Third Notice BLD | 12/7/2005 | 12/7/2005 | 12/16/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice | | 5/20/2005 | 12/7/2005 | | DONE |
|
|
|
|
First Notice | | 8/12/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/11/2004 | 8/11/2004 | | DONE |
|
|
|
|
BLD-Final | 8/11/2004 | 8/11/2004 | 8/11/2004 | | DONE |
|
|
|
Final approved per Jim Storey & Jim Sly in conversation with Jason Blais
|
Permanent occupancy UNPAID FEE | | | 8/11/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10257 issued 8-11-04 to Nutri-Vet Nutritionals.
|
BLD-Final | 8/4/2004 | 8/5/2004 | 8/5/2004 | A | FAIL |
Jim Sly
|
|
|
Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes C/N still pending.....Need Sprinkler room Ext wall insulated or need paperwork on site to justify that meets energy code W/O insul. Called Ron left message....His voice mail recorder sounds messed up? 8/5/2004 4:05:22 PM
|
BLD-Final | 8/4/2004 | 8/4/2004 | 8/4/2004 | P | CANC |
Jim Storey
|
|
|
Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes out of time. 8/4/2004 4:55:51 PM
|
BLD-Final | 7/30/2004 | 8/2/2004 | 8/2/2004 | A | FAIL |
Jim Storey
|
|
|
Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes insp. pipe support/ 8/2/2004 9:56:36 AM u-value fror bi-fold doors and aux sprinkler piping tpo framing in warehouse. 8/2/2004 10:19:59 AM
|
Plan Reviewer's activity | | | 8/2/2004 | | |
|
|
|
Gayle Jensen has requested that the energy code envelope be re-routed around the equipment room (shown as a closet on plan) so the room will be insulated to R-11 minimum. Based on the statement from Gayle, that the existing building has 10% or less of window and glazed door area, Table 802.2(28) has a prescriptive path allowing ANY U-factor for the doors at this room. Nonglazed doors are to meet the requirements for windows and glazed doors per IECC Section 802.2.2.
|
FIRE-Final Inspection | 7/21/2004 | 7/22/2004 | 7/22/2004 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled 7/22/2004 8:33:19 AM
|
FIRE-Alarm Testing | 7/15/2004 | 7/15/2004 | 7/15/2004 | P | PASS |
Troy Cobbley
|
|
|
fire alarm portion of the correction list has been corrected 7/15/2004 3:59:33 PM
|
FIRE-Final Inspection | 7/12/2004 | 7/13/2004 | 7/13/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification that the annual inspection for the sprinkler system will be done this month. Provide door hardware for the new offices. Relocate the smoke detector to be above the fire alarm panel and change the horn/strobe to a horn. City approved plans not required for this work but inspection for function will be required. 7/13/2004 9:48:45 AM
|
BLD-Framing/Rough-in | 7/1/2004 | 7/1/2004 | 7/1/2004 | P | PART |
Jim Storey
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore need mech permit and insp. ceilling ok pending mech. 7/1/2004 5:06:37 PM
|
BLD-Framing/Rough-in | 6/17/2004 | 6/18/2004 | 6/18/2004 | A | PASS |
Jim Sly
|
|
|
RON; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Pinnacle Eng... Pat VanKleek provided letter of approval for Epoxy bolting, Shear wall as built (a change from plans), 6x6 headrs, and double 2x4 (guard) posts in leiu of (1) 4x4 post. Stamped letter of approval provided.. 6/18/2004 11:43:53 AM 6/18/2004 11:47:30 AM
|
BLD-Framing/Rough-in | 6/16/2004 | 6/16/2004 | 6/16/2004 | P | FAIL |
Jim Storey
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c/n on site not per engineered plan/no si record /start over. 6/16/2004 4:43:03 PM
|
Issue PAID IN FULL permit | | | 6/9/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/7/2004 | | 6/7/2004 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2004 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 6/7/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/7/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/7/2004 | | DONE |
|
|
|
|
Telephone call | | | 6/7/2004 | | DONE |
|
|
|
spoke with Gayle and told him that permit is ready & fees///6/7/04 2:05pm BAM
|
Plan assigned to (JCB) | 5/14/2004 | | 6/7/2004 | | PASS |
Jason Blais
|
|
|
6/7/2004 11:11:09 JCB - activity updated through activity BLDA022 from case BLD04-01019.
|
Routing - FIRE | 6/2/2004 | | 6/4/2004 | | PASS |
|
|
|
|
1st review completed | | | 6/4/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/20/2004 | | 6/2/2004 | | PEND |
|
|
|
When approved by Fire Dept. a permit can be issued. Plans to route to Fire Dept.
|
Routing - PLANNING | 5/18/2004 | | 5/20/2004 | | PASS |
|
|
|
Approved per building permit plans.
|
Routing - PUBLIC WORKS | 5/14/2004 | | 5/17/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/13/2004 | | DONE |
|
|
|
$ < 25,000.00 Certiticate of value is marked for MEC but the plans do not reflect them..///dld
|
Application received | | | 5/11/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/11/2004 | | DONE |
|
|
|
|
Fee Review-notes | 5/11/2004 | 5/11/2004 | | | |
|
|
|
|