Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-00963
StatusFinaled
Name EVERGREEN PLACE
Site Address 7586 W TOTTENHAM LN
Project NameEVERGREEN PLACE
Customer Number 
ePlanReviewNo
Description
EVERGREEN PLACE (BLD "F") * To construct a new 5,168 sq.ft. two story, three bedroom, two bath four unit apartment building. Each unit is 1,150 sq.ft. with a 60 sq.ft. covered deck and a 30 sq.ft. storage room. All construction per the approved plans and attached comment list. NOTE: This permit does not include the installation of the picinic shelter. MJP DRH 03-00128 CUP 03-061
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/6/2005 DONE
Second Notice has not been responded to.
Second Notice BLD5/20/20055/20/200512/6/2005 DONE
First Notice has not been responded to.
Case Summary (BLD)  8/1/2005  
First Notice 4/26/20055/20/2005 DONE
Permanent occupancy  4/26/2005 DONE
Perm. Occ. Cert. # 10554 issued 4-26-05 to Evergreen Place.
BLD-Final4/22/20054/22/20054/22/2005 PASS
Final, ok for perm. occ.
Permanent Occupancy 4/22/20054/22/2005 DONE
Details
BLD-Final4/20/20054/21/20054/21/2005ACANC
DetailsJim Sly
randy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Other2/3/20052/3/20052/3/2005 DONE
Temp. Occ. Cert. extended thru 5-1-05 per letter from JLG.
BLD-Final10/29/200411/1/200411/1/2004PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/29/2004 at 4:59:50 PM. Contact: ###-####. OK for Temp Occ. Need Public works and Code Enforce signatures for Perm......Get Perm Occ status within 90 days of this notice. 11/1/2004 1:28:20 PM
Temporary occupancy  11/1/2004 DONE
Temp. Occ. Cert. # 5161 issued 11-1-04 to Evergreen Place Apts.
FIRE-Final Inspection10/29/200410/29/200410/29/2004APASS
DetailsTroy Cobbley
Fire life safety finaled 10/29/2004 3:48:24 PM
Code Occupancy Approval Temp10/29/200410/29/200410/29/2004PDONE
DetailsScott M.Brown
BOND POSTED FOR LANDSCAPE TEMP SIGNED OFF 10/29/2004 2:50:19 PM
FIRE-Final Inspection10/27/200410/28/200410/28/2004PFAIL
DetailsTroy Cobbley
Inspection was actually a conference. I spoke with the superintendant about items I would be looking for at the final inspection. 10/28/2004 2:23:21 PM
FIRE-Final Inspection10/27/200410/28/200410/28/2004PFAIL
DetailsTroy Cobbley
Inspection was actually a conference. I spoke with the superintendant about items I would be looking for at the final inspection. 10/28/2004 2:23:21 PM
BLD-Final10/27/200410/28/200410/28/2004PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/27/2004 at 4:56:14 PM. Contact: ###-####. Need all signatures. 10/28/2004 3:44:51 PM
BLD-Framing/Rough-in9/3/20049/7/20049/7/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/3/2004 at 11:49:00 AM. Contact: ###-####.
BLD-Energy code compliance9/3/20049/7/20049/7/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/3/2004 at 11:50:31 AM. Contact: ###-####.
BLD-Framing/Rough-in8/31/20048/31/20048/31/2004PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/31/2004 at 9:06:56 AM. Contact: ###-####. C/N posted. 8/31/2004 3:24:30 PM
BLD-Conference7/26/20047/27/20047/27/2004APASS
DetailsJim Sly
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore 1st Conf..... Discussion of Hold downs (Nail to framing member B 4 gyp) Need new listed assembly and detail from Architect for 1hr studded truss in attic. All gyp shear to break on framing member. 7/27/2004 12:31:07 PM
BLD-Foundation7/16/20047/16/20047/16/2004APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/16/2004 at 6:59:22 AM. Foundation wall OK if this is the 4 plex to the north....otherwise disregard. 7/16/2004 1:37:35 PM
BLD-Footing7/15/20047/15/20047/15/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/15/2004 at 7:10:44 AM. Eng pinned for footing location...... Off cole....S of Ustick. 7/15/2004 12:54:01 PM
Issue PAID IN FULL permit  7/1/2004 DONE
Permit Ready to Issue  6/29/2004 DONE
Inspection Record Card- Bld  6/29/2004 DONE
Print Occupancy Form  6/29/2004 DONE
Telephone call  6/29/2004 DONE
permit ready and fee due
Routing - PLAN CHECK6/23/2004 6/28/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/28/2004 DONE
Print Pending Permit.LaserJet4  6/28/2004 DONE
Case Summary (BLD)  6/28/2004 DONE
Plan assigned to (M_P)5/12/2004 6/28/2004 PASS
DetailsMike Phillips
6/28/2004 10:15:41 M_P - activity updated through activity BLDA022 from case BLD04-00963.
Plan resubmittals received  6/25/2004 DONE
Received transmittal letter to Mark Pecchenino with two copies of project criteria, one copy of the recorded declaration, one copy of the travel safety plan, two sets of sheets A1.0, A1.2, and one copy of sheets 1 of 1 and 2 of 2 put with plan set by Mark Sanders.
Routing - PLANNING6/25/2004 6/25/2004 PASS
Approved per revised site plan A1.0 notes and conditions of approval, resubmitted June 25, 2004.
Routing - PLANNING6/21/2004 6/23/2004 FAIL
Design Review approved per DRH03-128 Modification #1. Pending approval of CU analyst for CUP03-00061.
Routing - PLANNING Land Div6/23/2004 6/23/2004 PASS
Boomer Subdivision recorded 6/16/04
Routing - PLAN CHECK6/17/2004 6/21/2004  
Plan resubmittals received  6/21/2004 DONE
Received two sheets of L-1 inserted in to plan set by Mark Sanders.
Routing - PLANNING6/16/2004 6/16/2004 FAIL
Failed, applicant needs revised plans and that comply with P & Z entitlement approvals as well as meeting other stated requirements.CUP03-00061 Mark Pecchenino
Plan resubmittals received  6/15/2004 DONE
Received Transmittal Letter, 1 Setof A0.2 ...Taken to Mike Phillips
Plan resubmittals received  6/14/2004 DONE
Received Transmittal Letter, 2 8 1/2 X 11 sheets ( Roof Girder Truss Support Beam c 2 Sets A0.2 , A1.0 , A2.0 , A3.0 , A4.0 , A4.1 , A4.2 , A8.0 , A9.0 , A10.1 , M1.0 Also received transmittal letter for Marty Santoyo & 1 Set L1.0 Taken to Mike Phillips...
Plan Review Completed(1st rev)  6/9/2004 DONE
Fail:
Plan Check
Planning Land Division
Routing - FIRE6/7/2004 6/9/2004 PASS
Routing - PLAN CHECK6/1/2004 6/7/2004 FAIL
Sent correction reqport to architect, requesting additional information be submitted for further review prior to issuing permit.
Routing - PLUMBING5/28/2004 6/1/2004 PASS
see review comments on bld04-00955
Routing - PLANNING5/27/2004 5/28/2004 FAIL
DRH03-00128 Marty Santoyo
CUP03-00061 Mark Pecchenino
Routing - Erosion and Sediment5/21/2004 5/24/2004 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS5/14/2004 5/20/2004 PASS
Plan resubmittals received  5/17/2004 DONE
Received
1.) Soils Report
2.) Operation & maintenance manuals
2.)Drainage reports
All taken to Mike Phillips.
Routing - PLANNING Land Div5/12/2004 5/13/2004 FAIL
Need to record final plat of Boomer Sub #SUB03-00043
Plan routing begun/NEW & ADDTN  5/12/2004 DONE
Plans ACCEPTED BY PLAN TECH  5/12/2004 DONE
Needs drainage calcs. & Soils report or O&M manual.
Application received  5/5/2004  
Routing Off Site - STRUCTURAL5/12/2004    
Contacted PDQ for outside delivery.