2004 | 9/7/2004 | 9/7/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 11:50:31 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/31/2004 | 8/31/2004 | 8/31/2004 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/31/2004 at 9:06:56 AM. Contact: ###-####. C/N posted. 8/31/2004 3:24:30 PM
|
BLD-Conference | 7/26/2004 | 7/27/2004 | 7/27/2004 | A | PASS |
Jim Sly
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore 1st Conf..... Discussion of Hold downs (Nail to framing member B 4 gyp) Need new listed assembly and detail from Architect for 1hr studded truss in attic. All gyp shear to break on framing member. 7/27/2004 12:31:07 PM
|
BLD-Foundation | 7/16/2004 | 7/16/2004 | 7/16/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/16/2004 at 6:59:22 AM. Foundation wall OK if this is the 4 plex to the north....otherwise disregard. 7/16/2004 1:37:35 PM
|
BLD-Footing | 7/15/2004 | 7/15/2004 | 7/15/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/15/2004 at 7:10:44 AM. Eng pinned for footing location...... Off cole....S of Ustick. 7/15/2004 12:54:01 PM
|
Issue PAID IN FULL permit | | | 7/1/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/29/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/29/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/29/2004 | | DONE |
|
|
|
|
Telephone call | | | 6/29/2004 | | DONE |
|
|
|
permit ready and fee due
|
Routing - PLAN CHECK | 6/23/2004 | | 6/28/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2004 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/28/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/28/2004 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 5/12/2004 | | 6/28/2004 | | PASS |
Mike Phillips
|
|
|
6/28/2004 10:15:41 M_P - activity updated through activity BLDA022 from case BLD04-00963.
|
Plan resubmittals received | | | 6/25/2004 | | DONE |
|
|
|
Received transmittal letter to Mark Pecchenino with two copies of project criteria, one copy of the recorded declaration, one copy of the travel safety plan, two sets of sheets A1.0, A1.2, and one copy of sheets 1 of 1 and 2 of 2 put with plan set by Mark Sanders.
|
Routing - PLANNING | 6/25/2004 | | 6/25/2004 | | PASS |
|
|
|
Approved per revised site plan A1.0 notes and conditions of approval, resubmitted June 25, 2004.
|
Routing - PLANNING | 6/21/2004 | | 6/23/2004 | | FAIL |
|
|
|
Design Review approved per DRH03-128 Modification #1. Pending approval of CU analyst for CUP03-00061.
|
Routing - PLANNING Land Div | 6/23/2004 | | 6/23/2004 | | PASS |
|
|
|
Boomer Subdivision recorded 6/16/04
|
Routing - PLAN CHECK | 6/17/2004 | | 6/21/2004 | | |
|
|
|
|
Plan resubmittals received | | | 6/21/2004 | | DONE |
|
|
|
Received two sheets of L-1 inserted in to plan set by Mark Sanders.
|
Routing - PLANNING | 6/16/2004 | | 6/16/2004 | | FAIL |
|
|
|
Failed, applicant needs revised plans and that comply with P & Z entitlement approvals as well as meeting other stated requirements.CUP03-00061 Mark Pecchenino
|
Plan resubmittals received | | | 6/15/2004 | | DONE |
|
|
|
Received Transmittal Letter, 1 Setof A0.2 ...Taken to Mike Phillips
|
Plan resubmittals received | | | 6/14/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 8 1/2 X 11 sheets ( Roof Girder Truss Support Beam c 2 Sets A0.2 , A1.0 , A2.0 , A3.0 , A4.0 , A4.1 , A4.2 , A8.0 , A9.0 , A10.1 , M1.0 Also received transmittal letter for Marty Santoyo & 1 Set L1.0 Taken to Mike Phillips...
|
Plan Review Completed(1st rev) | | | 6/9/2004 | | DONE |
|
|
|
Fail:
Plan Check
Planning Land Division
|
Routing - FIRE | 6/7/2004 | | 6/9/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/1/2004 | | 6/7/2004 | | FAIL |
|
|
|
Sent correction reqport to architect, requesting additional information be submitted for further review prior to issuing permit.
|
Routing - PLUMBING | 5/28/2004 | | 6/1/2004 | | PASS |
|
|
|
see review comments on bld04-00955
|
Routing - PLANNING | 5/27/2004 | | 5/28/2004 | | FAIL |
|
|
|
DRH03-00128 Marty Santoyo
CUP03-00061 Mark Pecchenino
|
Routing - Erosion and Sediment | 5/21/2004 | | 5/24/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 5/14/2004 | | 5/20/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/17/2004 | | DONE |
|
|
|
Received
1.) Soils Report
2.) Operation & maintenance manuals
2.)Drainage reports
All taken to Mike Phillips.
|
Routing - PLANNING Land Div | 5/12/2004 | | 5/13/2004 | | FAIL |
|
|
|
Need to record final plat of Boomer Sub #SUB03-00043
|
Plan routing begun/NEW & ADDTN | | | 5/12/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/12/2004 | | DONE |
|
|
|
Needs drainage calcs. & Soils report or O&M manual.
|
Application received | | | 5/5/2004 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/12/2004 | | | | |
|
|
|
Contacted PDQ for outside delivery.
|