BLD-Final | 11/4/2004 | 11/5/2004 | 11/5/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/4/2004 at 1:25:42 PM. Contact: ###-####.
|
DOC - Permit Finaled | 11/5/2004 | 11/5/2004 | 11/5/2004 | A | PASS |
Troy James
|
|
|
Finaled by inspector at 11/5/2004 9:35:51 AM
|
BLD-Final | 11/3/2004 | 11/4/2004 | 11/4/2004 | A | FAIL |
Troy James
|
|
|
bob; Phone #: ###-#### Note: Please call 1/2 hr prior to inspection Internet Inspection Request from: Cathy Chiles
Need to seal interior electrical boxes on the exterior walls. Seal line set through foundation and seal hole at sub panel rear of garage. 11/4/2004 10:59:28 AM
|
BLD-Grading Inspection | 11/3/2004 | 11/3/2004 | 11/3/2004 | | DONE |
|
|
|
Final grading and drainage approved.
|
BLD-Wall cover | 8/4/2004 | 8/4/2004 | 8/4/2004 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/4/2004 at 7:49:42 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/3/2004 | 8/3/2004 | 8/3/2004 | P | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/3/2004 at 7:12:17 AM. Contact: ###-####. On the verge of writing a reinspection fee. 8/3/2004 1:04:20 PM
|
BLD-Framing/Rough-in | 8/2/2004 | 8/2/2004 | 8/2/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 8/2/2004 at 8:26:54 AM. Contact: ###-####. Provide the required nailing to trusss A1 two ply truss. Ok to insulate. 8/2/2004 12:54:13 PM
|
BLD-Framing/Rough-in | 7/29/2004 | 7/30/2004 | 7/30/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/29/2004 at 8:01:08 AM. Contact: ###-####. Need to strap top plates at beams in garage. Need truss calcs. 7/30/2004 11:11:20 AM
|
BLD-Other | 7/20/2004 | 7/21/2004 | 7/21/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/20/2004 at 11:59:29 AM. Contact: ###-####.c/n posted 7/21/2004 12:33:29 PM
|
BLD-Other | 7/14/2004 | 7/15/2004 | 7/15/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/14/2004 at 5:13:18 PM. Contact: ###-####.shear inspection
Told contractor to go throughout house. Too many places missing the required nailing. 7/15/2004 1:35:44 PM
|
BLD-Foundation | 6/7/2004 | 6/8/2004 | 6/8/2004 | P | FAIL |
Troy James
|
|
|
mark ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Need detail drawing or approval from engineer on the steel columns embedded in foundation wall. 6" steel column in 8" wall. 6/8/2004 2:16:38 PM
|
BLD-Footing | 6/2/2004 | 6/3/2004 | 6/3/2004 | A | PART |
Tony Young
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Grading Inspection | 5/28/2004 | 5/28/2004 | 5/28/2004 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade approved by the geotechnical engineer.
|
Issue PAID IN FULL permit | | | 5/27/2004 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 5/25/2004 | 5/25/2004 | 5/25/2004 | | DONE |
Dan Overy
|
|
|
|
Case Summary (BLD) | | | 5/25/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 5/25/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/25/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/25/2004 | | |
|
|
|
|
Telephone call | | | 5/25/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Pending Assignment by DJO | 5/11/2004 | | 5/25/2004 | | DONE |
Dan Overy
|
|
|
5/25/2004 15:12:45 DJO - activity updated through activity BLDA169 from case BLD04-01006.
|
Plans ACCEPTED BY PLAN CHECK | | | 5/25/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2004 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/18/2004 | | 5/19/2004 | | PASS |
|
|
|
ESC approved with conditons attached to plans.
|
Routing - FIRE | 5/19/2004 | | 5/19/2004 | | DONE |
|
|
|
No fire sprinklers required (Highlands Hackberry #4 sub.)
|
Routing - PLANNING | 5/18/2004 | | 5/18/2004 | | PASS |
|
|
|
O.K. per revised driveway as indicated on site plan.
|
Routing - PLANNING | 5/12/2004 | | 5/13/2004 | | FAIL |
|
|
|
Driveway needs to have 3' landscape area between edge of paving and property line. Spoke w/ Gabe of Gabrielli Builds. He is faxing info to justify driveway through setback in a non-perpendicular manner. CER 11:00 5/13/04
|
Routing - PUBLIC WORKS | 5/12/2004 | | 5/12/2004 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 5/11/2004 | | 5/12/2004 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter from Boise Public Works attached to the plans.
|
Application received | | | 5/11/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 5/20/2004 | | | | |
|
|
|
|