Permit Information
Permit NumberBLD04-01073
StatusFinaled
Name MORGAN CONSTRUCTION
Site Address 13108 W PERSIMMON LN
Project NameDr. Garpetti Office
Customer Number 
ePlanReviewNo
Description
To construct a new 3717 sq. ft. one story, type VB dental office with 979 sq. ft. storage\mechanical basement. Other work includes all site improvements, paving and landscaping per approved plans and attachments
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD5/20/20055/20/200511/3/2005 DONE
First Notice has not been responded to.
First Notice 4/19/20055/20/2005 DONE
Permanent occupancy  4/19/2005 DONE
Perm. Occ. Cert. # 10535 issued 4-19-05 to Dr. Dennis Garpetti.
Permanent Occupancy 4/18/20054/18/2005 DONE
Details
BLD-Final4/15/20054/18/20054/18/2005APASS
DetailsJim Sly
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Mech approved resubmittal for conditioned crawl......Bldg approved also. OK for Perm Occ. 4/18/2005 11:37:34 AM
BLD-Final4/14/20054/15/20054/15/2005AFAIL
DetailsJim Sly
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Told Scott that I need Mech approval for revised conditioned crawlspace B 4 I final. 4/15/2005 11:11:28 AM
Plan resubmittals received  4/12/2005 DONE
Received Transmittal Letter, & 2 Copys of sheet M1 Taken to Mike O.
Routing - PLAN CHECK4/12/2005 4/12/2005 PASS
minor revision ok MLO
Code Occupancy Approval4/7/20054/7/20054/7/2005APASS
DetailsCarol Montgomery
ike rack is in - Compliance with permit. Final 4/7/2005 9:29:49 AM
Plan resubmittals received  4/7/2005 DONE
Received Transmittal Letter, 2 Copys of sheets G-1,A-4.1,A-5.1,M-1 Taken to Mike O.
Temporary occupancy  3/14/2005 DONE
Temp. Occ. Cert. # 5221 issued 3-14-05 to the Dr. Garpetti office.
BLD-Final3/10/20053/11/20053/11/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/10/2005 at 5:16:06 PM. Contact: ###-####. OK for Temp Occ. C/N Need underfloor insul, remove non rated vapor barrier Bsmnt walls Need Code Enf final All within 90 days of this notice. 3/11/2005 12:07:13 PM
FIRE-Final Inspection3/9/20053/10/20053/10/2005APASS
DetailsTroy Cobbley
Fire life safety finaled 3/10/2005 1:57:31 PM
BLD-Final3/9/20053/10/20053/10/2005ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/9/2005 at 6:42:51 PM. Contact: ###-####.
BLD-Final3/10/20053/10/20053/10/2005PNR
DetailsJim Sly
Scott; Phone #: ###-#### Internet Inspection Request from: Jan Rice
FIRE-Final Inspection3/8/20053/9/20053/9/2005PFAIL
DetailsTroy Cobbley
Provide exit signs and emergency light at the north east exit. Provide battery backup in the two exit signs out the main exit 3/9/2005 4:04:13 PM
BLD-Framing/Rough-in2/16/20052/17/20052/17/2005APASS
DetailsJim Sly
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Grid OK. 2/18/2005 12:36:31 PM
BLD-Energy code compliance1/3/20051/4/20051/4/2005APASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: scott Hawker
BLD-Energy code compliance1/2/20051/3/20051/3/2005ANR
DetailsJim Sly
Please call Scott Hawker prior to going to site for inspection; Phone #: ###-#### Internet Inspection Request from: scott Hawker
BLD-Framing/Rough-in12/29/200412/30/200412/30/2004APASS
DetailsJim Sly
Justin; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in12/22/200412/23/200412/23/2004PFAIL
DetailsLane Manuel
Justin ###-#### Internet Inspection Request from: Jan Rice
C/N POSTED 12/23/2004 2:16:43 PM
BLD-Foundation9/3/20049/7/20049/7/2004APASS
DetailsTom Arcoraci
chris; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing8/30/20048/30/20048/30/2004PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/30/2004 at 8:35:15 AM. Contact: ###-####. Footings OK No special insp req. Not on plans....called engineer at Stapley ... Greg said 2500 PSI design. 8/30/2004 2:17:50 PM
(F) Reprint permit  7/28/2004  
Issue PAID IN FULL permit  7/27/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/26/2004 DONE
Permit Ready to Issue  7/26/2004 DONE
Inspection Record Card- Bld  7/26/2004 DONE
Print Occupancy Form  7/26/2004 DONE
Telephone call  7/26/2004 DONE
left mess for andres davis ###-#### that permit is ready
Plan assigned to (MLO)5/25/2004 7/26/2004 PASS
DetailsMike Otto
7/26/2004 14:04:42 MLO - activity updated through activity BLDA022 from case BLD04-01073.
Routing - FIRE7/22/2004 7/23/2004 PASS
resubmittal acceptable.
Plan resubmittals received  7/22/2004 DONE
Received letter of transmittal with two sets of sheets A-1.1,A4.1,A5.2,A8.1, Taken to Mike O.
Routing - PLAN CHECK7/22/2004 7/22/2004 PASS
Plan resubmittals received  7/19/2004 DONE
Received Transmittal Letter, and 2 Sets of G-1, SD-1, A-1.1, A-1.2, A-2.1, A-2.2, A3.1, A4.1, A5.1, A5.2, A7.1, A7.2, A8.1, A9.1, A10.1, ID-1 Taken to Mike Otto...
Routing - FIRE6/22/2004 6/25/2004 FAIL
hyd location, hyd flow and FR const details missing.
Plan Review Completed(1st rev)  6/25/2004 FAIL
failed plan check and Fire.
Plan resubmittals requested  6/22/2004 DONE
IBC corrections
Routing - PLAN CHECK6/16/2004 6/22/2004 FAIL
corrections sent to architect. MLO
Routing - PLUMBING6/14/2004 6/16/2004 PASS
1. sunp requires dual pumps on public buildings. 2.. vacuum pump discharge requires a moisture/air seperator on discharge line to roof
Routing - PLANNING6/11/2004 6/14/2004 PASS
Approve per DRH04-7
Routing - Erosion and Sediment6/8/2004 6/11/2004 PASS
ESC plan approved with attached conditions.
PubWorks Occupancy Approval6/9/20046/9/20046/9/2004 DONE
No drainage inspection required per Brian Murphy, 6/9/04. No inspections done.
Routing - PUBLIC WORKS5/25/2004 6/8/2004 PASS
Routing Off Site - STRUCTURAL5/25/2004 6/2/2004 PASS
Contacted PDQ for outside engineering.
Pending Assignment by JCM5/24/2004 5/25/2004 DONE
DetailsJohn Menard
5/25/2004 08:44:30 JCM - activity updated through activity BLDA166 from case BLD04-01073.
Routing - PLANNING Land Div5/25/2004 5/25/2004 DONE
Lot 2, Block 1, Streeper Subdivision
Plans ACCEPTED BY PLAN TECH  5/25/2004 DONE
Plan routing begun/NEW & ADDTN  5/25/2004 DONE
Print Pending Permit.LaserJet4  5/24/2004 DONE
Application received  5/18/2004