Micron Building #1X - Install (SOD) Bulk Chemical Feed System * To install an 8" diameter fume exhaust duct from Drum Unload Room #107D to an existing 14" diameter fume exhaust duct above Cooridor #100J. This new 8' duct will be continuously wrapped with a two-hour fire-resistive rated #M Firemaster duct wrap. The duct will be protected with a fire sprinkler quench system at the pentration of the two-hour fire barrier wall. This quench system is an approved alternate to the required shaft enclosure approved by the Building & Fire Department (see copy of attached alternate approval). All construction per the approved plans. #04-304/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/20/20055/20/200512/9/2005 DONE
Second Notice has not been responded to.///Over a year old No final values
Case Summary (BLD)  8/31/2005 DONE
Case Summary (BLD)  8/31/2005 DONE
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice Sent 12/14/20044/26/2005 DONE
Letter of compliance  12/17/2004 DONE
Letter of Compliance issued 12-17-04.
DOC - Permit Finaled12/14/200412/14/200412/14/2004APASS
DetailsJim Storey
Finaled by inspector at 12/14/2004 8:29:26 AM
FIRE-Final Inspection12/13/200412/14/200412/14/2004APASS
DetailsRick Jackson
Internet Inspection Request from: Wayne Berry Fire/life safety okay for final 12/14/2004 8:09:09 AM
BLD-Final12/13/200412/14/200412/14/2004APASS
DetailsJim Storey
Jim...Rick is also scheduled to do his Life Safety final durring the same time slot...may want to check with him on timing! Internet Inspection Request from: Wayne Berry
BLD-Final12/7/200412/7/200412/7/2004APASS
DetailsJim Storey
Internet Inspection Request from: Wayne Berry final ok si in archive. 12/7/2004 11:24:52 AM
BLD-Final12/1/200412/2/200412/2/2004ACANC
DetailsJim Storey
Internet Inspection Request from: Wayne Berry Inspection cancelled from web by: Wayne Berry
FIRE-Final Inspection12/1/200412/2/200412/2/2004ACANC
DetailsRick Jackson
Internet Inspection Request from: Wayne Berry Inspection cancelled from web by: Wayne Berry
Case Summary (BLD)  8/26/2004 DONE
BLD-Final7/7/20047/8/20047/7/2004ACANC
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Wayne Berry Inspection cancelled from web by: Wayne Berry
Issue & PRINT to be Invoiced  6/24/2004 DONE
Routing - FIRE6/18/2004 6/23/2004 PASS
resubmittal information acceptable per telcon with Micron staff.
Routing - PLAN CHECK6/23/2004 6/23/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/23/2004 DONE
Inspection Record Card- Bld  6/23/2004 DONE
Permit Ready to Issue  6/23/2004 DONE
Telephone call  6/23/2004 DONE
permit ready and fee due notified by email
Plan assigned to (JCM)5/12/2004 6/23/2004 PASS
DetailsJohn Menard
6/23/2004 13:24:17 JCM - activity updated through activity BLDA022 from case BLD04-01022.
Routing - PLAN CHECK5/27/2004 6/18/2004  
Plan resubmittals received  6/18/2004 DONE
Received from Sam R. transmittal form Micron, material safety data sheets, hand written notes. Taken to John M.
Plan Review Completed(1st rev)  5/27/2004 FAIL
failed fire.
Routing - FIRE5/21/2004 5/27/2004 FAIL
Need to clarify scope of work and verify code adequacy of Flam Liq occupancy. Called P. Marcolina to discuss, n/a-left voice message and request to call back to discuss. No further review done at this time.
Plan Reviewer's activity  5/21/2004 PASS
Plans approved as submitted. JCM
Routing - PLAN CHECK5/20/2004 5/21/2004 PASS
Routing - PUBLIC WORKS5/14/2004 5/19/2004 PASS
Plans ACCEPTED BY PLAN TECH  5/14/2004 DONE
Application received  5/11/2004  
Fee Review-notes5/11/20045/11/2004