Case Summary (BLD) | | | 11/20/2014 | | |
|
|
|
|
Case Summary (BLD) | | | 11/20/2014 | | |
|
|
|
|
Case Summary (BLD) | | | 7/22/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/2/2010 | | |
|
|
|
|
PubWorks Occupancy Approval | 8/25/2005 | 8/25/2005 | 8/25/2005 | | DONE |
|
|
|
Drainage project approved by engineer. Signed permanent occupancy 8/25/05. B.Murphy
|
BLD-Final | 6/23/2005 | 6/23/2005 | 6/23/2005 | P | PART |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Temp Occ. C/N..... Need Mech and Public works to sign for Perm Occ. Obtain Perm Occ status within 90 days of this notice
|
FIRE-Final Inspection | 6/23/2005 | 6/23/2005 | 6/23/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Letter of compliance | | | 6/23/2005 | | DONE |
|
|
|
Letter of Compliance issued 6-23-05.
|
FIRE-Final Inspection | 6/22/2005 | 6/22/2005 | 6/22/2005 | P | FAIL |
Forrest France
|
|
|
HVAC RTU at northeast corner of building failed to shut down upon smoke detection, all remaining life safety issues are satisfactory.
|
FIRE-Final Inspection | 6/21/2005 | 6/21/2005 | 6/21/2005 | A | FAIL |
Forrest France
|
|
|
Duct smoke detectors failed to shut HVAC units off upon activation, exit discharge lighting at three locations still not working, door hardware at two doors is not approved.
|
BLD-Final | 6/20/2005 | 6/20/2005 | 6/20/2005 | P | FAIL |
Forrest France
|
|
|
Exit discharge lighting at three locations did not operate under emergency power, max occ. signs not installed, not all door hardware has been installed , still need to test duct smoke detectors and annunciators, hood suppresion system not ready to test.
|
(F) Reprint permit | | | 6/17/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/17/2005 | | |
|
|
|
|
BLD-Final | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | NR |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Met with Troy C and owner to go over code issues. (Fire life/safety and structural issues)
|
FIRE-Final Inspection | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide panic hardware on both north doors and the one west exit door from the banquet room. Provide exit discharge lighting on the banquet room doors and the coffee shop doors. Provide maximum occupant load signs for the banquet room "184" and the coffee shop "56". Provide ADA approved hardware on all doors. Install and test the duct smoke detectors and the remote annunciators. Provide hood suppression system for the type 1 hood with permit.
|
FIRE-Final Inspection | 6/14/2005 | 6/15/2005 | 6/15/2005 | A | FAIL |
Troy Cobbley
|
|
|
bill; Phone #: ###-#### Remove thumbturn locks from east exit doors, Provide "Door to remain unlocked when building is occupied" at both of the east exit doors, test duct smoke detectors and provide with approved remote annunciators, provide address numbers viewable from Fairview. Fixed seating is not allowed per shell permit review comments.
|
BLD-Conference | 5/27/2005 | 5/31/2005 | 5/31/2005 | A | CANC |
Jim Sly
|
|
|
bill ###-#### says per dixie's request
|
Override - Parcel Holds | | | 5/27/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 5/27/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 5/27/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 5/27/2005 | | |
|
|
|
|
BLD-Conference | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | CANC |
Jim Sly
|
|
|
per your request Internet Inspection Request from: Letitia Mesa
|
BLD-Conference | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | DONE |
Jim Sly
|
|
|
per your request Internet Inspection Request from: Letitia Mesa George Slane has had a discussion with the new Contractor (Bill) on this job about his responsibility to follow Requests per Bldg, Plumb, and Mech inspectors per their Correction Notices. George said that the Contractor understands all corrections that are posted. Selected Corrections are as follows. Structural: Do not go beyond the scope of work approved by the City of Boise. Do not cover Plumbing installed W/O permit (ie. for 2nd story R-3) or area of Kitchen where new hood to be located. I have allowed Contr to cover selected areas per appr plan. No additional work to be completed on future tenant spaces, including R-3 space (2nd floor), W/O Bldg permit . Mech Corrections: Do not rock Kitchen. Plumbing was asked to inspect and approve Plumbing installed for R-3 and said they would when a permit is issued. for that area. 4/29/2005 12:24:06 PM 4/29/2005 12:36:30 PM
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 4/28/2005 | | |
|
|
|
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 4/28/2005 | | |
|
|
|
|
BLD-Conference | 4/14/2005 | 4/15/2005 | 4/15/2005 | A | PART |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Ok to rock lid... exept Kitch and portion below 2nd story. 4/15/2005 12:02:22 PM
|
BLD-Framing/Rough-in | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | NR |
Jim Sly
|
|
|
bill ###-#### Complete Corr. 4/12/2005 11:05:34 AM
|
(F) Reprint permit | | | 4/7/2005 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | FAIL |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N posted. 4/4/2005 3:14:31 PM
|
BLD-Conference | 3/24/2005 | 3/25/2005 | 3/25/2005 | A | PART |
Jim Sly
|
|
|
###-#### bill Talked with Mike Otto.....Need 1hr roof/ceiling and floor/ceiling assembly through out.... talked with Bill (contractor) about this. 3/25/2005 11:31:17 AM
|
BLD-Conference | 3/23/2005 | 3/24/2005 | 3/24/2005 | A | NR |
Jim Sly
|
|
|
BILL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Override - Parcel Holds | | | 3/24/2005 | | |
|
|
|
|
BLD-Conference | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | PART |
Jim Sly
|
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Jan Rice Met with Bill.....(new Contractor) Corr notice.....Notify City of Boise for changes of Gen Contr, Eng of record or Arch of record. Need all Eng and Engineers Calcs. Do not build beyond approved plan. 2/22/2005 3:02:59 PM
|
BLD-Conference | 2/7/2005 | 2/8/2005 | 2/8/2005 | A | DONE |
Lane Manuel
|
|
|
BILL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
spoke w/ contr. regarding roof sheathing issues 2/8/2005 11:50:22 AM
|
(F) Reprint permit | | | 2/2/2005 | | DONE |
|
|
|
|
BLD-Conference | 1/7/2005 | 1/10/2005 | 1/10/2005 | A | PART |
Jim Sly
|
|
|
Met with Terry of Benchmark Constr. to discuss requirements for completion of this project. They are bidding for the completion. 1/10/2005 12:08:39 PM
|
BLD-Conference | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | CANC |
Jim Sly
|
|
|
Terry; Phone #: ###-#### Internet Inspection Request from: Jan Rice canncell reschedule monday - Terry
|
BLD-Conference | 12/8/2004 | 12/8/2004 | 12/8/2004 | P | PART |
Jim Sly
|
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Jan Rice Met with Bill Caferetti........He may be the new Contractor for this job. If so, Advised to change on Case information on project.....Contact City of Boise. Was notified from Mike Otto that B J Developement is no longer the Contractor for this job. 12/8/2004 2:42:56 PM 12/8/2004 2:45:48 PM
|
BLD-Conference | 11/12/2004 | 11/15/2004 | 11/15/2004 | A | NR |
Jim Sly
|
|
|
joan ###-#### Joan called and cancelled. 11/15/2004 9:33:13 AM
|
BLD-Conference | 11/10/2004 | 11/12/2004 | 11/12/2004 | A | CANC |
Tom Arcoraci
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles///canceled per Joan///11/12/01 8:05am BAS
|
BLD-Conference | 11/10/2004 | 11/12/2004 | 11/12/2004 | A | CANC |
Tom Arcoraci
|
|
|
joan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 11/4/2004 | 11/5/2004 | 11/5/2004 | A | PART |
Jim Sly
|
|
|
Joan call 1/2 hr ahead; Phone #: ###-#### Internet Inspection Request from: Jan Rice Met with Joan.... C/N Any changes on Approved Shell/core plan must be resubmitted to Boise City Plan review for approval. Do not build beyond what is on approved plan. 11/5/2004 11:32:48 AM
|
BLD-Conference | 11/1/2004 | 11/1/2004 | 11/1/2004 | P | PART |
Jim Sly
|
|
|
Joan please call before you go; Phone #: ###-#### Internet Inspection Request from: Jan Rice 11/1/2004 2:39:52 PM
|
Issue PAID IN FULL permit | | | 9/28/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/28/2004 | | |
|
|
|
|
(F) Reprint permit | | | 9/28/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/17/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/17/2004 | | DONE |
|
|
|
|
Telephone call | | | 8/17/2004 | | DONE |
|
|
|
left a message for Joan -- permit is ready.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2004 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 5/19/2004 | | 8/13/2004 | | PASS |
Mike Otto
|
|
|
8/13/2004 15:50:41 MLO - activity updated through activity BLDA022 from case BLD04-01051.
|
Routing - PLAN CHECK | 8/9/2004 | | 8/13/2004 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/10/2004 | | DONE |
|
|
|
Upon receiving MTI report, a written response by J. Gilliland was faxed to J. Prigge noting the soils report was accepted, but that the special inspection report on the concrete was still required prior to issuance of a foundation permit.
|
Routing Off Site - STRUCTURAL | 8/6/2004 | | 8/10/2004 | | PASS |
|
|
|
Called PDQ to take 8/5/04 resubmittal plans to outside engineer.
8/10/04-Outsourced structural review of plans is approved as long as the owner and project architect accept the conditions stated in the soils report conducted by Materials Testing and Inspection (MTI). That report states: "It is recommended that the owner and project architect review the expected level of settlement for suitability with the proposed construction. If this amount of settlement is considered acceptable, the foundation elements may remain in place." (this activity updated by mys)
|
Routing - FIRE | 8/6/2004 | | 8/9/2004 | | PASS |
|
|
|
Approved as a Shell permit, based on resubmitted plans, water info, and annotations in "red" on sheet C-1 to show required FD vehicle access/turnaround roadways.
|
Telephone call | | | 8/6/2004 | | DONE |
|
|
|
I requested Troy Cobbley (Boise City PDS/FIRE inspector) to field verify the accessibility for fire department trucks. His response isT"he east drive way (where the truck would back into to turn around) is ~20 feet wide with room to back into."
I have checked the turning radius' on the plan, the only issue is that the curb to the SW is not shown.
The curb has been demolished around the hydrant on the SW.
|
Plan resubmittals received | | | 8/5/2004 | | DONE |
|
|
|
3:00 p.m.-The following resubmittals were received: 3 copies of Sheets C-1, A1, A2.0, A2, A3, A4, A5, A6, A7, A8, A9, A10, S1, S2, S3, S4, S5, S6, M-4, P-1, P-2. Received 1 copy of small documents including: Comments to Bldg. Plan Review, comments to structural review, suspended ceiling detail, MTI report dated 7/19/04, sound transmission info, addtl structural calcs dated 7/24/04, NER-392, comchecks on envelope & lighting, fire door assembly, 2hr. rated floorceiling/roof ceiling assembly. Inserted all changes into plans currently in Fire Review.
|
Routing - PLUMBING | 8/3/2004 | | 8/4/2004 | | PASS |
|
|
|
In an effort to move this project through the review process I am willing to accept the required resubmitted plans in the field. The required resubmittals are, a civil plan showing the size and location of the sewer and water services, and a plumbing plan showing the size and location of the future waste stack for the 2nd floor fixtures, relocated floor sink at the dishwasher piped to the grease interceptor, the size and location of the required floor drain in the kitchen area and the piping to the CDHD required hand sink on page A2. The requirment to have approved plans prior to begining work is waved for this project only and all work that does not match the required resubmittals will need to be changed to match those plans. The approved set of resubmitted plans will be required prior to any occupancy of this project.
|
Routing - FIRE | 8/4/2004 | | 8/4/2004 | | FAIL |
|
|
|
No resubmittals received. Holding plans for architect to resubmit, per my 8/3/04 telcon with him.
|
Routing - FIRE | 7/30/2004 | | 8/3/2004 | | FAIL |
|
|
|
Based on discussions with architect Fire is not reviewing until resubmittals come in. Per telcon with architect this morning, the revised plans should be resubmitted later today. Plans have been forwarded on to Plumbing to review. SLR
|
Meeting | | | 8/2/2004 | | DONE |
|
|
|
Meeting with Joan Prigge, George Slaughter, Teresa Sobotka, Jenifer Gilliland and Marlene Southard to discuss the remaining divisions who need to approved and to discuss the possibility of issuing building permit to allow foundation only when plumbing, structural and fire have approved.
|
Plan Reviewer's activity | | | 8/2/2004 | | DONE |
|
|
|
8/2/04 at 4:30 p.m.-Took plans to Capital Copy & Print to have one copy made of each of the large plan sheets currently in process. This was requested by George Slaughter.
8/3/04-9:30 a.m.-Copying of plans complete and our routing set was returned to us by Capital Copy & Print. Architect was called by CC&P to pick up the photocopied set and pay for them.
|
Routing - PUBLIC WORKS | 7/26/2004 | | 7/28/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 7/22/2004 | | 7/23/2004 | | PASS |
|
|
|
Approved per DRH04-45 and as noted on sheet A3, which notes that residential occupancy is not allowed until such use is approved through the application process.
|
Plan resubmittals requested | | | 7/22/2004 | | DONE |
|
|
|
IBC structural
|
Routing Off Site - STRUCTURAL | 7/14/2004 | | 7/22/2004 | | FAIL |
|
|
|
Called PDQ for pick - up corrections sent to architect
|
Routing - PLAN CHECK | 7/14/2004 | | 7/22/2004 | | FAIL |
|
|
|
corrections sent to architect.
|
Plan resubmittals requested | | | 7/22/2004 | | DONE |
|
|
|
IBC non-structural
|
Plan resubmittals received | | | 7/13/2004 | | |
|
|
|
Received 2 Structural Calcs , & Sheets A1, A2.0,A2.1, A2, A3, A4, A5, A6, A7, A8, A9, A10, S2, S3.1, S3, S4, S5, S6, C-1,A11, E2,E3 Taken to Mike Otto
|
Routing - Erosion and Sediment | 6/17/2004 | | 6/17/2004 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - FIRE | 6/11/2004 | | 6/16/2004 | | FAIL |
|
|
|
Numerous plan deficiencies, review faxed to architect.
|
Plan Review Completed(1st rev) | | | 6/16/2004 | | FAIL |
|
|
|
failed public works, plumbing, plan check, structural, ESC, and fire.
|
Routing - PLAN CHECK | 6/16/2004 | | 6/16/2004 | | FAIL |
|
|
|
waiting for resubs to continue with review process
|
Plan resubmittals requested | | | 6/10/2004 | | DONE |
|
|
|
preliminary IBC structural and non-structural reviews, incomplete plans
|
Routing - PLAN CHECK | 6/2/2004 | | 6/10/2004 | | FAIL |
|
|
|
Plans are incomplete as submitted. Preliminary review sent to architect. Further review is required. MLO
|
Routing Off Site - STRUCTURAL | 5/20/2004 | | 6/10/2004 | | FAIL |
|
|
|
Route to outside engineer via PDQ. Corrections sent to architect
|
BLD-Other | 6/9/2004 | 6/9/2004 | 6/9/2004 | A | DONE |
Jim Sly
|
|
|
Jennifer called and asked me to issue a STOP WORK at this address. This was completed 6/7/04 AM. Footings and foundation walls poured W/O inspection. Backfill completed and excavators and plumbers were working on underground Plumbing. There is no Temp Electrical installed. Contractor (lady) was on site when I issued Stop work order for Building W/O Bldg permit. Jim Sly (316).
|
Routing - PLUMBING | 5/28/2004 | | 6/2/2004 | | FAIL |
|
|
|
move expantion tank downstream of check valves, provide access to waste system for the future fixtures,upstairs, provide a site plan showing size and locations of sewer and water services to the building, move floor sink out from under dishwasher, provide a floor drain in the kitchen, pipe dishwasher floor sink to the grease interceptor.
|
Routing - PLANNING | 5/27/2004 | | 5/28/2004 | | PASS |
|
|
|
Approved per DRH04-00045.
|
Routing - Erosion and Sediment | 5/26/2004 | | 5/27/2004 | | FAIL |
|
|
|
ESC plan does not meet requirements from BCC # 8-17.
|
Routing - PUBLIC WORKS | 5/19/2004 | | 5/26/2004 | | FAIL |
|
|
|
Failed drainage review per Brian Murphy.
|
Pending Assignment by JCM | 5/19/2004 | | 5/19/2004 | | DONE |
John Menard
|
|
|
5/19/2004 10:53:25 JCM - activity updated through activity BLDA174 from case BLD04-01051.
|
Plans ACCEPTED BY PLAN TECH | | | 5/19/2004 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 5/19/2004 | | 5/19/2004 | | PASS |
|
|
|
Lot 3, Block 1 of Fairview Commercial Park Subdivision.
|
Application received | | | 5/14/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/14/2004 | | |
|
|
|
|
Fee Review-notes | 5/14/2004 | 5/14/2004 | | | |
|
|
|
all of these values are low...don't think they are including the equipment values. R/S Means 112.00 sq.ft. value given is about 26.00 sq.ft. linda
|