Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-01051
StatusFinaled
Name CAFCO INC
Site Address 9958 W FAIRVIEW AVE
Project NameEurope Delicious Bakery
Customer Number 
ePlanReviewNo
Description
Europe Delicious Bakery - To construct a 7063 sq. ft. Type VA, two story shell building with three separate tenant spaces. First floor to have an 2076 sq. ft. future tenant space and a 3876 sq. ft. tenant space for the future bakery. The second floor future tenant space has been designed for a Group R-3 occupancy only with one exit and 40 # floor load. A conditional use permit shall be required for the residence on the second floor. Other work includes all site improvements, paving and landscaping per approved plans and attachments. No occupancy is allowed under this shell permit. All tenant spaces will require separate plans and permits to be provided prior to any construction beyond the shell. As being a fire-resisitive building all basic fire rated construction for the shell as shown on the approved plans must be completed. Tenant Improvement permit for the bakery is under BLD04-01882 and has been included with the approved plans. letter of completion only
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/20/2014  
Case Summary (BLD)  11/20/2014  
Case Summary (BLD)  7/22/2010 DONE
Case Summary (BLD)  7/2/2010  
PubWorks Occupancy Approval8/25/20058/25/20058/25/2005 DONE
Drainage project approved by engineer. Signed permanent occupancy 8/25/05. B.Murphy
BLD-Final6/23/20056/23/20056/23/2005PPART
DetailsJim Sly
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
OK for Temp Occ. C/N..... Need Mech and Public works to sign for Perm Occ. Obtain Perm Occ status within 90 days of this notice
FIRE-Final Inspection6/23/20056/23/20056/23/2005APASS
DetailsForrest France
Fire life safety finaled.
Letter of compliance  6/23/2005 DONE
Letter of Compliance issued 6-23-05.
FIRE-Final Inspection6/22/20056/22/20056/22/2005PFAIL
DetailsForrest France
HVAC RTU at northeast corner of building failed to shut down upon smoke detection, all remaining life safety issues are satisfactory.
FIRE-Final Inspection6/21/20056/21/20056/21/2005AFAIL
DetailsForrest France
Duct smoke detectors failed to shut HVAC units off upon activation, exit discharge lighting at three locations still not working, door hardware at two doors is not approved.
BLD-Final6/20/20056/20/20056/20/2005PFAIL
DetailsForrest France
Exit discharge lighting at three locations did not operate under emergency power, max occ. signs not installed, not all door hardware has been installed , still need to test duct smoke detectors and annunciators, hood suppresion system not ready to test.
(F) Reprint permit  6/17/2005 DONE
Inspection Record Card- Bld  6/17/2005  
BLD-Final6/16/20056/16/20056/16/2005PNR
DetailsJim Sly
bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Met with Troy C and owner to go over code issues. (Fire life/safety and structural issues)
FIRE-Final Inspection6/16/20056/16/20056/16/2005PFAIL
DetailsTroy Cobbley
Provide panic hardware on both north doors and the one west exit door from the banquet room. Provide exit discharge lighting on the banquet room doors and the coffee shop doors. Provide maximum occupant load signs for the banquet room "184" and the coffee shop "56". Provide ADA approved hardware on all doors. Install and test the duct smoke detectors and the remote annunciators. Provide hood suppression system for the type 1 hood with permit.
FIRE-Final Inspection6/14/20056/15/20056/15/2005AFAIL
DetailsTroy Cobbley
bill; Phone #: ###-#### Remove thumbturn locks from east exit doors, Provide "Door to remain unlocked when building is occupied" at both of the east exit doors, test duct smoke detectors and provide with approved remote annunciators, provide address numbers viewable from Fairview. Fixed seating is not allowed per shell permit review comments.
BLD-Conference5/27/20055/31/20055/31/2005ACANC
DetailsJim Sly
bill ###-#### says per dixie's request
Override - Parcel Holds  5/27/2005  
Override - Parcel Holds  5/27/2005  
Override - Parcel Holds  5/27/2005  
Override - Parcel Holds  5/27/2005  
BLD-Conference4/28/20054/29/20054/29/2005ACANC
DetailsJim Sly
per your request Internet Inspection Request from: Letitia Mesa
BLD-Conference4/28/20054/29/20054/29/2005ADONE
DetailsJim Sly
per your request Internet Inspection Request from: Letitia Mesa George Slane has had a discussion with the new Contractor (Bill) on this job about his responsibility to follow Requests per Bldg, Plumb, and Mech inspectors per their Correction Notices. George said that the Contractor understands all corrections that are posted. Selected Corrections are as follows. Structural: Do not go beyond the scope of work approved by the City of Boise. Do not cover Plumbing installed W/O permit (ie. for 2nd story R-3) or area of Kitchen where new hood to be located. I have allowed Contr to cover selected areas per appr plan. No additional work to be completed on future tenant spaces, including R-3 space (2nd floor), W/O Bldg permit . Mech Corrections: Do not rock Kitchen. Plumbing was asked to inspect and approve Plumbing installed for R-3 and said they would when a permit is issued. for that area. 4/29/2005 12:24:06 PM 4/29/2005 12:36:30 PM
Override - Parcel Holds1/1/19001/1/19004/28/2005  
Override - Parcel Holds1/1/19001/1/19004/28/2005  
BLD-Conference4/14/20054/15/20054/15/2005APART
DetailsJim Sly
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Ok to rock lid... exept Kitch and portion below 2nd story. 4/15/2005 12:02:22 PM
BLD-Framing/Rough-in4/11/20054/12/20054/12/2005ANR
DetailsJim Sly
bill ###-#### Complete Corr. 4/12/2005 11:05:34 AM
(F) Reprint permit  4/7/2005 DONE
BLD-Framing/Rough-in4/4/20054/4/20054/4/2005PFAIL
DetailsJim Sly
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N posted. 4/4/2005 3:14:31 PM
BLD-Conference3/24/20053/25/20053/25/2005APART
DetailsJim Sly
###-#### bill Talked with Mike Otto.....Need 1hr roof/ceiling and floor/ceiling assembly through out.... talked with Bill (contractor) about this. 3/25/2005 11:31:17 AM
BLD-Conference3/23/20053/24/20053/24/2005ANR
DetailsJim Sly
BILL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Override - Parcel Holds  3/24/2005  
BLD-Conference2/22/20052/22/20052/22/2005PPART
DetailsJim Sly
Bill; Phone #: ###-#### Internet Inspection Request from: Jan Rice Met with Bill.....(new Contractor) Corr notice.....Notify City of Boise for changes of Gen Contr, Eng of record or Arch of record. Need all Eng and Engineers Calcs. Do not build beyond approved plan. 2/22/2005 3:02:59 PM
BLD-Conference2/7/20052/8/20052/8/2005ADONE
DetailsLane Manuel
BILL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
spoke w/ contr. regarding roof sheathing issues 2/8/2005 11:50:22 AM
(F) Reprint permit  2/2/2005 DONE
BLD-Conference1/7/20051/10/20051/10/2005APART
DetailsJim Sly
Met with Terry of Benchmark Constr. to discuss requirements for completion of this project. They are bidding for the completion. 1/10/2005 12:08:39 PM
BLD-Conference1/7/20051/7/20051/7/2005PCANC
DetailsJim Sly
Terry; Phone #: ###-#### Internet Inspection Request from: Jan Rice canncell reschedule monday - Terry
BLD-Conference12/8/200412/8/200412/8/2004PPART
DetailsJim Sly
Bill; Phone #: ###-#### Internet Inspection Request from: Jan Rice Met with Bill Caferetti........He may be the new Contractor for this job. If so, Advised to change on Case information on project.....Contact City of Boise. Was notified from Mike Otto that B J Developement is no longer the Contractor for this job. 12/8/2004 2:42:56 PM 12/8/2004 2:45:48 PM
BLD-Conference11/12/200411/15/200411/15/2004ANR
DetailsJim Sly
joan ###-#### Joan called and cancelled. 11/15/2004 9:33:13 AM
BLD-Conference11/10/200411/12/200411/12/2004ACANC
DetailsTom Arcoraci
joan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles///canceled per Joan///11/12/01 8:05am BAS
BLD-Conference11/10/200411/12/200411/12/2004ACANC
DetailsTom Arcoraci
joan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Conference11/4/200411/5/200411/5/2004APART
DetailsJim Sly
Joan call 1/2 hr ahead; Phone #: ###-#### Internet Inspection Request from: Jan Rice Met with Joan.... C/N Any changes on Approved Shell/core plan must be resubmitted to Boise City Plan review for approval. Do not build beyond what is on approved plan. 11/5/2004 11:32:48 AM
BLD-Conference11/1/200411/1/200411/1/2004PPART
DetailsJim Sly
Joan please call before you go; Phone #: ###-#### Internet Inspection Request from: Jan Rice 11/1/2004 2:39:52 PM
Issue PAID IN FULL permit  9/28/2004 DONE
(F) Reprint permit  9/28/2004  
(F) Reprint permit  9/28/2004  
Inspection Record Card- Bld  8/17/2004 DONE
Permit Ready to Issue  8/17/2004 DONE
Telephone call  8/17/2004 DONE
left a message for Joan -- permit is ready.
PLANS/APPL TAKEN TO FRONT DESK  8/13/2004 DONE
Plan assigned to (MLO)5/19/2004 8/13/2004 PASS
DetailsMike Otto
8/13/2004 15:50:41 MLO - activity updated through activity BLDA022 from case BLD04-01051.
Routing - PLAN CHECK8/9/2004 8/13/2004 PASS
Plan Reviewer's activity  8/10/2004 DONE
Upon receiving MTI report, a written response by J. Gilliland was faxed to J. Prigge noting the soils report was accepted, but that the special inspection report on the concrete was still required prior to issuance of a foundation permit.
Routing Off Site - STRUCTURAL8/6/2004 8/10/2004 PASS
Called PDQ to take 8/5/04 resubmittal plans to outside engineer.
8/10/04-Outsourced structural review of plans is approved as long as the owner and project architect accept the conditions stated in the soils report conducted by Materials Testing and Inspection (MTI). That report states: "It is recommended that the owner and project architect review the expected level of settlement for suitability with the proposed construction. If this amount of settlement is considered acceptable, the foundation elements may remain in place." (this activity updated by mys)
Routing - FIRE8/6/2004 8/9/2004 PASS
Approved as a Shell permit, based on resubmitted plans, water info, and annotations in "red" on sheet C-1 to show required FD vehicle access/turnaround roadways.
Telephone call  8/6/2004 DONE
I requested Troy Cobbley (Boise City PDS/FIRE inspector) to field verify the accessibility for fire department trucks. His response isT"he east drive way (where the truck would back into to turn around) is ~20 feet wide with room to back into."

I have checked the turning radius' on the plan, the only issue is that the curb to the SW is not shown.

The curb has been demolished around the hydrant on the SW.
Plan resubmittals received  8/5/2004 DONE
3:00 p.m.-The following resubmittals were received: 3 copies of Sheets C-1, A1, A2.0, A2, A3, A4, A5, A6, A7, A8, A9, A10, S1, S2, S3, S4, S5, S6, M-4, P-1, P-2. Received 1 copy of small documents including: Comments to Bldg. Plan Review, comments to structural review, suspended ceiling detail, MTI report dated 7/19/04, sound transmission info, addtl structural calcs dated 7/24/04, NER-392, comchecks on envelope & lighting, fire door assembly, 2hr. rated floorceiling/roof ceiling assembly. Inserted all changes into plans currently in Fire Review.
Routing - PLUMBING8/3/2004 8/4/2004 PASS
In an effort to move this project through the review process I am willing to accept the required resubmitted plans in the field. The required resubmittals are, a civil plan showing the size and location of the sewer and water services, and a plumbing plan showing the size and location of the future waste stack for the 2nd floor fixtures, relocated floor sink at the dishwasher piped to the grease interceptor, the size and location of the required floor drain in the kitchen area and the piping to the CDHD required hand sink on page A2. The requirment to have approved plans prior to begining work is waved for this project only and all work that does not match the required resubmittals will need to be changed to match those plans. The approved set of resubmitted plans will be required prior to any occupancy of this project.
Routing - FIRE8/4/2004 8/4/2004 FAIL
No resubmittals received. Holding plans for architect to resubmit, per my 8/3/04 telcon with him.
Routing - FIRE7/30/2004 8/3/2004 FAIL
Based on discussions with architect Fire is not reviewing until resubmittals come in. Per telcon with architect this morning, the revised plans should be resubmitted later today. Plans have been forwarded on to Plumbing to review. SLR
Meeting  8/2/2004 DONE
Meeting with Joan Prigge, George Slaughter, Teresa Sobotka, Jenifer Gilliland and Marlene Southard to discuss the remaining divisions who need to approved and to discuss the possibility of issuing building permit to allow foundation only when plumbing, structural and fire have approved.
Plan Reviewer's activity  8/2/2004 DONE
8/2/04 at 4:30 p.m.-Took plans to Capital Copy & Print to have one copy made of each of the large plan sheets currently in process. This was requested by George Slaughter.
8/3/04-9:30 a.m.-Copying of plans complete and our routing set was returned to us by Capital Copy & Print. Architect was called by CC&P to pick up the photocopied set and pay for them.
Routing - PUBLIC WORKS7/26/2004 7/28/2004 PASS
Routing - PLANNING7/22/2004 7/23/2004 PASS
Approved per DRH04-45 and as noted on sheet A3, which notes that residential occupancy is not allowed until such use is approved through the application process.
Plan resubmittals requested  7/22/2004 DONE
IBC structural
Routing Off Site - STRUCTURAL7/14/2004 7/22/2004 FAIL
Called PDQ for pick - up corrections sent to architect
Routing - PLAN CHECK7/14/2004 7/22/2004 FAIL
corrections sent to architect.
Plan resubmittals requested  7/22/2004 DONE
IBC non-structural
Plan resubmittals received  7/13/2004  
Received 2 Structural Calcs , & Sheets A1, A2.0,A2.1, A2, A3, A4, A5, A6, A7, A8, A9, A10, S2, S3.1, S3, S4, S5, S6, C-1,A11, E2,E3 Taken to Mike Otto
Routing - Erosion and Sediment6/17/2004 6/17/2004 PASS
ESC approved with conditions attached to plans.
Routing - FIRE6/11/2004 6/16/2004 FAIL
Numerous plan deficiencies, review faxed to architect.
Plan Review Completed(1st rev)  6/16/2004 FAIL
failed public works, plumbing, plan check, structural, ESC, and fire.
Routing - PLAN CHECK6/16/2004 6/16/2004 FAIL
waiting for resubs to continue with review process
Plan resubmittals requested  6/10/2004 DONE
preliminary IBC structural and non-structural reviews, incomplete plans
Routing - PLAN CHECK6/2/2004 6/10/2004 FAIL
Plans are incomplete as submitted. Preliminary review sent to architect. Further review is required. MLO
Routing Off Site - STRUCTURAL5/20/2004 6/10/2004 FAIL
Route to outside engineer via PDQ. Corrections sent to architect
BLD-Other6/9/20046/9/20046/9/2004ADONE
DetailsJim Sly
Jennifer called and asked me to issue a STOP WORK at this address. This was completed 6/7/04 AM. Footings and foundation walls poured W/O inspection. Backfill completed and excavators and plumbers were working on underground Plumbing. There is no Temp Electrical installed. Contractor (lady) was on site when I issued Stop work order for Building W/O Bldg permit. Jim Sly (316).
Routing - PLUMBING5/28/2004 6/2/2004 FAIL
move expantion tank downstream of check valves, provide access to waste system for the future fixtures,upstairs, provide a site plan showing size and locations of sewer and water services to the building, move floor sink out from under dishwasher, provide a floor drain in the kitchen, pipe dishwasher floor sink to the grease interceptor.
Routing - PLANNING5/27/2004 5/28/2004 PASS
Approved per DRH04-00045.
Routing - Erosion and Sediment5/26/2004 5/27/2004 FAIL
ESC plan does not meet requirements from BCC # 8-17.
Routing - PUBLIC WORKS5/19/2004 5/26/2004 FAIL
Failed drainage review per Brian Murphy.
Pending Assignment by JCM5/19/2004 5/19/2004 DONE
DetailsJohn Menard
5/19/2004 10:53:25 JCM - activity updated through activity BLDA174 from case BLD04-01051.
Plans ACCEPTED BY PLAN TECH  5/19/2004 DONE
Routing - PLANNING Land Div5/19/2004 5/19/2004 PASS
Lot 3, Block 1 of Fairview Commercial Park Subdivision.
Application received  5/14/2004  
Recd Pcfee & Taken To Pln CK  5/14/2004  
Fee Review-notes5/14/20045/14/2004   
all of these values are low...don't think they are including the equipment values. R/S Means 112.00 sq.ft. value given is about 26.00 sq.ft. linda