Third Notice BLD | 5/20/2005 | 5/20/2005 | 8/27/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/18/2005 | 4/26/2005 | | DONE |
|
|
|
|
BLD-Final | 2/16/2005 | 2/18/2005 | 2/18/2005 | A | PASS |
Jim Storey
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles final ok pending health sign off.
|
Permanent Occupancy | | 2/18/2005 | 2/18/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/16/2005 | 2/18/2005 | 2/18/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 2/18/2005 10:41:46 AM
|
Permanent occupancy | | | 2/18/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10455 issued 2-18-05 to Baja Fresh in the Banks, LLC bldg.
|
BLD-Framing/Rough-in | 2/8/2005 | 2/9/2005 | 2/9/2005 | A | PART |
Dave Hannah
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Jan Rice ceiling grid ok to drop in pannels 2/9/2005 10:56:53 AM
|
FIRE-Conference | 1/27/2005 | 1/28/2005 | 1/28/2005 | A | PART |
Rick Jackson
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Location of manual pull for extinguishing system will be 10 ft from hood 1/28/2005 9:42:47 AM
|
BLD-Framing/Rough-in | 12/30/2004 | 12/30/2004 | 12/30/2004 | P | PART |
Jim Storey
|
|
|
Odie; Phone #: ###-#### Internet Inspection Request from: Jan Rice top track conection to be insp at ceilling insp. 12/30/2004 1:25:14 PM
|
BLD-Aging Inspection | 11/17/2004 | 11/17/2004 | 11/17/2004 | | NR |
Jim Storey
|
|
|
plm work performed. 11/17/2004 9:36:51 AM
|
Print Occupancy Form | | | 11/12/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/18/2004 | | DONE |
|
|
|
|
Telephone call | | | 7/12/2004 | | DONE |
|
|
|
left mess with doug rocine at ###-#### that permit is ready
|
Plan assigned to (R_H) | 6/2/2004 | | 6/21/2004 | | PASS |
|
|
|
6/21/2004 10:25:01 RMH - activity updated through activity BLDA022 from case BLD04-01063.
|
Routing - PLAN CHECK | 6/21/2004 | | 6/21/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/21/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/21/2004 | | DONE |
|
|
|
|
Telephone call | | | 6/21/2004 | | DONE |
|
|
|
permit ready and fee due (Doug Racine)
|
Routing - FIRE | 6/15/2004 | | 6/18/2004 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 6/18/2004 | | FAIL |
|
|
|
failed Planing Land Div.
|
Case Summary (BLD) | | | 6/15/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/15/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 6/8/2004 | | 6/15/2004 | | PEND |
|
|
|
No corrections required by building department review, Routed plans to the fire department for review on 6/15/04, Permit pending fire departments review.
|
Routing - PLUMBING | 6/4/2004 | | 6/8/2004 | | PASS |
|
|
|
P-1.0 shows a HD-1 at #42 located inside a cabinet, a floor sink, exposed, out from under the cabinet will be required. additional cross connection protection may be required, if an automatic soap dispensor is installed at the mop sink, provide a water supply for it.
|
Routing - PLANNING | 6/3/2004 | | 6/3/2004 | | PASS |
|
|
|
Approved per DRH04-00200 (Marty Santoyo).
|
Routing - PUBLIC WORKS | 5/21/2004 | | 6/2/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 5/22/2004 | | 5/22/2004 | | PASS |
|
|
|
Approved. No land division at this tim
|
Routing - PLANNING Land Div | 5/21/2004 | | 5/21/2004 | | FAIL |
|
|
|
Need proof of legal land division.
|
Plans ACCEPTED BY PLAN TECH | | | 5/19/2004 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/18/2004 | | DONE |
|
|
|
|
Application received | | | 5/17/2004 | | |
|
|
|
|
Fee Review-notes | 5/18/2004 | 5/18/2004 | | | |
|
|
|
|