Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-01048
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 1065 S ALLANTE PL
Project NameKeller Williams Realty
Customer Number 
ePlanReviewNo
Description
Keller Williams Realty - To construct a new 16,890 square foot, two story wood framed office building and related site improvements. This building is fully fire sprinklered. The sprinklers are used for area increase and story increase. First Floor: 12,810 sq. ft. Second Floor: 4080 sq. ft.. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/14/2005 DONE
Second Notice has not been responded to.
Second Notice BLD5/20/20055/20/200512/6/2005 DONE
First Notice has not been responded to.
Telephone call  11/3/2005 DONE
Left message for Mike (dave evans) again asking about final value with the water & sewer///11/3/05 11:30am BAS
Telephone call  10/31/2005 DONE
Left message for Mike (with Dave Evans Construction) needing to know final value for PLM as I don't think Sewer & Water were included in there final value////10/31/05 BAS
First Notice 5/5/20055/20/2005 DONE
Code Occupancy Approval5/5/20055/5/20055/5/2005PPASS
DetailsScott M.Brown
FINAL SIGNED AND RELEASE OF BOND 5/5/2005 2:41:04 PM
Permanent Occupancy 5/5/20055/5/2005 DONE
Details
Permanent occupancy UNPAID FEE  5/5/2005 DONE
Perm. Occ. Cert. # 10573 issued 5-5-05 to Keller Williams Realty.
FIRE-Final Inspection4/11/20054/12/20054/12/2005APASS
DetailsForrest France
###-#### Robbie Fire alarm, life safety, and fire sprinkler finaled.
BLD-Final4/11/20054/12/20054/12/2005PPART
DetailsJim Sly
###-#### Robbie OK for Temp Occ. Bonded for Landscaping.....Obtain Perm Occ status within 90 days of this notice. OK for Perm Occ apon verification that Code inforce/landscaping OKd for Perm Occ. 4/12/2005 5:01:28 PM
FIRE-Final Inspection4/8/20054/11/20054/11/2005ACANC
DetailsTroy Cobbley
robie -###-####
BLD-Final4/8/20054/11/20054/11/2005PCANC
DetailsJim Sly
robie-- ###-#### Canc by Contractor. 4/11/2005 4:24:14 PM
FIRE-Final Inspection4/7/20054/8/20054/8/2005AFAIL
DetailsForrest France
Provide two additional exit signs as discussed and shown on plans, Provide emergency discharge lighting listed for below 32 degrees, Provide building plan review notes
BLD-Final4/7/20054/8/20054/8/2005PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/7/2005 at 5:14:22 PM. Contact: ###-####.
BLD-Final4/7/20054/7/20054/7/2005PNR
DetailsTom Arcoraci
robbie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Conference3/3/20053/4/20053/4/2005ADONE
DetailsTroy James
troy scheduled with contractor 8:30 am 3/3/2005 4:27:02 PM
1 hour stair exiting assembly shown on plans and approved. Assembly does not meet 1 hr because contractor will install two layers of 5/8" rock at ceiling of corridor. John Menard approved design because 1 hr assembly is not required per code. 3/4/2005 9:05:02 AM
BLD-Wall cover3/4/20053/4/20053/4/2005PPART
DetailsTroy James
Robby; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok modified 1hr assembly at stairs see previous inspection for clarification 3/4/2005 3:18:20 PM
BLD-Framing/Rough-in3/3/20053/3/20053/3/2005PPART
DetailsTroy James
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover, except for area at 1 hour stairs to see assembly 3/3/2005 3:36:16 PM
BLD-Framing/Rough-in3/1/20053/2/20053/2/2005PFAIL
DetailsTroy James
robie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n posted 3/2/2005 4:11:59 PM
BLD-Wall cover2/23/20052/24/20052/24/2005APART
DetailsLane Manuel
Wall cover on Second Floor Only; Phone #: ###-#### Internet Inspection Request from: Robbie Miller
energy insp. ok. R-19 walls 2/24/2005 9:14:16 AM
BLD-Framing/Rough-in2/22/20052/23/20052/23/2005APART
DetailsDave Hannah
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore second level ok to insulate 2/23/2005 1:06:22 PM
BLD-Framing/Rough-in2/15/20052/16/20052/16/2005ACANC
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/15/2005 at 3:21:42 PM. Contact: ###-####.
no mechanical/elec/fire approval 2/17/2005 8:35:39 AM
BLD-Wall cover2/9/20052/10/20052/10/2005APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/9/2005 at 4:46:20 PM. Contact: ###-####.
north/west wing ok for cover. 2/10/2005 12:03:13 PM
BLD-Wall cover2/9/20052/9/20052/9/2005PFAIL
DetailsTroy James
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore still need fire inspection passed 2/9/2005 4:20:46 PM
BLD-Energy code compliance2/7/20052/8/20052/8/2005PCANC
DetailsLane Manuel
roby; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
need fire insp. approval for cover 2/8/2005 2:52:04 PM
BLD-Wall cover2/7/20052/8/20052/8/2005PCANC
DetailsLane Manuel
roby; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in2/2/20052/3/20052/3/2005APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 2/2/2005 at 4:21:35 PM. Contact: ###-####.
west wing ok to cover pending fire insp., and elec. insp. approval. 2/3/2005 11:15:55 AM
BLD-Framing/Rough-in2/1/20052/2/20052/2/2005PCANC
DetailsLane Manuel
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
failed elect. insp. Needs to reschedule. 2/2/2005 4:26:26 PM
BLD-Framing/Rough-in1/26/20051/27/20051/27/2005APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 1/26/2005 at 3:16:29 PM. Contact: ###-####.
East wing soffit/eave framing ok per approved revision detail. 1/27/2005 9:41:57 AM
BLD-Framing/Rough-in1/24/20051/25/20051/25/2005PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 1/24/2005 at 5:00:52 PM. Contact: ###-####.
east wing framing ok 1/25/2005 4:13:20 PM
BLD-Wall cover1/24/20051/25/20051/25/2005PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 1/24/2005 at 5:01:29 PM. Contact: ###-####.
east wing insul/energy ok 1/25/2005 4:14:33 PM
BLD-Framing/Rough-in1/24/20051/24/20051/24/2005PFAIL
DetailsLane Manuel
Scheduled by a contractor via Hello! on 1/24/2005 at 8:35:18 AM. Contact: ###-####.
contr. needs to address fire insp. c/n, and expose areas in studbays to verify HD installations, (already insulated!) 1/24/2005 3:47:08 PM
BLD-Framing/Rough-in1/19/20051/20/20051/20/2005AFAIL
DetailsLane Manuel
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Wall cover1/19/20051/20/20051/20/2005PCANC
DetailsLane Manuel
robbie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in12/1/200412/2/200412/2/2004ACANC
DetailsTroy James
Scheduled by a contractor via Hello! on 12/1/2004 at 2:36:20 PM. Contact: ###-####. Roof nailing/center only JRR
BLD-Framing/Rough-in12/1/200412/2/200412/2/2004APART
DetailsTroy James
Scheduled by a contractor via Hello! on 12/1/2004 at 2:36:20 PM. Contact: ###-####. shear ok upper roof and walls, still need to verify from engineer 2x6 studs ok at holdowns 12/2/2004 9:05:44 AM 12/2/2004 9:09:59 AM
BLD-Framing/Rough-in11/15/200411/15/200411/15/2004PPART
DetailsLane Manuel
Robbie Miller-Shear Wall & Nailing Only; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
roof and shear nailing ok. Engineer to address use of doubled 2x6 s in lieu of 4x members @ 2:12 shear walls (A). 11/15/2004 1:15:58 PM
BLD-Framing/Rough-in10/28/200410/28/200410/28/2004PNR
DetailsTroy James
Scheduled by a contractor via Hello! on 10/28/2004 at 10:01:54 AM. Contact: ###-####.
BLD-Foundation10/6/200410/6/200410/6/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 10/6/2004 at 10:02:05 AM. Contact: ###-####.
slab w/ thickened interior footings OK. Verified 2" rigid insulation @ slab/stemwall perimeter 10/6/2004 1:58:34 PM
BLD-Foundation10/5/200410/5/200410/5/2004PNR
DetailsLane Manuel
Scheduled by a contractor via Hello! on 10/5/2004 at 8:10:39 AM. Contact: ###-####.
contr. to reschedule. No rebar in interior walls/footings 10/5/2004 4:25:12 PM
BLD-Foundation9/10/20049/10/20049/10/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 9/10/2004 at 7:27:11 AM. Contact: ###-####.
perimeter stemwalls ok 9/10/2004 3:02:51 PM
BLD-Footing9/7/20049/8/20049/8/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 9/7/2004 at 7:56:07 PM. Contact: ###-####.
perimeter footings/piers ok 9/8/2004 4:19:33 PM
Inspection Record Card- Bld  9/1/2004 DONE
Print Occupancy Form  9/1/2004 DONE
(F) Reprint permit  7/29/2004  
Issue PAID IN FULL permit  7/28/2004 DONE
Inspection Record Card- Bld  7/27/2004 DONE
Print Occupancy Form  7/27/2004 DONE
Permit Ready to Issue  7/27/2004 DONE
Telephone call  7/27/2004 DONE
Spoke with Candace and told her that permit is ready & fees and that we need ACHD info///7/27/04 10:40 am BAM
Routing - PLAN CHECK7/19/2004 7/26/2004  
Routing - PLANNING7/26/2004 7/26/2004 PASS
Approved per DRH04-9 and as noted on sheet DR-2 for additional street tree along Allante and that the trellis structure be located adjacent to the 2-story part of the building.
Routing - PLAN CHECK7/26/2004 7/26/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/26/2004 DONE
Plan assigned to (JCM)5/17/2004 7/26/2004 PASS
DetailsJohn Menard
7/26/2004 16:32:42 JCM - activity updated through activity BLDA022 from case BLD04-01048.
Routing - FIRE7/14/2004 7/19/2004 PASS
resubmittal acceptable.
Routing - PLANNING7/19/2004 7/19/2004 FAIL
DRH04-9 conditions not met. Also, see 5/28/04 routing activity entry for Planning, which states that plans have not been revised per conditions 1j and 1k.
Routing Off Site - STRUCTURAL7/14/2004 7/16/2004 PASS
Called PDQ for pick - up DLD - Received a faxed letter from the consulting structural engineer approving the resubmittals. JCM
Plan Reviewer's activity  7/14/2004 PASS
Reviewed and approved resubmittals with attached comment list. JCM
Routing - PLAN CHECK6/15/2004 7/14/2004 PASS
Plan resubmittals received  7/14/2004 DONE
Received transmittal letter, 3 copies of the united water flow information, flow copies of the design loads, three sets of sheets 2, 3, 7, 8, taken to John
Routing - FIRE6/10/2004 6/15/2004 FAIL
Resubmittal required for water flow information at the hydrant (United Water) and more information for the proposed access controlled egress doors.
Plan Review Completed(1st rev)  6/15/2004 FAIL
Failed plan check, structural and fire.
Routing - PLAN CHECK6/7/2004 6/10/2004 FAIL
Plan resubmittals requested  6/10/2004 DONE
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
Plan resubmittals requested  6/7/2004  
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLUMBING6/4/2004 6/7/2004 PASS
pipe 3/4" hot and cold water to restroom groups, thermol expantion protection will be required at the water heater.
Routing - PLANNING5/28/2004 6/3/2004 PEND
Need additoinal information per DRH04-9. Revised landscape plans submitted, but may/may not need to add trees per condition 1b (existing street trees not shown on resubmitted plan). Also, revised plans and documents have not been submitted for staff review per conditions 1j and 1k.
Routing Off Site - STRUCTURAL5/17/2004 6/1/2004 FAIL
Received fax form consulting structural engineer requesting revisions. JCM
Routing - Erosion and Sediment5/27/2004 5/28/2004 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS5/19/2004 5/27/2004 PASS
Routing - PLANNING Land Div5/17/2004 5/19/2004 PASS
Lot 24, Block 1 of Century Landmark
Plans ACCEPTED BY PLAN TECH  5/17/2004 DONE
Application received  5/13/2004  
Recd Pcfee & Taken To Pln CK  5/13/2004  
Fee Review-notes5/13/20045/13/2004