Chinden Vanilla Retail (Shell & Core) - To construct a new 3535 square foot, one story pre-engineered steel retail shell and core building and related site improvements. This is a shell and core permit only. There is no occupancy allowed under this permit. There will be three future retail tenant space in this building; tenant spaces #1 & #3 are 1290 square feet and tenant space #2 is 870 square feet. The tenant spaces are being completed to a vanilla finish. When the future tenants have been determined, if no additional work is done, an MIS permit will be required for each tenant space to establish a Certificate of Occupancy for that space. All construction per the approved plans and attached comment list. DRH02-86/CUP01-00168/#04-296/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/8/2005 DONE
Over a year old and couldn't find current phone #
Second Notice BLD9/21/20059/21/200512/6/2005 DONE
First Notice has not been responded to.
Telephone call  12/1/2005 DONE
Fax to Leny (Buss) plm sub regardig difference i fial value///12/01/05 BAS
First Notice 9/30/20059/30/2005 DONE
Second Notice 9/30/20059/30/2005 DONE
Third Notice 9/30/20059/30/2005 DONE
First Notice 4/26/20059/21/2005 DONE
BLD-Final12/12/200412/13/200412/13/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/12/2004 at 5:16:09 PM. Contact: ###-####. C/C issued. 12/13/2004 11:15:53 AM
DOC - Permit Finaled12/13/200412/13/200412/13/2004APASS
DetailsJim Sly
Finaled by inspector at 12/13/2004 11:16:01 AM
FIRE-Final Inspection12/9/200412/10/200412/10/2004APASS
DetailsTroy Cobbley
Fire life safety finaled. I notified builder, and showed him the notes, that exit discharge lighting will be required prior to finaling the tenant improvements. 12/10/2004 8:54:54 AM
Code Occupancy Approval12/10/200412/10/200412/10/2004PPASS
DetailsScott M.Brown
FINAL SIGNED OFF 12/10/2004 12:03:05 PM
BLD-Final12/7/200412/9/200412/9/2004ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/7/2004 at 12:37:52 PM. Contact: ###-####. Need all Req finals. 12/9/2004 10:47:32 AM
PubWorks Occupancy Approval12/8/200412/8/200412/8/2004 DONE
Drainage project complete, signed permanent occupancy 12/08/04. R.Rokovitz
BLD-Framing/Rough-in10/14/200410/14/200410/14/2004PPASS
DetailsJim Sly
ceiling grid ron ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Grid OK. 10/14/2004 2:56:06 PM
BLD-Framing/Rough-in10/13/200410/13/200410/13/2004PNR
DetailsJim Sly
grid ceiling inspection please///ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need to have lights tied off. 10/13/2004 2:04:58 PM
BLD-Framing/Rough-in10/4/200410/5/200410/5/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/4/2004 at 10:44:13 AM. Special insp bolting inspected and OK'd by Strata Rule Steel Tanks... AISC Certified as steel fabricator OK 10/5/2004 9:44:52 AM
BLD-Other9/10/20049/13/20049/13/2004APART
DetailsJim Sly
shane - Note: exterior sheeting inspect; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Ext. Sheathing OK. 9/13/2004 10:51:41 AM
BLD-Framing/Rough-in9/8/20049/10/20049/10/2004APART
DetailsJim Sly
shane; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N Verify approval and special insp for steel at fab shop.....need special insp of bolting prior to final frame insp. Complete sheathing and re-call. 9/10/2004 12:15:31 PM
BLD-Foundation8/19/20048/20/20048/20/2004APASS
DetailsJim Sly
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore NEXT TO KFC 8/20/2004 10:40:37 AM
BLD-Footing8/16/20048/17/20048/17/2004APASS
DetailsJim Sly
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 2500 psi 8/17/2004 10:27:52 AM
(F) Reprint permit  8/4/2004  
Plan assigned to (JCM)5/12/2004 8/3/2004 PASS
DetailsJohn Menard
8/3/2004 09:39:40 JCM - activity updated through activity BLDA022 from case BLD04-00999.
Routing - PLAN CHECK6/18/2004 8/3/2004 PASS
Routing Off Site - STRUCTURAL8/2/2004 8/3/2004 PASS
Called PDQ for pick -up... Received a fax from the consulting structural engineer approving the resubmittals. JCM
PLANS/APPL TAKEN TO FRONT DESK  8/3/2004 DONE
Inspection Record Card- Bld  8/3/2004 DONE
Permit Ready to Issue  8/3/2004 DONE
Telephone call  8/3/2004 DONE
left a message for Tim -- permit is ready.
Issue PAID IN FULL permit  8/3/2004 DONE
Plan resubmittals received  8/2/2004 DONE
Received Transmittal Letter, 3 Sets of metal building structural information, 3 Sets structural calcs, 3 Sets revised sheet A3.0 Taken to John Menard...
Routing Off Site - STRUCTURAL7/22/2004 7/23/2004 FAIL
Called PDQ for pick up RAD Received comment list from consulting structural engineer requesting additional revisions. JCM
Plan resubmittals requested  7/23/2004  
Faxedthe project engineer a copy of the second comment list from the consulting structural engineer requesting additional revisions. JCM
Routing Off Site - STRUCTURAL7/12/2004 7/23/2004 FAIL
Called PDQ for pick up
Plan resubmittals received  7/21/2004 DONE
Received Transmittal Letter,3 Plan Review Comments, 1 Set of S1.0 Taken to John Menard
Plan Reviewer's activity  7/19/2004  
Called project structural engineer to determine if he had received a copy of the comment list from the consulting structural engineer. He indicated he had not, so I faxed him a copy. He said he would respond quickly.
Plan resubmittals received  7/9/2004 DONE
Received transmittal letter with three sets of structural calculations taken to John M.
Plan Reviewer's activity  6/30/2004 PASS
Reviewed and approved resubmitted plans with red lined notes. JCM
Telephone call  6/30/2004 DONE
Camilla said they are working on getting the structural calcs.
Plan resubmittals received  6/22/2004 DONE
Received Transmittal Letter, 2 Sets of A1.1 & A10.0 Also 3 Sets of 18x24 S-1 ,S-2 , S-3 , S-4 , S-5 Taken to John Menard...
Routing - PUBLIC WORKS6/15/2004 6/18/2004 PASS
Routing - PLAN CHECK6/7/2004 6/15/2004  
Plan Review Completed(1st rev)  6/7/2004 FAIL
Failed public works, plan check, structural and plumbing.
Routing - FIRE6/2/2004 6/4/2004 PASS
Routing - PLAN CHECK5/28/2004 6/2/2004 FAIL
Plan resubmittals requested  6/2/2004  
Mailed the architect a copy of the plan review comment list and structural comment list requesting revisions. JCM
Routing - PLUMBING5/27/2004 5/28/2004 FAIL
please provide a plan showing the size and location of the site sewer and water services.
Routing - PLUMBING5/28/2004 5/28/2004 PASS
site utilities were installed during previous site construction.
Routing - PLANNING5/24/2004 5/25/2004 PASS
Sarah Schafer DRH02-00086
Susan Riggs CUP01-00168

Approved per DRH02-86 and mod. #1. Will pass drawings on to Susan Riggs for CUP review.
Routing - PUBLIC WORKS5/17/2004 5/24/2004 FAIL
Failed in drainage. Brian called Chad at B & A Engineers on 5/19/04.
Routing - Erosion and Sediment5/24/2004 5/24/2004 PASS
ESC approved with conditons attached to plans.
Routing Off Site - STRUCTURAL5/13/2004 5/18/2004 FAIL
Received comment list from consulting structural engineer requesting revision. This building requires submittal of pre-engineered building plans. JCM
Routing - PLANNING Land Div5/12/2004 5/14/2004 PASS
Approved. Lot 1, Block 1 of Target Subdivision.
Plans ACCEPTED BY PLAN TECH  5/12/2004 DONE
These Plans need Civel plans,2 Drainage reports, & 2 O & M Manuals ...DLD
Application received  5/10/2004  
Recd Pcfee & Taken To Pln CK  5/10/2004 DONE
Fee Review-notes5/10/20045/10/2004